Combined cleaning in IR3 - MD results and simulations Adriana Rossi R.W.Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, L. Lari, S. Redaelli, G. Valentino,

Slides:



Advertisements
Similar presentations
Collimation with retracted TCSGs R. Bruce, R. Kwee, S. Redaelli.
Advertisements

Simulation priorities for 2015 R. Bruce for task 5.2.
DS Quench TEST 2  MOTIVATION and METHOD: 1. Achieve 500kW on beam 1 – TCP7 collimators.(so far 500kW with beam 2 and 235kW over 1s with beam 1 were reached.
SixTrack: Minor bug fixes and pencil beam R. Bruce.
Collimation MDs LHC Study Working Group Daniel Wollmann for the Collimation-Team, BLM-Team, Impedance-Team, … LHC Study Working Group,
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
● Morning: – Squeeze and collide. – Smooth, orbit rather well under control (max. excursion ~ 0.2 mm at TCT, roughly sigma). Orbit evolution at the.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
External Review on LHC Machine Protection, CERN, Collimation of encountered losses D. Wollmann, R.W. Assmann, F. Burkart, R. Bruce, M. Cauchi,
Off-momentum tail scraping for passive abort gap cleaning (MD 444) D. Mirarchi, R. Bruce, S. Redaelli On behalf of the LHC Collimation Team LHC Study Working.
Beam Distribution MD Sun, :00 to 14:00 F. Burkart R. Assmann, R. Bruce, M. Cauchi, D. Deboy, C. Derrez, L. Lari, J. Lendaro, A. Masi, S. Redaelli,
LHC Studies Working Group – 03 July 2012 Beam Scraping and Diffusion + Asynchronous Dump MD G. Valentino, R. W. Assmann, F. Burkart, L. Lari, S. Redaelli,
Status of FLUKA Simulations for Collimation BLM Thresholds 6 th BLM Threshold Working Group 10/02/2015 E.Skordis On behalf of the FLUKA team Sixtrack input.
Beam Background Simulations for HL-LHC at IR1 Regina Kwee-Hinzmann, R.Bruce, A.Lechner, N.V.Shetty, L.S.Esposito, F.Cerutti, G.Bregliozzi, R.Kersevan,
1 PAST ESTIMATIONS ON THE ROLE OF PASSIVE ABSORBERS Francesco Cerutti for the team 2012 June 4th.
B. Auchmann, O. Picha, Joint CWG/BLMTWG Meeting August
R. Bruce, Today’s meeting ATS optics proposed for use in 2015 (see LBOC, Evian) Several differences compared to nominal optics – Checks needed!
Updates on FLUKA simulations of TCDQ halo loads at IR6 FLUKA team & B. Goddard LHC Collimation Working Group March 5 th, 2007.
Simulations of TCT beam impacts for different scenarios R. Bruce, E. Quaranta, S. RedaelliAcknowledgement: L. Lari, C. Bracco, B. Goddard.
LHC Crystal MD 22/09/2015 – LSWG #7 R. Rossi for the LHC Collimation team and the UA9 Collaboration.
LHC Collimation Working Group – 20 February 2012 Collimator Setup Software in 2012 G. Valentino R. W. Assmann, S. Redaelli and N. Sammut.
Aperture in case of an asynchronous beam dump with ATS optics R. Bruce, E. Quaranta, S. Redaelli With valueable input from: A. Bertarelli, C. Bracco, F.
Simulation comparisons to BLM data E.Skordis On behalf of the FLUKA team Tracking for Collimation Workshop 30/10/2015 E. Skordis1.
LHC Collimation Working Group – 02 April 2012 Results from Beam-Based Collimator Alignment G. Valentino, R. W. Assmann, R. Bruce, F. Burkart, M. Cauchi,
Improving Collimator Setup Efficiency LHC Beam Operation Committee, G. Valentino, R.W. Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, S.
Work in progress: Improved models of collimation margins with TCT damage limit R. Bruce, L. Lari 1 Input and discussions: R. Assmann, A. Bertarelli, C.
LHC off-momentum collimation simulation Hector Garcia Morales Royal Holloway University of London Roderik Bruce, Danielle Mirarchi, Belen Salvachua, Kyrre.
Collimator settings for 2012 R. Bruce, R. Assmann for the collimation team
Β*-dependence on collimation R. Bruce, R.W. Assmann C. Alabau Pons, F. Burkart, M. Cauchi, D. Deboy, M. Giovannozzi, W. Herr, L. Lari, G. Muller, S. Redaelli,
NM4SixTrack Implementation of new composite materials for HL-LHC collimator upgrades in SixTrack “Tracking for SixTrack” workshop – CERN, R.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Tracking simulations – where we are and what needs to be done R. Bruce on behalf of task 5.2.
Ion Commissioning: Thursday & Friday
Tracking simulations of protons quench test
LHC collimation MDs, crystals and halo control
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Update on loss maps for input to energy deposition studies
Update on multi-turn particle debris tracking
Fast losses at collimators during 16L2 dumps
Results from crystal H on Beam 2
Β*-reach in 2017 R. Bruce, S. Redaelli, R. De Maria, M. Giovannozzi, A. Mereghetti, D. Mirarchi Acknowledgement: collimation and optics teams, BE/ABP,
Halo scraping and loss rates at collimators
Beam collimation for SPPC
Machine availability reaching well over 80%
Summary of Week 13 G. Arduini, B. Holzer
Introduction to dispersion suppressor collimation
LHC commissioning Week 38
LHC Injection and Dump Protection
The 4th International Particle Accelerator Conference, IPAC13
BLM changes HV software interlock (SIS)
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
Friday morning 10:30 Optics measurements and corrections.
Beam halo and beam losses in IR1 and IR5
Yesterday morning Held 1647 for a while – SPS kicker problem
Collimation after LS1: cleaning and β* reach
Saturday 7th May Sat – Sun night
Collimation margins and *
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
Improving Collimator Setup Efficiency
FLUKA Energy deposition simulations for quench tests
Collimation qualification during the first weeks of the 2011 run
MD Planning Fri – Sat (1. – 2.7.)
Plan for 1 m b* J. Uythoven & J. Wenninger
LHC collimation review follow-up Impedance with IR3MBC option & comparison with phase 1 tight settings N. Mounet, B. Salvant and E. Métral Acknowledgements:
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Fri :52 Stable beams fill #2536
Powering scheme for Hollow Electron Lens
Presentation transcript:

Combined cleaning in IR3 - MD results and simulations Adriana Rossi R.W.Assmann, R. Bruce, F. Burkart, M. Cauchi, D. Deboy, L. Lari, S. Redaelli, G. Valentino, D. Wollmann A. RossiCWG 18 July

IR3 combined cleaning MD Scope: Test cleaning efficiency when using IR3 for both momentum and betatron cleaning.  IR3 combined cleaning could be adopted if required for R2E.  Could reduce setup time.  Would reduce impedance. Procedure:  After beam based setup (see G. Valentino) in IR3.  Close TCP3 and TCS3 as for betatron nominal settings (if possible), i.e. 5.7 , 6.7 .  If possible keep TCTs as for physics (to test higher leakage to exp.).  Open TCP7 and TCS7.  Perform betatron and momentum loss maps in the H plane. Measurements performed:  Loss maps on horizontal plane, 3.5TeV with 1 nominal bunch, injection optics.  V collimators in IR7 left in since no vertical collimators in IR3.  Momentum loss maps could not be performed: beam dumped due to unmask-able BLM. 2 A. Rossi on behalf of the collimation team CWG 18 July 2011

IR3 combined betatron / momentum cleaning 3 What we would have (+ TCLA’s) What we could test (no vertical collimators in IR3) 10  6.7  5.7  Note that there are less passive absorber in IR3 (1 TCAP per beam) than in IR7 (3 per beam) TCHSH. 6L3.B1 TCSM. 5L3.B1 TCSM. 4R3.B1 TCSM. A5R3.B1 TCSM. B5R3.B1 TCP. A6L3.B1 TCP. 6L3.B1 TCSG. A5L3.B1 TCSG. 5L3.B1 TCSG. B4R3.B1 TCSG. 4R3.B1 TCSG. A5R3.B1 TCSG. C5R3.B1 TCSG. B5R3.B1 TCSG. D5R3.B1 Beam 1 Symmetric for Beam 2 TCSG. 5R3.B2 TCP. 6R3.B2 TCSG. 4L3.B2 Beam 2 TCSG. B5L3.B2 TCSG. A5L3.B2 TCLA. A5L3.B2 TCLA. 7L3.B2 TCLA. 6L3.B2 TCLA. B5L3.B2 A. Rossi on behalf of the collimation team CWG 18 July 2011

Results for IR3 combined cleaning, H, injection optics 4 B2 Setup apertures TCP3 (H) 5.7  TCS3 (H,S) 6.7  TCLA3 (H,V) 10  TCP7 (H,S) 18  TCS7 (H,S) 21  TCLA7 (H,S) 24  TCP7 (V) 5.7  TCS7 (V) 8.5  TCLA7 (V) 17.7  TCT (H,V) 26  TCL, TCLI, TDI open Main losses on TCP.6R3.B2 and TCSG.A5L3.B2 (skew) → Hierarchy? (TCP3 was tested to be the primary collimator prior measurements) High losses at TCTVs right of IR1 (~1%) and IR8 (~2.6%) IR7 and IR6 level A. Rossi on behalf of the collimation team ~2e-2 ~1e-2 ~1e-1 ~1e-2 CWG 18 July 2011

SixTrack simulations with collimators as thought to be 5 A. Rossi B2 TCP3 (H) 5.7  TCS3 (H,S) 6.7  TCLA3 (H,V) 10  TCP7 (H,S) 18  TCS7 (H,S) 21  TCLA7 (H,S) 24  TCP7 (V) 5.7  TCS7 (V) 8.5  TCLA7 (V) 17.7  TCT (H,V) 26  TCL, TCLI, TDI open SixTrack simulations with H sheet beam hitting TCP3: cannot reproduce IR3 loss shapes, nor high losses in IR1/8, nor IR6 and IR7 level CWG 18 July 2011

SixTrack simulations 6 TCP3 (H) 5.7  TCSG.A5L3.B2 5.7  TCS3 (H,S) 6.7  TCLA3 (H,V) 10  TCP7 (H,S) 18  TCS7 (H,S) 21  TCLA7 (H,S) 24  TCP7 (V) 5.7  TCS7 (V) 8.5  TCLA7 (V) 17.7  TCT (H,V) 26  TCL, TCLI, TDI open A. Rossi Sum of results: sheet beam hitting TCP.6R3.B2 and TCSG.A5L3.B2 ~1e-1 CWG 18 July 2011

Summary and future work Results:  After standard beam based setup in IR3.  H betatron loss maps dumped both beams.  Measured loss map pattern different from usual: Main losses on TCP.6R3.B2 and TCSG.A5L3.B2 (skew) → Hierarchy? But prior measurements TCP3 was moved in to verify it was the primary collimator. High losses at TCTVs right of IR1 (~1%) and IR8 (~2.6%). IR6 and IR7 and level.  Simulated loss map pattern could partly be reproduced by overlapping results from “hierarchy breakdown” and sheet beam hitting both collimators with highest losses. Further study to interpret/reproduce data. After analysis (simulations also with FLUKA to include showers) measurements should be repeated to validate scheme. 7 A. Rossi on behalf of the collimation team CWG 18 July 2011