International Case Study A pilot project in Lebanon.

Slides:



Advertisements
Similar presentations
Vehicle Access Management System Smart Parking System.
Advertisements

DORII: Training for Pilot Application Evaluation Paolo Gamba Matteo Lanati.
EMS ROMC Environment monitoring system for ROMC..
STAMI (ST Advanced Metering Interface) Web Tool for the advanced management of LV Network Trends in Power Industry in the European Context VIII Antonello.
Multi Functional Digital Fault Recorder
VoIP EE 548 Ashish Kapoor. Characteristics – Centralized and Distributed Control H.323 pushes call control functionality to the endpoint, while still.
Lighting Automation LLC Lighting Automation Smart Lighting Systems.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Shoper 9 Implementation in Chain Store March 2010.
International Case Study: Integrating Measurements of Energy, Water and Gas PRIME advantages & best practices Alfredo Sanz Atmel Corp Director of Operations.
KX-NS1000 Initial Set Up For step by step : 16 May,
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
 Deployed 80 nos. of Single Phase meters, 1 no. of DCU and 1 no. of GPRS router towards Smart Metering.  Sponsored one 12.5 kVA “StreetSmart” street.
Efficient flexibility in room management with SAUTER EY-modulo.
Semester 4 - Chapter 5 – ISDN Overview There are many types of WAN technologies that can be used to solve the problems of users who need network access.
ATS8500 Remote Service Solution
Energy Efficiency in Buildings and Intelligent Urban Lighting Barcelona Pilot Catherine Murphy-O’Connor – Eduardo Jiménez Indra Software.
Notes: For the installation of a PB network, you can use shielded twisted pair copper cable, glass or plastic FO and infrared components. And you can mix.
1 Mitsubishi Electric Co. Mitsubishi Embedded Systems Note: In this presentation we use ZigBee word both for IEEE MAC/PHY applications and whole.
Cyprus Conference 2007 Simplex PoE Clocks. 2 Simplex PoE Clocks.
New AS-i Profinet Gateway AC1401 and AC1402. Date: October 2010© VNC sr/rk Main features of the Gateway  WEB server for remote configuration and diagnosis.
Frankfurt (Germany), 6-9 June 2011 Enel Smart metering in Endesa Meters and More technology Valerio Vadacchino Business Development of Smart Grids and.
Business Models and Scaling Up Successes Maintaining Interoperability By Open-Standards Design in The Power Distribution For Smarter Grid Khalid W. Darwish,
Smart Traffic Signs By: Salil S. Gokhale Preston DeFrancis I can communicate!
SCADA and Telemetry Presented By:.
METERING SOLUTIONS Leon de Nysschen 20 April 2017.
0 024 October 2003 OPERATIVE TOOLS SPECIFIC AGREEMENT ATI (FINMEK SOLUTIONS AS PRIME CONTRACTOR) SHARES INTEGRATION OPERATIVE TOOLS SPECIFIC AGREEMENT.
PART 2: Product Line. Tenor Switches & Gateways Tenor AX Series Solution For Medium to Large Enterprises  Available in 8, 16, 24 and 48 port Available.
Page 1 ADAM-6000 Web-enabled Smart I/O Γιάννης Στάβαρης Technical Manager Ιούνιος 26, 2007.
Remote Service Solutions ATS 8550
Power Line Carrier Communication based Automated Meter Reading System
1 Last Mile Connectivity Challenges in Smart Grid Cigre Colloquium, Mysore, November Chander B Goel Texas Instruments India.
Dashi Naidoo AMR concept evolution to AMM. Presentation scope  Introduction  Smart metering trends  Leveraging the ability to communicate  Technology.
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
NETWORKING. OBJECTIVES Identify network topologies Identify hardware components of a network.
All the components of network are connected to the central device called “hub” which may be a hub, a router or a switch. There is no direct traffic between.
O Meeting: o Presented By: o Date: This project is co-financed by the ERDF and made possible by the INTERREG IVC programme. Guías nacionales en Reino Unido.
Frankfurt (Germany), 6-9 June 2011 Smart Grid Protection in China Wu Guopei Guangzhou Power Supply Bureau Guangdong Power Grid, China.
CCNA 2 Week 1 Routers and WANs. Copyright © 2005 University of Bolton Welcome Back! CCNA 2 deals with routed networks You will learn how to configure.
Advanced Metering Infrastructure (AMI) Project Update Mark Heintzelman June 2010.
Module 8: Managing Terminal Services. Overview Use and manage Terminal Services RemoteApp programs Use and manage Terminal Services Gateway Optimize and.
Communications Infrastructure Development. © 2005 E.ON31 October 2015, Central Networks, Page 2 Current Situation 1.Legacy Comms – RS232, Fibre, Microwave,
M4 Alpha Release August 9 th February 8th, 2006 M4 Alpha Release Modified Agenda Review M4 Objectives, General Concepts and Design Review M4 Development.
Oncor Electric Delivery Intelligent Grid at Oncor Electric Delivery SWEDE Conference Alan Bern – SCADA / Automation Manager May 1, 2008.
1 J. Keller, R. Naues: A Collaborative Virtual Computer Security Lab Amsterdam,Dec 4, 2006 Amsterdam, DEC 4, 2006 Jörg Keller FernUniversität in Hagen,
Proposal for WG3 & WG5 work area split
Power Plus Communications AG
Copyright © Yokogawa Electric Corporation FDT Technology “one tool for all” September 26, 2006 Yokogawa Electric Corporation.
Smart led and leds go technology Levi Eshkol 57/3, Tel Aviv, Israel
SmartMQn Motor Horner APG, LLC September 9, 2008.
Network design Topic 6 Testing and documentation.
Introduction to Energy Management. Week/Lesson 12 Advanced Technology for Effective Facility Control.
Open AMI Network 10/22/08.
MIT requirements from the TSO perspective MIDDLEWARE IMPROVED TECHNOLOGY (MIT) for increased resilience of Interdependent Critical Infrastructure ROME,
Activity 1 5 minutes to discuss and feedback on the following:
Connecting A ZigBee Sensors Network To A Cellular Modem For Remote Control Presenting: Eli Zuaretz Gilad Tiomkin Advisor: Dr. Chen Avin Co Advisor: Ilan.
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
Electricity Distribution Co. EDCO Eng. Hamzeh Alfaqeeh Head of meters section 1.
MUHAMAD SHAZNI BIN MOHAMMAD SHAH. Gateway Using different protocols for interfacing network by network nodes Contain device such as protocol translator,
Évora demonstrator site
Product Introduction --AP Controller M3 Yaojun 26/12/2015
Cisco CCNA Cisco Certified Network Associate CCNA (v3.0)Exam
How SCADA Systems Work?.
in Smart Metering Solutions
Catherine Murphy-O’Connor – Eduardo Jiménez
Substation Automation IT
Customer Woolworths PLC Application Building Management Sector Retail
Smart Grid Projects NSTAR
Pauli Partinen Mikael Aikio
Configuration DB Status report Lana Abadie
Smart Prepayment Solutions for PV/SSEG
Presentation transcript:

International Case Study A pilot project in Lebanon

SELECTION INTEROPER ABILITY DEPLOYMENT PLANNING START-UP MAINTENA NCE

Three different places: Urban areas Semi-Urban areas Rural areas

We need to know the network topology

ASPECTS TO CONSIDER Distances Number of clients Power topology (number of transformers) Type of lines (air, underground) …………

SELECTION INTEROPER ABILITY DEPLOYMENT PLANNING START-UP MAINTENA NCE

THE IMPORTANCE OF TESTING CERTIFICATION DEPLOYMENT APPROVAL IN LABORATORY APPROVAL IN FIELD

CERTIFICATION BASIC (Metrological, etc.) DLMS APPROVAL: METER PROTOCOL PRIME APPROVAL: MODEM plc (SERVICE NODE) NECESSARY…. BUT NOT ENOUGH PENDING: Integration, functional test...…

APPROVAL IN LABORATORY Interoperability Test Functionality Performance Stability … NEW DEVELOPMENTS  NEW TEST MAINTENANCE

APPROVAL IN FIELD SELECT 1-2 secondary substations for test Represent the different scenarios With the same version of PRIME SW Detailed analysis Monitoring the test

DEPLOYMENT As a last step After the test WITH GUARANTEES

Specs Proof of concept Prototyping Lab testing Field deployment

SELECTION INTEROPER ABILITY DEPLOYMENT PLANNING START-UP MAINTENA NCE

GPRS SELECT THE TECHNOLOGY SOLUTIONS

Remote reading (scheduled) PLC MT, GPRS, ADSL, etc. LAN DLMS over PLC PRIME MDM FRONT-END Concentrators DC Smart meters Interface DC- METERS Interface FE-DC Interface MDM-FRONT-END time en d time Operations end SMART METERING ARCHITECTURE

Start DC Communi. Test Meter Comm. Test DC Config. Test Meter Config. Test DC Functio. & Operation Test Meter Functio. & Operation Test END TESTING PROCESS

SELECTION INTEROPER ABILITY DEPLOYMENT PLANNING START-UP MAINTENA NCE

INSTALL + VALIDATE The importance of validation

CONSIDER We need to be clear the deployment plan, and steps to certify an installation I coordinate the installation of data concentrators and meters? or are they two completely independent activities? How can I validate an installation? What tools do I need? Thinking on how to adapt our IT systems to the new way of working

INSTALL IN THE SECONDARY SUBSTATION Cabinet installation Installation of current transformers Power Supply Checking operation equipment DC Communications

INSTALL IN THE CENTRALIZATION Installing Meters Power supply Check functioning and registration LED PRIME!!!!

LED PRIME – PLM: Activity PRIME – PLM: Try to register – PLM: Registered 1000 Imp /KWh – Imp/KVArh flashing: load PHONE: 432 connection INSTALL IN THE CENTRALIZATION (II)

INSTALL IN THE CENTRALIZATION (III) Sequence LED PRIME 1. FLASHING FAST 2. TURNS OFF 3. FLASHING30 seconds 4. GOES TO Try to register 5. GOES TO Registered

VALIDATION OF THE INSTALLATION * Use the DC to validate Monitoring the network PRIME 1.Availability 2.Availability launching measurement cycles

VALIDATION OF THE INSTALLATION (II)

SELECTION INTEROPER ABILITY DEPLOYMENT PLANNING START-UP ROLL-OUT

Poor conditions of some metering rooms

DIAGNOSIS OF THE NETWORK meter as a switch 40:40:22:10:1e:88 meter as a switch c0:ac:54:f4:73:89 meter as terminal 00:80:e1:13:08:94

DIAGNOSIS A network diagnostic for: Topology MAC traffic Noise spectrum …………

Topology MAC Traffic Noise Spectrum

SOME EXAMPLES SELECTIVE NOISE IN FREQUENCY IMPULSE NOISE

THANK YOU VERY MUCH