Dr. Mark Price: Spring 2011.  We will go through the procedure of a real example of the mission proposal and selection process.  In 1 or 2 lectures.

Slides:



Advertisements
Similar presentations
Plato at ASI Tues 05/May/09Dave Walton Plato meeting Rome Tues 5/May/09 Focal Plane Dave Walton UCL/MSSL, + Leicester University Miguel Mas INTA/CAB +
Advertisements

Chapter 2 Analyzing the Business Case.
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
Solar Orbiter Payload Working Group Mid-term meeting November 2002, ESTEC 1. PDD Activities - Status of PDD inputs - Discussion of each instrument.
1 GAIA System Level Technical Reassessment Study Final Presentation ESTEC, April 23rd 2002 Part 1b Development & AIV.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Questions from the European colleagues & Answers (only) from the Chinese engineers present for Y.-W. Zhang and S.-G. Yuan Chinese Academy of Space Technology.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
1 Briefing to the CAA on the Terrestrial Planet Finder (TPF): Finding and Characterizing Earth-like Planets Zlatan Tsvetanov, NASA Program Scientist Charles.
Fundamentals of Information Systems, Second Edition
PLATO kick-off meeting 09-Nov-2010 PLATO Payload overall architecture.
Constellation Orion Visible Light Constellation Orion Infrared Light.
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
PLAnetary Transits and Oscillations of stars Thierry Appourchaux for the PLATO Consortium
Detection of Terrestrial Extra-Solar Planets via Gravitational Microlensing David Bennett University of Notre Dame.
SDW2005, juin, Taormina The Corot Space instrument.
Technical Performance Measures Module Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture was developed.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
The James Webb Space Telescope. Introduction The James Webb Space Telescope  The James Webb Space Telescope, also called Webb or JWST, is a large, space-based.
SPACECRAFT ACCIDENTS: EXAMINING THE PAST, IMPROVING THE FUTURE Hubble Recovery with STS Bryan Palaszewski working with the Digital Learning Network NASA.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
“ PHOBOS - SOIL ” Phobos Sample Return Mission 1. goals, methods of study A.Zakharov, Russian academy of sciences Russian aviation.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
Introduction Low mass, high speed impacting projectiles, performing science investigations from below surface. Objectives: ground truth, unique science.
Final Version Wes Ousley Dan Nguyen May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Thermal.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
Cubesats A spacecraft concept to provide advances in international cooperation From: Doug Rowland, NASA GSFC Alexi Glover, ESA.
September 20th TJ Faculty Presentation 2006
Harvey Tananbaum Director Chandra X-ray Center Harvard-Smithsonian Center for Astrophysics 13th HEAD Meeting April 8, 2013 Building International Space.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Optical principles of diffraction focussing, Preparing the way to space borne Fresnel imagers NiceSeptember 23-25, Laurent Koechlin Laboratoire.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
A Search for Earth-size Planets Borucki – Page 1 Roger Hunter (Ames Research Center) & Kepler Team March 26, 2010.
6/11/2012 Building on NEAT concept - M. Gai - INAF-OATo 1 Building on NEAT concept M. Gai – INAF-OATo (a) Extension of science case (b) Payload implementation.
Jenam 2010 Exoplanet Targets for Upcoming Cosmic Visions Space Missions James Frith September 8 th 2010 University of Hertfordshire.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.

THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
MAXIM Periscope ISAL Study Highlights ISAL Study beginning 14 April 2003.
Exoplanet Science Don Pollacco QUB. Overview PLATO’s objectives and space Work packages in the definition phase Timescales and aims of the definition.
Réunion de présentation des besoins 10 Nov Joël MICHAUD French expertise in SiC for large telescopes.
Astrophysics Missions in ESA’s Cosmic Vision Program
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
SuperNova / Acceleration Probe System Engineering Mike Roberto and Mike Amato November 16, 2001.
LISA News from ESA O. Jennrich LISA Project Scientist.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
Cosmic Vision Process Cosmic Vision 2015 –2025 process launched on 2 April 04 with call for Science themes June 04: deadline for proposal submission.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
KEPLER TABLE OF CONTENTS Table of Contents: Mission Overview Scientific Objectives Timeline Spacecraft Target Field of View Transit Method Johannes Kepler.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
The Search for Another Earth Exoplanets and the Kepler Spacecraft.
”Gamma-Ray Imager” - a mission idea for the next ESA call Niels Lund - for the GRI consortium.
EXTP Accomodation Study Hong Bin, Zhang Long Institute of Spacecraft System Engineering. CAST Oct 27th, 2015.
V - 1 V. System Technology for Large Space Telescopes Session Chair: Juan A. Roman.
Rationale for Selected MIL-STD-1540E Thermal Test Requirement
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Il programma NHXM sviluppato dall'ASI Ing. Mauro Piermaria New Hard X-Ray Mission Workshop Nazionale 12 e 13 novembre 2009 – ASDC, Frascati.
1 Balancing Science and Engineering D Lumb. 2 Science Instrument Funding Generally the spacecraft and common systems are provided by ESA, the instrumentation.
The Kepler Mission S. R. Kulkarni.
Rose Navarro HMI Lead Thermal Engineer
Planetary Lander PDR Team Name
Point Source Transmission Simulations on the COROT baffle
© The Aerospace Corporation 2008 Rationale for Selected MIL-STD-1540E Thermal Test Requirement John W. Welch The Aerospace Corporation TFAWS
Launch and On-orbit Checkout
EagleSat 2 – Mission and Development Overview
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

Dr. Mark Price: Spring 2011

 We will go through the procedure of a real example of the mission proposal and selection process.  In 1 or 2 lectures I can barely scratch the surface! Even the smallest science mission costs >£100M and there is quite literally THOUSANDS of pages of documentation for even a modest mission.  However, hopefully, it will give you a flavour for the process.

 Call for proposals: ◦ ESA regularly makes a ‘call for proposals’ – approximately once every 5 years. (NASA has a ‘decadal’ study). ◦ This is a chance for the scientific community to get together a proposal for a scientific space mission ◦ Each proposing team is normally made up of 20 – 200 scientists from the relevant field ◦ This call lasts approximately 3-4 months ◦ Warning: ESA and NASA love acronyms! The documentation is littered with them!

Activity Date: ‘Cosmic Visions’ call 2007  5 March 2007: ◦ Release of 1st Call for mission proposals of Cosmic Vision  30 March 2007: ◦ Deadline for Letters of Intent  11 April 2007: ◦ Briefing to proposers at ESTEC  29 June 2007: ◦ Mission Proposals due  July - September 2007: ◦ Proposal evaluation process by ESA and Peer Review Teams  October 2007: ◦ Working group/SSAC evaluation and selection of: ◦ 3 Class M mission proposals (cost ceiling €470M) ◦ 3 Class L concept proposals (cost ceiling €900M)

ESA headquarters science council meeting

 ESA science programme has three distinct domains ◦ Astrophysics (Astrophysics Working Group: AWG) ◦ Solar System (Solar System Working Group: SSWG) ◦ Fundamental physics (Fundamental Physics Advisory Group: FPAG)  Each group (depending on the mission proposal) passes its recommendation up to the Space Science Advisory Committee (SSAC).  The SSAC then passes its recommendation up to the Science Programme Committee (SPC) which has delegates from each of ESA’s member nations. They have final say.

ESA mission selection ‘flow’ chart

 52 proposals received from the community  Of those 6 for each ‘M’ and ‘L’ class proposal are selected  Principal Investigators (‘PI’s) from each proposal are invited to ESA headquarters in Paris to give a talk to the selection board based on their ‘yellow book’ proposal.  These 6 are then whittled down to a just 3 to go through to the next evaluation phase.

Timeline prior to any spacecraft construction

Various phases of a mission prior to launch

 ESA received 52 proposals but whittled it down to 6 candidates  Class M candidates (2 will be successful) ◦ EUCLID ◦ PLATO (we will discuss in detail) ◦ Solar Orbiter  Class L candidates (1 will be successful) ◦ EJSM-Laplace (we will discuss in some detail, if there is time). ◦ LISA ◦ IXO

 Each proposer submits a ‘yellow book’ which is a document describing in detail the science and the feasibility of the mission.  These documents are hundreds of pages long!  The ‘yellow book’ must explain to the selection panel ◦ Why your science is top priority ◦ How can you do your science (does the technology exist?) ◦ What are the risks?

Plato – main science goals: 1) The detection of extra-solar planetary systems of all kinds, including small, terrestrial planets in the habitable zone of solar-type stars. 2) A precise characterization of the basic physical parameters of the detected exoplanets and the host stars: radius, mass, age. 3) The identification of suitable targets for future, more detailed characterization.

(Effectively Plato is a super-sensitive photometer!)

 Plato is a super-sensitive photometer (measures the amount of light from a star very accurately)  The proposal is to build on Kepler/GAIA results and detect thousands of Earth-sized exoplanets in a (near) all-sky survey.  Three different spacecraft optical configurations (telescope design and CCDs) proposed from three different contractors: ◦ Astrium (‘Concept A’) ◦ Thales (‘Concept B’) ◦ PPLC (‘Concept C’) [PPLC = Plato Payload Consortium]

Uses 12 reflecting telescopes to achieve a field-of-view of 1800 deg 2 Optical structure is silicon carbide to reduce thermal expansion/contraction Mirrors are aspheric and require special manufacture Has a sunshield deployed in space Requires 176 CCDs with a resolution of 2080x2574

54 refracting telescopes mounted on optical baseplate Telescope primary lenses made of BaF 2 to cover wavelength range 450 – 1000nm Total field-of-view ~ 625 deg 2 Each telescope to have 3000x6000 pixel CCD Telescope based on known design

42 refractive telescopes Each with its own sunshade Total field-of-view = 1800 deg 2 Each telescope has 6 BaF 2 lenses Requires 168 CCDs with a resolution of 3584x3584

GANTT chart for Plato operations to launch

Spacecraft to be placed at ‘L2’ point to minimise radiation from the Sun (thermal and ionising). Ideal location for astronomy missions

 How does Plato’s ‘Yellow Book’ address the environments we have discussed in this module? Thermal control: ◦ Telescope is passively cooled. The spacecraft structure is kept at ~150K using a sunshield and passive radiative cooling ◦ The CCDs and optics are coupled to the spacecraft structure through a silicon carbide baseplate to cool them ~170K ◦ The electronics will operate at 320K and are thermally isolated from the focal plane array ◦ Spacecraft is at L2 point, and thus radiation from the Sun is minimised

Radiation environment “The radiation levels for PLATO are calculated to be 10 times higher than for GAIA. A proper radiation analysis is needed in a possible future phase in order to better characterise and estimate the radiation effects. A possible mitigation action against radiation damage would be to add a protective silica plate on top of each focal plane. Assuming 10mm thickness for this plate, the mass impact is an additional 30kg.”  (Basically: we don’t really know yet).

Mass budget: optical array – concept A Telescope mass budget for each telescope and Telescope Assembly (TA). Telescope TA (3 telescopes) PLM (4 TA) M1 9.8kg 29.4kg 117.6kg M2 6.4kg 19.2kg 76.8kg Protective silica plate 2.5kg 7.5kg 30.0kg Total kg

Mass budget: optical support – concept A Item Mass [kg] incl. margin M1 supporting plate M2 supporting plate 62.7 Struts 39.2 Interfaces fixation devices 10.5 Secondary structures and baffles 2.1 Fixation H/W (screws, etc.) 6.3 Interface base plate Isostatic I/F with SVM 20.0 Total 416.7

Engineering drawings of payload (concept ‘A’) and how it mounts inside the proposed Soyuz launch vehicle.

Plato Mass budget

 Plato power budget for all three concepts

 ‘Technology Readiness Level ’ (TRL) – i.e. can we build what we say we can build. ◦ “For design concept A, the Deployable Sunshield is identified as a critical area in which the TRL needs to be raised before a possible implementation phase. In particular, the HDRM that will need to provide structural stability during launch needs to be developed...” (HDRM=Hold Down and Release Mechanism) ◦ This basically says that the technology needed to unfold the sunshield for concept A isn’t mature enough.

◦ “Common for all concepts is the need for an early CCD design activity so that there is sufficient time to produce all the CCDs needed. The specifications of the CCDs are not more complex compared to other programs such as GAIA, but the designs require many CCDs due to the large FoV. So the critical issue is rather in having enough time to produce and test all CCDs instead of new, complex CCD designs. This is why a development activity in phase A/B1 is needed to ensure that production of the FM CCDs can start as soon as possible.”  Plato requires a LOT of space qualified CCDs so need to start producing them ASAP.

 Data download ◦ Only (up-to) 48 hours of data will be stored on- board. ◦ Data will be downloaded once-per-day for a period of 3.5 hours in a 24 hour cycle ◦ Data transmit rate will be 8.7 Mbps ◦ Data will be transmitted in the X-band (10 MHz) using standard GMSK modulation

The mission operations can be broken down into the following tasks:  Mission Planning: long term, medium and short term planning (24 hours to one week time frame, it is assumed that only very limited short term planning activities are required for PLATO.)  Spacecraft control, following the Flight Operations Plan and the short-term plan  Spacecraft status monitoring and off line performance analysis.  Instrument control, implementation of the observation schedules  Collection of the instrument HKTM telemetry and instrument status monitoring.  Orbit determination and control using tracking data and implementing orbit manoeuvres.  Off line attitude determination and control based on the processed attitude sensors data in the spacecraft telemetry and by commanded updates of control parameters in the on-board attitude control system.  On-board S/W maintenance (OBCP programming and maintenance, and application and payload software update management).  Data distribution and data archiving (science data are archived at ESAC)

 ESA has an internal review to determine the feasibility (scientific and engineering) and risk associated with each mission.  Referred to as an ‘Internal Review Report’ (shortened to ‘IRR’).  This document outlines the risks to the Science Programme Committee (SPC) and makes recommendations.  These recommendations effectively ‘make’ or ‘break’ a mission proposal.

IRR risk summary for Plato: 4 areas are identified

“Given the high number of CCDs to be produced in all studies, a key element which will impact the spacecraft development is their manufacturing time. In order to evaluate the proposed schedules for the development and production of the potential PLATO CCDs, the GAIA CCDs development, manufacturing and test rate was used as a benchmark. In Figure 2-1 the time line of the GAIA CCD program is shown. Based on that, a reasonable production rate is about 3 CCDs per month.”

 “When the Gaia bench mark is applied to the two industrial studies and the PPLC the following schedule can be deduced for the Phase B2/C/D:”  Astrium (concept A): ◦ 214 CCDs (BB + EM + FM + FS) - 6 years  Thales (concept B): ◦ 128 CCDs (EM + FM) years  PPLC (concept C): ◦ 168 CCDs (FM) years  (This is just the length of time needed to produce enough space-qualified CCDs for the mission!)

 The IRR flags concerns about the optical configuration for all three concepts: ◦ The mirrors for concept A are aspherical, non-standard and made of SiC. ◦ The estimated time to manufacture one M1 mirror is ~27 months. Therefore total manufacture time is >6 years (estimate). ◦ The refractive designs are simpler, and use known technologies but BaF 2 lenses are expensive and the crystal has to be custom grown. ◦ Estimated time to grow a large BaF 2 crystal ~2-3 months. ◦ Lenses are hygroscopic and thus need environmental control ◦ lenses are needed for either concept B or C. Lens manufacture time is unknown.

IRR optical design assessment and recommendations

The IRR summarises the risk of the technology for Plato as follows

The following summarises the main conclusions of the review team:  The mission requirements are reasonably well defined to start the Phase B1.  The spacecraft design does not show peculiar complexities beyond the state of the art achieved with Gaia and/or Corot. The mission is reasonably straightforward.  The mass is underestimated. Compatibility with the Soyuz launcher requires downsize of the S/C by, at least, 5 %.  The only identified critical technology is the manufacturing of the primary mirror M1 in the reflective system due to the very peculiar shape of the surface.  The schedule is strongly underestimated. Main driver is the high number of CCDs to be manufactured (other elements are the high number of optical elements and the not fully thought verification at payload system level).  Assuming start of the phase B2/C/D middle of 2012, a “realistic” launch date will be This assumes that the phase B1 is used to freeze the CCD design and prototyping; otherwise a further year shall be added.

Main recommendation to SPC “The current design is not compatible with a 2017/2018 launch. To achieve end 2018 a major reduction (order of > 30%) of the payload module (number of CCDs and optics) is required. This would result in a positive mass margin, which can be used for increasing the pupil diameter and recovering at least part of the science performance. Considering mission extension in orbit could also help recovering performance. Using the ESA- developed instrument performance model for PLATO, preliminary results obtained by the study team at the end of the review indicate that the proposed way forward is viable with moderate impact on science performance if any”  Effectively says that for a 2018 launch, the mission has to be ‘descoped’ by 30%! But, due to the nature of the mission (no cryogenics, exoplanets aren’t going anywhere etc) science could be recovered by extending the baseline mission from 6 years.

 The procedure to select a space mission is complicated!  Lots of documentation has to be produced and meetings held before a single nut is purchased.  Missions can be ‘descoped’ (‘Exomars’ for example) to cut costs and to meet launch windows.  Past a certain point in the process, the external science community has very little say in the final mission profile.  The time from ‘call’ to ‘launch’ is normally 10+ years!