HIAT'09, 8-12.06.2009-Venezia0 D. Ene, D. Ridikas, B. Rapp, J.C David, D. Doré CEA-Saclay, IRFU/SPHN, F-91191 Gif-sur-Yvette, France for EURISOL Task#5.

Slides:



Advertisements
Similar presentations
Stefan Roesler SC-RP/CERN on behalf of the CERN-SLAC RP Collaboration
Advertisements

HZDR FLUKA activities in support of the MYRRHA Project Short summary with a focus on activation problems Anna Ferrari, Stefan Müller, Jörg Konheiser.
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
13 Oct 2005 ICALEPCS RAMSES: The LHC RAdiation Monitoring System for the Environment and Safety G. Segura CERN on behalf of the RAMSES team.
May 22nd & 23rd 2007 Stockholm EUROTRANS: WP 1.5 Task Containment Assessment IP-EUROTRANS DOMAIN 1 Design WP 1.5 Safety Assessment of the Transmutation.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
2 nd Oxford-Princeton High-Powered Target Workshop, Y. KadiNovember 6, EURISOL DS PROJECT Task#2: MULTI-MW TARGET DESIGN Y. Kadi On behalf of the.
1 Radiation Safety Aspects of the Linear Collider B. Racky, A. Leuschner, N. Tesch Radiation Protection Group TeV Superconducting Linear Accelerator.
EURISOL DS Target Meeting, CERN, CHY.KADIMarch 10-11, EURISOL DS PROJECT Task#2: MULTI-MW TARGET 1st year planning Y. Kadi (AB/ATB) European Organization.
1 JASMIN Activation Experiments (T-972/993/994) Yoshimi Kasugai on behalf of JASMIN Activation team JASMIN Activation team Y. Kasugai, K. Oishi, H. Matsumura,
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
05-Oct-02 L. Moritz TRIUMF 4004 Wesbrook Mall Vancouver, B.C. V6T2A3 SAFERIB Workshop CERN, Oct.30-Nov.1,
Proposal for Experiment S291: " Residual radioactivity induced by U ions - experimental investigation and longtime predictions" GSI, Darmstadt: G.Fehrenbacher,
Radiation Protection considerations concerning a future SPS dump design Helmut Vincke DGS-RP.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
RADIOACTIVE ION BEAMS AT B.RANNOU W.MITTIG M.G.ST LAURENT (GANIL France)
Experimental part: Measurement the energy deposition profile for U ions with energies E=100 MeV/u - 1 GeV/u in iron and copper. Measurement the residual.
Y. Romanets 1, R. Luis 1,J. Bermudez 3, J.C. David 5, D. Ene 5, I. F. Goncalves 1, Y. Kadi 2, C. Kharoua 2, F. Negoita 4, R. Rocca 2, L. Tecchio 3, P.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Managed by UT-Battelle for the Department of Energy Residual Does Rate Analyses for the SNS Accelerator Facility I. Popova, J. Galambos HB2008 August 25-29,
Authorization and Inspection of Cyclotron Facilities Design, Layout and Shielding.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
Nuclear Facilities Decommissioning & Design An introduction to SENAC activities JM. Dumas CEA Saclay, DSM/DAPNIA/SENAC, F Gif-sur-Yvette,
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
EURISOL – Task 11 meeting 2007S. Chabod 1 OUR CONTRIBUTION INSIDE EURISOL TASK 11 OPTIMIZATION OF IN-TARGET NUCLEI YIELDS Target parameters: material (Al.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
HTS Tl-based coatings for FCC beam screens - Radiation Protection Aspects - Markus WIDORSKI, DGS-RP Information on ActiWiz: Courtesy of Chris Theis, DGS-RP.
Radiation Protection in J-PARC neutrino beam line Sep Yuichi Oyama (KEK) for T2K neutrino beam line construction group Happy birthday.
NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
Radiation Protection and Radiation Safety for Particle Accelerator Facilities J. Vollaire, Radiation Protection Group CERN Compact Accelerators for Isotope.
1 July 2004 Radiation Protection Issues 1 M.Brugger, D.Forkel-Wirth, S.Roesler, H.Vincke SC/RP Review of the LHC Collimation Project 30 June – 2 July 2004.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
1 Activation by Medium Energy Beams V. Chetvertkova, E. Mustafin, I. Strasik (GSI, B eschleunigerphysik), L. Latysheva, N. Sobolevskiy (INR RAS), U. Ratzinger.
Ma zhongjian Ding yadong Wang qingbin Wu qingbiao Radiation Protection Group/IHEP.
D. Ene CEA-Saclay, IRFU/SPHN, F Gif-sur-Yvette, France.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Peter Thirolf, WP5/Subtask B EURISOL-DS Town-Meeting, Caen, Status of Radioactivity Control, Status of Radioactivity Control, Safety and Risk.
3 February 2005, J. Lettry 1 Task #3 100 kW direct targets “Development of targets and ion sources for radionuclide production that can accommodate up.
EURISOL DS Task meeting Orsay, 07 Janvier Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
C. Kharoua, Y. Kadi, Thierry Stora, J. Lettry, M. Lindroos (CERN) K. Samec(PSI & CERN) J-C. David, D. Ene(CEA Saclay) L. Tecchioet al. (INFN Legnaro),
March 18, 20051T11 – EURISOL meeting - GSI Aspects of secondary reactions in single- and double-stage targets (ST7) Goal:In-target Yield calculations for.
Paul Scherrer Institut 5232 Villigen PSI EURISOL/BENE_2007, PSI /GF34 Joint High Power Target Meeting EURISOL/BENE , CERN Direct target irradiation.
T5: Safety & Radioprotection MB meeting, 7-8 July 2008, Lisbon, PortugalContact: Task 5: Participants and work plan Participants:role 1.
Safety & Radioprotection 8 Jul. 2005, Liverpool, UK WP 5: Safety & Radioprotection Participants:role 1. GANIL, France - sub-task D 2.
EURISOL, TASK#5, Bucuresti, November 1 Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
V. Raginel, D. Kleiven, D. Wollmann CERN TE-MPE 2HiRadMat Technical Board - 30 March 2016.
EURISOL-DS 6th Coordination Board, IPN-Orsay, FranceJune 12, EURISOL DS PROJECT Task#2: MULTI-MW TARGET DESIGN Y. Kadi On behalf of Task#2 European.
Summary of IAP comments from 2007 EURISOL Town Meeting
P1 – GANIL P2 – CNRS/IN2P3 P3 – INFN P4 – CERN P6 – CEA Saclay P7 – NIPNE Bucarest P18 – PSI Switzerland P19 – IPUL Latvia C2 – BINP Novosibirsk C3 – VNIITF.
Hanna Frånberg Delahaye Radioactive beam production
J. Bauer, V. Bharadwaj, H. Brogonia, A. Fasso, M. Kerimbaev, J. Liu, S
Heating and radiological
Induced-activity experiment:
The BLAIRR Irradiation Facility Hybrid Spallation Target Optimization
Analyses to Support Waste Disposition of SNS Inner Reflector Plug
Radiation protection of Linac4 M. Silari Radiation Protection Group
BEAM INTENSITIES WITH EURISOL
Fassò, N. Nakao, H. Vincke Aug. 2, 2005
CFS consideration on the Main Dump and around
Preliminary Hazard Analysis of Bunker
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Target Station Facility Safety ASPECTs
Presentation transcript:

HIAT'09, Venezia0 D. Ene, D. Ridikas, B. Rapp, J.C David, D. Doré CEA-Saclay, IRFU/SPHN, F Gif-sur-Yvette, France for EURISOL Task#5 Safety & Radioprotection: GANIL, France, FZJ, Germany, LMU, Germany, CERN, EU CEA, France, NIPNE, Romania, FI, Lithuania, Univ. Warsaw, Poland

HIAT'09, Venezia1 Radiation safety issues  the strategy used for the design of RNB facilities EURISOL-DS project (illustration) –early stage Problems addressed: Legislation framework sets-up safety requirements protection of the environment, public and staff Radioactive sources identification and estimation deciding the radiation safety features Safety design objectives: (Protection of workers, public & environment)

HIAT'09, Venezia2 1.Operation phase 1.Operation phase :  Protection against radiations optimum shielding configuration  Protection against radiations => optimum shielding configuration  Containment of radioactive materials risk analysis >  Containment of radioactive materials => risk analysis > equipments are adequate to minimize risk of radioactive material dispersion.  Compatibility with the environment impact of the radioactive releases  Compatibility with the environment => impact of the radioactive releases Radiological studies: Characterization of the prompt radiation field for normal and accident conditions Safety studies: Classification of the events & Risk assessment Environmental studies: Characterization of the specific site & impact assessment 2.Post -operational phase 2.Post -operational phase:  Protection against radiations measures to limit the exposure & working procedures  Protection against radiations => measures to limit the exposure & working procedures during maintenance and interventions machine will be dismantled and decommissioned waste transportation/disposal  Compatibility with the environment impact of the radioactive releases  Compatibility with the environment => impact of the radioactive releases >decommissioning & waste transportation/disposal Radiological studies: assessment of the residual radiation field => specifications on the exposure of the personnel Environmental studies: Characterization of the specific site & impact assessment

HIAT'09, Venezia3

4 Direct: high energy spallation 100 kW -Converter: neutron fission 4MW Al 2 O 3, SiC, UC x, Pb, etc p, 1GeV Direct method p, 1GeV Hg UC x Converter method (~10 15 fiss/s) 235 U + n( ~ 100 keV) 238 U + p( 1GeV) Direct target: R=1.8cm, L=40cm Fission target(30kW) (R ext =1.75cm, R int =0.4cm,H=20cm)

HIAT'09, Venezia5 H*(10) [  Sv h -1 ] Total_H*(10) [mSv y -1 ] Public areas: inside fence Controlled areas1020 / 2000 h Full beam loss: Total_H*(10) ≤ 50  Sv  JUSTIFICATION  LIMITATION  OPTIMISATION Design limits for occupied areas/ ICRP 60 H*(10) [mSv h -1 ] Maintenance constraints >0.1Planification and optimisation of all work >2+ limited intervention time & remote handling >20Remote handling essential CERN guidelines:

HIAT'09, Venezia6 Design guidelines & previous experience => Basic estimates Few exemples: EquipementprimaryEnergyIntensity (pps) Losses (pps) Specific sources Linacp1GeV(1-4)*6* *10 12 /E[MeV] m -1 -Few hot spots -Neutron backscatter Linac#1 (L=209m) 132 Sn (0.6 – 150) MeVu -1 6*10 12 (6* *10 8 )m -1 No spots specification Linac#2 (L=156m) 132 Sn (0.6 – 150) MeVu -1 6* *10 12 (6* *10 8 )m -1 ~4*10 12 ( stripper zone) No spots specification

HIAT'09, Venezia7 Prompt radiation PHITS, FLUKA, MCNPX-HI Mixed  & Conversion factors->H*(10) Ar(95MeV/u)+Cu  neutrons PHITS p(1.6 GeV) + Fe  neutrons (MCNPX) Neutron penetration in concrete shield MCNPX Benchmarks related to prompt radiation

HIAT'09, Venezia8 Residual radiation: Production of Residual Nuclei Benchmarks related to induced activity Neutron flux in i th cell Geometry and materials description DCHAIN- SP-2001/ CINDER PHITS/ MCNPX Residues in i th cell Irradiation Scheme H*(10) MCNPX Activation products & Photon sources 5000h irradiation at 4MW 40 years & duty factor 0.7

HIAT'09, Venezia9 Hg converter and secondary fission targets MAFF-like configuration => NEUTRON STREAMING Monte Carlo & generic studies -> choices of materials & shielding effect First version of design => BULK SHIELDING Biasing methods

HIAT'09, Venezia10 Prompt radiation: BULK SHIELDING + Attenuation formula Iron 100 cm concrete 1 m of iron For θ= 0, 90, 180°  9.0, 8.0 & 6 m of concrete FLUKA (CERN)

HIAT'09, Venezia11 Prompt radiation: NEUTRON STREAMING FLUKA (CERN) Ion extraction tubes Spallatio n target 600 cm Fission targets concrete Fission target handling room 6 m concrete RIB lines Laser portholes ~9 m Z=0 Fission target handling room

HIAT'09, Venezia12 A shield designed for a continous beam loss of m -1 (point loss of 6.25*10 9 ion s - 1 ) during the routine operation is also adequate for an accident loss of the full beam at a localised point, providing that the linac cutoff time is less than 1s. PHITS 132 Sn  Method (CEA)

HIAT'09, Venezia13 E [MeV/u]   [Sv m 2 ion -1 ]  [g cm -2] H  [Sv m 2 ion -1  [g cm -2 ] E E E E E E E E E MeV/u150MeV/u * Agosteo S, Nakamura T, at al. NIM/B 217, 2004 !! neutrons

HIAT'09, Venezia14 U-238 : 400 MeV/u He-3 : 777 MeV/uproton : 1 GeV Beam on stopping Cu target Ronningen & Remec, 2005 Beam direction Photon H*(10) < 3% Total H*(10) 3 m of concrete: Neutron H*(10) for 6 He (250MeV/u) Neutron H*(10) for 132 Sn (150MeV/u) ~ 5 Safety operation domain: energy range and beam intensities. !! Other species & secondaries

HIAT'09, Venezia15 Underground target position Front-end retracts vertically Hot-cell for target exchange Separator in 3 rd level Neighboring hot-cell accessible during run Effective dose rate E (Sv/h) Soil activation! Effective dose rate maps Conceptual design of 100kW target station (CERN)

HIAT'09, Venezia MeV/u RFQ 150 MeV/u beam dump L(1) L(2 ) Experiment rooms 21.3 MeV/u Experiment rooms 44 m 102 m 2.8 W m -1 => 7.92 W 6 W 4 W 2.4 W Stripper 1.68 kW Uncontrolled beam loss of m MeV/u RFQ L(1) L(2 ) Experiment rooms 21.3 MeV/u 150 MeV/u Experiment rooms 44 m 165 m 2.8 W m -1 => 19.8 W 15 W10 W 6 W beam dump Shielding of Postaccelerator (CEA) Staff Energy [MeV] Length [m] Thickness (cm) V staff (m 3 ) *  for a tunnel surface of 3 m x 4m PublicThickness (cm) V public (m 3 ) 536.6*  for a tunnel surface of 3m x 4m Energy [MeV] 21.3 Stripper Length (m) Staff Thickness (cm) V staff (m 3 ) 205.8*  for a tunnel surface of 3 m x 4 m PublicThickness (cm) V public (m 3 ) 343.4*  for a tunnel surface of 3 m x 4 m

HIAT'09, Venezia17 material   [Sv m 2 ]  [g cm -2 ] H  [Sv m 2 ]  [g cm -2 ] SHIELD [cm] StaffPublic concrete1.747E E steel E concrete concrete / steel soil void beam Bea m 5o5o Iron shield Copper + 10% water Graphite (1.84g/cm 3 ) 100 cm40 cm 8 cm16 cm 132 Sn 25+ Beam power = 19.8 kW (150 MeV/u) Beam size σ = 2 mm Beam Dump cavity: thickness of lateral wall (CEA)

HIAT'09, Venezia18 Dose in distance of 1m after 1 day decay time: fission/sec 235 U ion source ~ 10 kCi ‘open’ source Beam tube  Sv/h non-volatile activity ions slit aperture of pre-separator (m=95, 140: 97%) ~  Sv/h slit aperture of high-resolution separator ~ 10 4  Sv/h ~2% non volatile ~68% Dispersion of radioactivity: from MAFF EURISOL  10 higher! P. Thirolf et al. (LMU) exhaust storage tanks outer beam tube ~ 300  Sv/h ~30% ~ 0.02% atoms/ gases regeneration decay on the cryopump slits/targets of beam line ~  Sv/h large small Capability of Cryotrap 3 cryotraps prototypes tested: Retention capability (vs. pressure behind cryotrap) ‘carry over’: fraction of leaking gas load transported across cryotrap Cryotrap works within (simulated) expectations  99.98% of volatile radioactivity can be localized!

HIAT'09, Venezia19 EURISOL-DS RISK REGISTER EquipmentOperational phase and Risk RP [mSv/h] and intervention Risk assessment before mitigation Mitigation of Risk Risk assessment after mitigation OwnerName and location Acronym - Number Action typedesccription of failureDescription of associated riskDose rate Job duration ProbabilityImpactScoreComments - Needed actionsProbabilityImpactScore The methodology used The file format derived from the CERN-AB risk register elaborated by P. Bonnal (05/05/2003)

HIAT'09, Venezia20 EURISOL-DS RISK REGISTER EquipmentOperational phase and Risk RP [mSv/h] and intervention Risk assessment before mitigationMitigation of Risk Risk assessment after mitigation OwnerName and location Acronym - Number Action typedesccription of failure Description of associated risk Dose rate Job duration Probabi lity ImpactScoreComments - Needed actions Probabi lity ImpactScore T2CGS target vessel??? OperationRupture of the vanes Loss of Hg flow, flow blockage and cavitation 224 Instrumentation to control Hg flowrates 212 Explosion by Hg boiling 155Containement of Hg (safety hull)111 Overheating of the window 339 Instrumentation to control Window temperature 313 Partial melting of the window 155Containement of Hg (safety hull)111 Main risks for the Hg converter EURISOL-DS RISK REGISTER EquipmentOperational phase and Risk RP [mSv/h] and intervention Risk assessment before mitigation Mitigation of Risk Risk assessment after mitigation OwnerName and location Acronym - Number Action typedesccription of failureDescription of associated riskDose rate Job duration ProbabilityImpactScoreComments - Needed actionsProbabilityImpactScore T4 UC target/running RU-T- 06 operationfiring target stop of operation, target is lost, removal of target and replace with a new one, clean the pit region. The pit and beam line are highly contaminated. 1PBq avoid oxygen contamination, redondancy of safety valves. Neutral atmosphere during removal may be foreseen 155 Main risks for the Fission target

HIAT'09, Venezia21 1 year after irradiation10 years after irradiation ISABEL- ABLA CEM2kINCL4- ABLA ISABEL- ABLA CEM2kINCL4- ABLA Total activity Half life Au d Gd 74.6 y H3H y Hf 1.87 y Hg 444 y UCx Hg Direct target | CEM2k UCx( L=40cm, R=1.8cm) MMW target Hg 235 U: 7% halogens 10% rare gases 1% actinides

HIAT'09, Venezia22 Activity map at 100days Stainless steelConcrete Activities Mases Waste categories

HIAT'09, Venezia23 Activation of Cu structure (150 MeV/u) Activation of concrete (150 MeV/u) Air activation (150 MeV/u) Total activity due to implantation Contribution of the wall is not significant Air activation using PHITS (evaluated cross sections) 14,15 O, 13 N | 41 Ar 0.35Bq cm -3 Activity vs Discharge limit Inhalation dose received by workers intervening in tunnel Bq 132 Sn implantation 132 I accumulation after 1h

HIAT'09, Venezia24 21MeV/u 150MeV/u Points -> contact Lines -> 1m distance Total activity H*(10) Residual field: - high energy zone copper structure activation activation -low energy zone ion implantation In the high energy zone continuous accessibility after ~ week cooling time or occupancy factor of minimum 570 hours/year => 20 mSv y -1 Maintenance operations to be planed

HIAT'09, Venezia25 IsotopeT 1/2 SoilGroundwater 3H3H12.33y 3.149* * Be53.12d 3.662* * Na2.6y 7.782* * Na14.96h 7.551* * P14.26d 1.047* * S87.32d 2.262* * Ca162.61d 8.111* * Sc83.79d 6.833* * Mn312.3d 2.217* * Fe2.73y2.679* * Zn244.26d 3.867* * Specific activity [Bq cm -3 ] in first 100 cm of soil/groundwater surrounding the concrete wall after 40 y of continous irradiation 1.301*10 4 Bq < 10 5 Bq --LIMIT* *IAEA TECDOC-1000, 1998, Clearance of materials resulting from the use of radionuclides in medicine, industry and research *10 4 Bq < Bq --LIMIT* Transport of radioactive species into the ground does not represent a hazard for the population POSTACCELERATOR

HIAT'09, Venezia26 A schematic layout for liquid Hg-target disposal strategy Extrapolation from laboratory scale to “industrial” scale still to be done! Disposal of liquid Hg (FZJ) Chemical stabilization of Hg as an inorganic compound, e.g. HgS, HgSe, HgO, Hg 2 Cl 2, HgCl 2

HIAT'09, Venezia27 Further steps: Derived Intervention Levels (DIL) Exposure from underground water contamination Development of a resident GIS platform Cadastral Impact Analysis (GIS based) …  Methodology validated, recommended & accepted by safety authorities  Tools, data & knowledge to be used in Environmental and health Impact Assessment DESKTOP ASSISTANT Point Source Exposure Acute Exposure to Environmental Releases Prolonged Exposure to Environmental Releases E-BOOK DATA Libraries Nuclear Facilities Derived Release Limit The Map Manager Combination of knowledge on Accelerator & Research Reactor based nuclear installations  creation of dedicated toolkit for EURISOL DS Toolkit operational both for normal operation and accidental situations! Site dependent analysis to be performed! NIPNE

HIAT'09, Venezia28  Safety integration from the start hints innovative and flexible solutions in maters of safety  EURISOL has similarities with high-power spallation n-sources & small research reactors Very specific features: Use of pyrophoric actinide carbide targets; Presence of alpha-emitters; Distribution over extended buildings of intense RIBs and sources of all chemical nature Dedicated technical standards to be applied under utmost reliable safety rules and procedures.

HIAT'09, Venezia29 Back-up

HIAT'09, Venezia30 Target positions:  Geometry : Last design variant (L. Tecchio): 30kW load heat Last design variant (L. Tecchio): 30kW load heat Volume = 181cm 3 ( R ext =1.75cm, R int =0.4cm,H=20cm ) Volume = 181cm 3 ( R ext =1.75cm, R int =0.4cm,H=20cm )  Material: Targets: graphite + U, density=1.88 g cm -3, Targets: graphite + U, density=1.88 g cm -3, (mass U=15g | mase rate: U/C=1/20, MKLN) (mass U=15g | mase rate: U/C=1/20, MKLN) Moderator: H 2 O, Fe ( 232 Th) Moderator: H 2 O, Fe ( 232 Th) Reflector: BeO, Fe ( 232 Th) Reflector: BeO, Fe ( 232 Th)  Physics parameters: Source: p; E=1GeV,Gauss (σ = 1.5cm) Source: p; E=1GeV,Gauss (σ = 1.5cm) Model:CEM2k Model:CEM2k T=239K T=239K Moderator Reflector Mercury target Iron shielding Concrete Proton beam Fission target z = 0T#5T#1T#3 z = 15T#6T#2T#4 x=> y=> Reflector Iron Fission target Concrete x y z y Results normalised at 1mA

HIAT'09, Venezia31 Neutron Flux – distribution over the targets Neutron flux (n cm -2 s -1 ) Neutron Flux – energy distribution (T#1)

HIAT'09, Venezia32 Fission Rates –energy distribution (T#1) Fission Rates – distribution over the targets Fission Rates – total

HIAT'09, Venezia33 C( 235 U) vs D(UC 3 * ) Neutrons vs 1GeV protons Neutron fission rate: fission | spallationNeutron flux: fission | spallation * Direct target: R=1.8cm, L=40cm

HIAT'09, Venezia34 Yields – Kr: fission | spallation Yields – Xe: fission | spallation Yields – Sn: fission | spallation Yields – Ga: fission | spallation Neutrons vs 1GeV protons

HIAT'09, Venezia35 Major Risks: breaking of target container target firing Consequences : Dissemination of radioactivity in the environment fission fragments/sec per target (~ 5 x 10 4 Ci) 1 st container 2 nd container 1 st container 2 nd container Main risks for the Fission target Luigi Tecchio – Task 4

HIAT'09, Venezia36 large small Capability of Cryotrap 3 cryotraps prototypes tested: retention capability (vs. pressure behind cryotrap) ‘carry over’: fraction of leaking gas load transported across cryotrap 2 trap types operated at different temperatures: Cryotrap works within (simulated) expectations  99.98% of volatile radioactivity can be localized! (LMU) GP N 18K SP N 30K SP N 8K GP N 28K GP N 21K Carry over p R /p M P Cryo [hPa] design goal