Information Management Panel Update

Slides:



Advertisements
Similar presentations
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
Advertisements

Global ATM Operational Concept
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
Template created by Giorgio Camilleri, March 2006 June 2006 TRANSITION ICAO Air Navigation Bureau Radio Spectrum Seminar Cairo, Egypt.
System of Systems (DRAFT) To be approved by the ICAO Council
AIS-AIM SG - #4 Agenda item 4.1 Integration with other services - SWIM
International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation.
Mission Trajectory Step 1 From planning to deployment.
AIM Operational Concept
Nadia Konzali Project Coordinator, COSCAP-GS
ICAO: Global Harmonization Plan
Information Management The ICAO Perspective
IATA views on Information management JF Grout Assistant Director ICAO relations.
ICAO IMP Paul Bosman AIS-AIM/SG11 - AOB. ICAO Information Panel  Air Navigation Conference 2012 conclusion  Participants  Australia, Brazil, Canada,
Delivering Digital Services WP6 – SESAR SWIM State of Play ICAO IMP-# January 2015 Presented By: Paul BOSMAN Head SWIM/Architecture.
International Civil Aviation Organization AIM - implementation Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi,
International Coordinating Council of Aerospace Industries Associations International Coordinating Council of Aerospace Industries Associations (ICCAIA)
European AIS Database (EAD)
FAA International Activities
ICAO Flight Plan 2012 Workshop ARE YOU READY? Durban 24 August 2012.
09/12/2009 SWIM-SUIT User Forum, Rome SWIM-SUIT Project Overview Giuliano d’Auria SELEX Sistemi Integrati Project Coordinator.
24-25 June 2010 SWIM-SUIT Final User Forum, Rome SWIM-SUIT Final User Forum.
Aeronautical Information Exchange Model (AIXM). Introduction “Never let an aircraft take you somewhere your brain didn't get to five minutes earlier”
Integrating information towards Digital ATM FAA/SESAR Coordination on Data Modelling Presented By: Paul Jackson Date:August 27, 2013.
International Civil Aviation Organization Global Air Navigation Plan (GANP) – Framework for global planning H. Sudarshan SIP/2012/ASBU/Nairobi -WP/7 Workshop.
ASBUs Block 1 Overview The CANSO Viewpoint Eugene Hoeven Director ICAO Affairs ICAO Liaison Office Pre-AN-Conf/12 Workshop Montreal, November 2012.
1 Vince Galotti Chief/ATMICAO 26 March 2007 A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I FITTING THE PIECES TOGETHER.
1 The model of integrated use of information for provision of aircraft flights Completed by: Kolosok A. Supervisor: Luppo O.E. Модель інтегративного використання.
Victor Kourenkov ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 LEGISLATION AND ORGANISATION CONSIDERATIONS.
Safety Information Sharing ICAO’s Perspective John Illson Air Navigation Bureau Flight Safety Foundation – International Air Safety Summit 31 October 2013.
The global voice of ATM The Global Voice of ATM CANSO AIM WG Activities Agenda Item - 5: Global strategy/roadmap ICAO AIS-AIM SG3, Montreal, November.
The European Organisation for the Safety of Air Navigation AISAIM-SG-#7, 14 January 2013 AIM relevant - ANC conclusions Paul Bosman Manager SWIM/EA Unit,
Next Generation Air Transportation System Presentation to the Commercial Space Transportation Advisory Committee (COMSTAC) May 26, 2005 Robert A. Pearce.
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
GDPFS related activities and projects of CAeM Mr Ian Lisk, vice-president CAeM.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
Block #1c: Performance Overview Economic and Management Performance
PBCS Workshop May 2013, Bangkok
AIS-AIMSG/12 Briefing to ANC 23 October 2015
CANSO AIM WG Activities
Globally Interoperable Systems and Data
FIXM briefing for the AIXM CCB Hubert LEPORI EUROCONTROL, ATM/STR/SWM
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Statements from CAeM Submitted by: Commission for Aeronautical Meteorology (CAeM) (Doc 3c) Inter-Commission Task Team on the WMO information system (ICTT-WIS)
AIS-AIM SG - #4 Agenda item 4.1 Integration with other services - SWIM
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
System Wide Information Management
Paul Bosman AIS-AIM/SG11 - AOB
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Communication (Reviewed by CRV TF/2)
AIM Operational Concept
SIP/2012/ASBU/Nairobi-WP/7
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
4 - 8 November 2013 AIM relevant - Assembly conclusions
Global ATM Operational Concept
TOGETHER WE CAN MAKE A DIFFERENCE
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
Establishment of Space Weather Information Service
ANConf/12 – Agenda H. Sudarshan
ANConf/12 – Agenda H. Sudarshan
Global Air Navigation Plan (GANP) Aviation System Block Upgrade (ASBU)
ICAO Air Navigation Bureau
Templ ref: PPT-ISO-colour.001 Doc Ref no:
AIM Global Strategy Air Navigation Procedures for AIM Seminar
AISAIM-SG-#7, 14 January 2013 AIM relevant - ANC conclusions
NOTAM Review and Challenges
ICAO Forum on Integration and Harmonization of NextGen and SESAR into the Global ATM Framework 8-10 September 2008 Lex Hendriks Deputy Director DAS, EUROCONTROL.
Presentation transcript:

Information Management Panel Update Michael Hohm Technical Officer, Aeronautical Information Management Air Navigation Bureau, ICAO Air Transportation Information Exchange Conference (ATIEC), Maryland, USA 26 -28 August 2014

Background NexGen /SESAR gap analysis Twelfth Air Navigation Conference [Agenda 3] recommendation to “update the information management /system wide information management (IM/SWIM) working arrangements Key enabler 27 August 2014

ANC/12 Recommendations Specifically: Develop specifications pertaining to Technical performance Security requirements Bandwidth requirements ... For a global framework supporting a global system-wide information management for ATM operations. Review the NOTAM system & develop options for its replacement 27 August 2014

Formation Air Navigation Commission agreed to the Establishment (8th meeting 194th session) Development of ToRs Individual State letter (June 2014) Invited 18 selected States and Organizations to nominate a member Nominees informed of acceptance and 2nd (circular) State letter Additional Nominees 27 August 2014

GANP / ASBUs Block 0 Block 1 Block 2 Block 3 ACDM B1-ACDM DAIM B1-DAIM   Block 0 Block 1 Block 2 Block 3 ACDM B1-ACDM DAIM B1-DAIM AMET B1-AMET DATM B0-DATM B1-DATM SWIM B1-SWIM B2-SWIM FICE B1-FICE B2-FICE B3-FICE FRTO B3-FRTO NOPS B2-NOPS TBO B3-TBO WAKE B1-WAKE RESQ B1-RESQ 27 August 2014

Terms of Reference - Scope Investigate and develop solutions supporting the planning framework on information management contained in theglobal air navigation plan (GANP) Development of system-wide information management (SWIM) Develop a global interoperability framework for international air navigation Exchange formats Service models Governance functions 27 August 2014

Terms of Reference - Objectives Define the Global Interoperability Framework describing the functions, architectures and system design requirements Define and elaborate on the ATM information management concepts, functions and processes required business model to provide accredited, quality-assured and timely information system-wide basis, including avionics. 27 August 2014

Terms of Reference - Objectives Develop an ATM information service architecture. Identify the requirements for SARPs and changes to existing SARPs GANP and ASBUs Develop transition strategies and guidance future avionic requirements Identify and plan for anticipated data and information flows in relation to future ATM requirements and capabilities 27 August 2014

Work Program Areas IM Concept, Service Architecture, and Roadmap ATM information Service architecture Roadmap update Operational Messaging (NOTAM review) Information Exchange Collection and use of information Exchange models AIRM Service Requirements Security requirements Access, integrity, and quality Bandwidth requirements Institutional Issues and Governance 27 August 2014

The right information to the right user at the right time… ATM Actor /User Airports ANSPs Facilities MET Regulators Geospatial Pilots Flight operations ATCOs ATM ops Airport operations Airframe Manufacturers System Manufacturers Data integrators 27 August 2014

Challenges Harmonization Services and Facilities Transition Capabilities Aircraft update generations 27 August 2014