Geological Sequestration of C Carbon Sequestration in Sedimentary Basins Module 4: Sleipner Project Maurice Dusseault Department of Earth Sciences University.

Slides:



Advertisements
Similar presentations
Going Beyond Exploration
Advertisements

Joe Chaisson April 21, Integrated Coal Gasification Combined Cycle (IGCC) Power Plants and Geologic Carbon Sequestration Joe Chaisson.
FOR FURTHER INFORMATION Figure 1: High-level workflow for the assessment of potential interaction of CO 2 geological storage with other basin resources,
Carbon Dioxide Emission: 24 billion tons per year.
Introduction to Geologic Sequestration of CO 2 Susan D. Hovorka Gulf Coast Carbon Center, Bureau of Economic Geology Jackson School of Geosciences, The.
CCS CARBON CAPTURE and SEQUESTRATION PREVENTING CARBON DIOXIDE FROM CONTRIBUTING TO GLOBAL CLIMATE CHANGE CA CCS Coalition FOR MORE INFORMATION:
Carbon Capture and Sequestration Update APPA Energy & Clean Air Task Force April 26, 2010.
Date faculty of lawgroningen centre of energy law CCS: Regulating Subsoil Storage of CO2 Prof. dr. martha M. Roggenkamp
CO 2 Sequestration Catherine Peters Princeton University Deep Carbon Cycle Workshop May 15-17, 2008 Carnegie Institution Geophysical Laboratory.
Earth Sciences Division, Lawrence Berkeley National Laboratory
CO 2 Capture and Storage (CCS). Contents The Need for CO 2 Capture and Storage 4 Reliance on Fossil Fuels 5 Largest CO 2 Emitters 7 Addressing the Challenge.
TTI CO2 Sequestration in Geologic Formations Terralog Technologies USA, Inc. BP Hydrogen Energy CO2 Project.
Carbon Capture and Storage Climate Change and Sustainable Development: New Delhi, April 7-8, 2006 Pernille Holtedahl, PhD, Norad NORWAY.
Technical options for placement of CO 2 in the maritime area  by Paul Freund
“RESERVOIR ENGINEERING”
B9 Coal Deploying Fuel Cells to Generate Cheap, Clean Electricity from Fossil Fuels.
Olje- og energidepartementet Carbon Capture and Storage in Norway Mr. Erik Just Olsen Adviser, Ministry of Petroleum and Energy.
© NERC All rights reserved CCS main geological issues Storage capacity Injectivity Containment.
CO 2 Sequestration Options for California Larry Myer WESTCARB Technical Director California Energy Commission (916) ; ETAAC.
Systematic approach to source-sink matching for geological carbon capture and sequestration Marlo Gawey GIS for Water Resources November 22, 2011 World.
Geological Sequestration of C Carbon Sequestration Module IX: CO 2 Sequestration and Oil Recovery, Permian Basin, USA Maurice Dusseault Department of Earth.
Capturing Carbon dioxide Capturing and removing CO 2 from mobile sources is difficult. But CO 2 capture might be feasible for large stationary power plants.
1 Carbon Capture and Storage Martin Blunt Department of Earth Science and Engineering Imperial College London.
10 years of SLEIPNER CO2 Storage
Classification: Internal Status: Draft Building the CO 2 Value Chain – Is it Possible? Olav Kårstad Special Advisor CO 2 British – Norwegian Workshop on.
CO2 Enhanced Oil Recovery and Storage in Reservoirs
Carbon Capture and Storage What is it and how can it help us?
Carbon capture and geological sequestration:. Some numbers 40 % carbon emissions from power plants 90 % emission reduction proven operationally Eg. Geological.
National Geophysical Research Institute, Hyderabad.
1 Dr (Prof) A D Surridge Head: South African Centre for Carbon Capture and Storage Senior Manager: South African National Energy Research Institute
Carbon Capture & Storage(CCS)
1 CO 2 from capture to storage Gérard FRIES Executive Vice-President Institut Français du Pétrole.
Statoil’s R&D on CO 2 Capture and Storage European Forum Gas in Paris on September years of CO 2 Storage Tore A Torp, Statoil Research Centre,
Geological Sequestration of C Carbon Sequestration in Sedimentary Basins Module VII: Weyburn, Sask. Maurice Dusseault Department of Earth Sciences University.
WOC 1 view on the focus and scope regarding CO 2 sequestration in WOC 1 (upstream sector) study area. (according to the experience of CO 2 problem study.
Transporting CO 2 John Davison IEA Greenhouse Gas R&D Programme Workshop on CCS, KEPRI, 19 th October 2007.
Technology options under consideration for reducing GHG emissions SUSTAINABLE ENERGY ROUNDTABLE SERIES: Next Steps Post-Kyoto: U.S. Options January 13,
Greenhouse Gas Mitigation & CO 2 Storage Prof. Jenn-Tai Liang Chemical & Petroleum Engineering Department The University of Kansas.
EPA's Regulatory Approach : Climate Mitigation via Sequestration of CO2: by Rob Ferri (EPA - Underground Injection Control) This presentation has not been.
Permanent CO 2 storage in depleted gas fields combined with CO 2 enhanced gas recovery (EGR) Idar Akervoll, SINTEF Petroleum, Trondheim Contribution to.
Carbon Capture and Storage - can it make coal clean? Dr. Shannon Page Department of Environmental Management Lincoln University.
1 Carbon Capture and Storage Martin Blunt Department of Earth Science and Engineering Imperial College London.
Olje- og energidepartementet Present Norwegian activities Focus on CCS both as global climate mitigation measure and for EOR-purposes. Valuable.
Carbon Dioxide Capture and Geological Storage: Contributing to Climate Change Solutions Luke Warren, IPIECA.
INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE (IPCC) The IPCC on Carbon dioxide Capture and Storage Heleen de Coninck (IPCC WG III on Mitigation) DEFRA/IRADe.
R K Jain. CO 2 emission responsible for global warming Development process to go unhalted. Ways and means to be found for controlling and abating CO 2.
ARKANSAS ENVIRONMENTAL FEDERATION GHG EMMISSIONS TRADING CONFERENCE LITTLE ROCK, ARKANSAS MARCH 2006 Interstate Oil and Gas Compact Commission.
INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE (IPCC) The IPCC Special Report on Carbon dioxide Capture and Storage Your name Your institute Date, place.
CO 2 Capture and Geological Storage Demonstration at In Salah, Algeria Iain Wright (CO2 Project Manager, BP Group Technology) UNCTAD Africa Oil & Gas Conference.
Delhi CCS R&D prorities CO 2 geological storage: Road Map, EOR, aquifers, mineral Stuart Haszeldine School of GeoSciences.
Carbon Capture and Storage Climate Change and Sustainable Development: New Delhi, April 7-8, 2006 Pernille Holtedahl, PhD, Norad NORWAY.
CO 2 Storage Challenges to the Iron and Steel Industry John Gale General Manager IEA Greenhouse Gas R&D Programme Steel Institute VDEh Auditorium D ü sseldorf,
Ran Qi, Valcir T Beraldo, Tara C LaForce, Martin J Blunt Design of CO 2 storage in aquifers 17 th Jan Imperial College Consortium on Pore-Scale Modelling.
Norwegian Carbon Capture and Storage Projects Helge Lund, President & CEO Capital Markets Update 8 June 2005 Tor Fjæran, Senior Vice President Corporate.
Can Carbon Capture and Storage Clean up Fossil Fuels Geoffrey Thyne Enhanced Oil Recovery Institute University of Wyoming.
LM-01L Carbon Capture and Geologic Storage Larry R. Myer Earth Sciences Division Lawrence Berkeley National Laboratory Physics of Sustainable Energy March.
2002 European Commission - Directorate-General for Research CO2 Strategy.ppt 1 An EU Research Strategy for the Mitigation of CO 2 Emissions An EU Research.
Energy and the Environment: Tapping the Potential for Large Volume Storage of Carbon in the Gulf Coast Susan Hovorka Bureau of Economic Geology Jackson.
11 Klima og markedsføring Gine Wang, informasjonsdirektør StatoilHydro Forbrukerombudet/ Barne- og likestillingsdepartementets møte 24. februar 2009.
M idcontinent I nteractive D igital C arbon A tlas and R elational Data B ase James A. Drahovzal, Lawrence H. Wickstrom, Timothy R.Carr, John A. Rupp,
Recent progress and big ideas on geologic sequestration US/international perspective Susan D. Hovorka Gulf Coast Carbon Center Jackson School of Geosciences.
Recent progress and big ideas on CCS US/international perspective.
Geological Sequestration of C Carbon Sequestration in Sedimentary Basins Module VII: Weyburn, Sask. Maurice Dusseault Department of Earth Sciences University.
Carbon Capture and Storage Potentials and Barriers to Deployment.
Geologic Sequestration: the Big Picture Estimation of Storage Capacity or How Big is Big Enough Susan Hovorka, Srivatsan Lakshminarasimhan, JP Nicot Gulf.
Status on Norwegian CCS activites Dr. Per Christer Lund, Counsellor Science and Technology, Innovation Norway.
Environmental Impact Assessment Speaker : Yong Hoon Kim, Ph.D.
The CarbonNet Project POSTER B MMV Certification
Seismic monitoring of a unique CO2 injection site at Sleipner
Challenges in Global CCS Projects
Presentation transcript:

Geological Sequestration of C Carbon Sequestration in Sedimentary Basins Module 4: Sleipner Project Maurice Dusseault Department of Earth Sciences University of Waterloo Most of these slides are from a presentation by: Tore A Torp, Dr.ing., Adviser CO 2 Storage, StatoilHydro ASA, Norway

Geological Sequestration of C 2 Time Magazine, 17. May 2004 Sleipner CO 2 injection: - Decided in In operation since million tonne CO 2 /year Tore A Torp

Geological Sequestration of C North Sea, Sleipner  About 2,800 tonnes of carbon dioxide are separated daily from Sleipner West's gas production and injected into the Utsira sandstone formation (aquifer), rather than released to the air.  Why? Purely economics from the gov’t…  But… Good Politics as well (Norway, EU, StatoilHydro, joint funding…)

Geological Sequestration of C Sleipner  9.5% CO 2 in the produced gas  They would …  Be penalized a bit by having less pure gas  Have to pipeline it at extra cost  So…  It is better to separate on platform  And re-inject the CO 2 into a shallow stratum, the Utsira Sandstone

Geological Sequestration of C Experience with CO 2 & Injection  Enhanced Oil Recovery (Texas, Hungary, Turkey, Brazil, Croatia)  Natural gas cleaning  Transport – Pipelines & Ships  Natural gas re-injection  Natural gas underground storage  But, SLEIPNER is the first project to massively inject CO 2 without EOR application - Sequestration

Geological Sequestration of C 6 CO 2 -tankers, 1500 m 3 capacity Tore A Torp

Geological Sequestration of C 7 Sleipner Facility 2004 Tore A Torp

Geological Sequestration of C Sleipner Facility

Geological Sequestration of C Injection into the Utsira Fmn. CO2 Injection Well in "Utsira" 9 Sleipner A Sleipner T Utsira Formation Heimdal Formation Sleipner Øst Production and Injection Wells CO 2 2 InjectionWell 1000m 2000m 2500m 0 500m 1500m 1000 m m 1500 m Tore A Torp

Geological Sequestration of C The Utsira Formation 10 Tore A Torp

Geological Sequestration of C The Utsira Formation  High porosity sandstone  ~30% porosity  Permeabilities > 1 D (up to +10 D)  H 2 O saturated, no gas or oil…  200 m thick, with a modest central shale zone that appears continuous  Large volumes available  Regionally continuous  million m 3 capacity per km 2  Excellent lateral transmissivity!

Geological Sequestration of C 12 Statoil BP ExxonMobil Total Norsk Hydro Vattenfall BGS BRGM GEUS IFP NITG-TNO SINTEF IEA Greenhouse Gas R&D Programme Schlumberger Research NO, DK, NL, FR & UK Authorities SALINE AQUIFER CO 2 STORAGE PROJECT

Geological Sequestration of C CO 2 Zone Growth

Geological Sequestration of C 14 Time-lapse seismic datasets of CO2 stored in Utsira formation Tore A Torp

Geological Sequestration of C 15 1 km Plume outline June 2006 Plume outline Oct 2001  8,4 million tonnes injected over 10 years  Plume area: 2,8 km 2 (1,3 km 2 in 2001)  Plume long axis: 3760 m  Maximum distance from injection point: 2560m  Maximum speed of front since 2004: 250 m/year,  Distance from CO 2 to wells:  Exploration well 15/9-13: 430m, decreasing about 12 m/year  D-template: about 2 km straight west of northern plume  15/9-19 wells: about 4,5 km north of plume 3,76 km Plume extension & top Utsira time map saddle Amplitude maps of the uppermost horizon, in 2001 (left), 2004 (middle) and 2006 (right). Hot colours represent higher amplitudes and thicker CO 2 accumulation. 15/ m Injection point Seismic section CO 2 distribution June 2006 Tore A Torp

Geological Sequestration of C 16 Simulated picture of the distribution of CO 2 after three years. Radius of largest bubble 800 m and the total plume 200 m high. Ref: SINTEF Petroleum 2001 Tore A Torp

Geological Sequestration of C 17 Dissolution of CO2 in the Utsira Brine Year 2021 Year 2412 Year 2621Year 5019Year 7018 Source: Gemini No. 1, 2004 (NTNU and Sintef) Tore A Torp

Geological Sequestration of C SACS Project WHAT WAS ACHIEVED: 3D Seismic proven, Gravimetry tested Reservoir simulation tools partly proven Geology and Geochemistry of “Utsira” mapped Reason to expect the CO 2 to stay for thousands of years DOCUMENTATION “SACS Best Practice Manual, 1.version.” Download from see page “SACS”. Tore A Torp

Geological Sequestration of C 19 Demonstrations of CO 2 storage SLEIPNER SNØHVIT WEYBURN IN SALAH GORGON K12B Source: IEA GHG FRIO BRINE KETZIN Nagaoka

Geological Sequestration of C 20 Sleipner CO2 Injection

Geological Sequestration of C 21 What is keeping the CO 2 there? Trapping Mechanisms  Closure - from day one – faults?  Micro-pore trapping - during injection - lasting  Dissolution in water - sinking to the bottom – centuries  Mineral binding - precipitating solids – centuries/millennia Tore A Torp

Geological Sequestration of C 22 Possible Leakage? Leakage paths?  WELLS - Corrosion of cement & steel  Faults/Cracks – Overpressure critical  Underground fluid mobility – Site specific Prevention  Detection  Remediation Tore A Torp

Geological Sequestration of C Monitoring: Safety Over TIME?  Before start: Site selection, Planning and Risk assessment =>licence  During injection: Monitoring – “Watch the barn doors” => report  Closure: Monitoring and long-term risk => agreement  Post-closure: Monitoring gradually less => hand-over  Safety against leakage will be better over time! 23 Tore A Torp

Geological Sequestration of C CO 2 Capture and Storage (CCS) 24 Leg 2: COST of Capture  Energy use  Costs  Better technologies Leg 1: TRUST in Storage  Methods from oil and gas industry  Geology varies from place to place  More demonstrations Pace: CO 2 Transport Pipeline Ship  Large projects Tore A Torp

Geological Sequestration of C 25 Vision

Geological Sequestration of C Total Lacq Project (~60 MM €)  Gas processing plant  Steam needs, to be done with CH 4 + O 2  This results in almost pure CO 2 + H 2 O   So, they plan to inject the CO 2 into the Lacq natural gas reservoir, displace a little bit more gas  150,000 t in 2 yrs, starting in 2008  …the first integrated CO 2 capture system using oxy-fuel combustion combined with storage in a depleted hydrocarbon field.

Geological Sequestration of C SUMMARY…  First genuine sequestration project  High permeability, high porosity reservoir for the CO2, good seal, etc.  Not fully driven by economics (gov’t subsidy)  A model for future sequestration projects…