The latest n-XYTER Test Results Krzysztof Kasiński (AGH Kraków) CBM Collaboration Meeting 26.02.2008 Acknowledgements: Paweł Gryboś, Robert.

Slides:



Advertisements
Similar presentations
HCAL Front End Boards HCAL – Technical Meeting Status of the FE Boards Parameter Shift Register Time Schedule Test Setup Mathias Reinecke.
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
London Collaboration Meeting September 29, 2005 Search for a Diffuse Flux of Muon Neutrinos using AMANDA-II Data from Jessica Hodges University.
SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
A scalable DAQ system using the DRS4 sampling chip H.Friederich 1, G.Davatz 1, U.Hartmann 2, A.Howard 1, H.Meyer 1, D.Murer 1, S.Ritt 2, N.Schlumpf 2 1.
ITOP LEPS Beam Test Analysis LYNN WOOD JULY 17, 2013 PACIFIC NORTHWEST NATIONAL LABORATORY.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
1 QED In Vivo USB Input Output Box configuration This tutorial contains a number of instructions embedded in a great deal of explanation. Procedures that.
TOT01 ASIC – First Results (STS prototype chip – first results) Krzysztof Kasiński, Paweł Gryboś,Robert Szczygieł
MEDIPIX3 TESTING STATUS R. Ballabriga and X. Llopart.
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
Performance of SPIROC chips in SKIROC mode
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Status of Detector Prototype (for Hawaii meeting at Big Island) August 24, 2002 Yee Bob Hsiung For Koji Ueno, Yuri Velikzhanin Yanan Guo and Eddie Huang.
In-Beam PET Status Report -- TPS. 2 TPS project PET monitoring prototype 2D view of the FOV coverage of the 4+4 modules Use of 4 modules vs. 4 modules.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.

U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
A study of systematic uncertainties of Compton e-detector at JLab, Hall C and its cross calibration against Moller polarimeter APS April Meeting 2014 Amrendra.
7 Nov 2007Paul Dauncey1 Test results from Imperial Basic tests Source tests Firmware status Jamie Ballin, Paul Dauncey, Anne-Marie Magnan, Matt Noy Imperial.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
First results from PADI-2 Mircea Ciobanu CBM Collaboration Meeting March 10 –13, 2009 GSI-Darmstadt FEE1.
Fully depleted MAPS: Pegasus and MIMOSA 33 Maciej Kachel, Wojciech Duliński PICSEL group, IPHC Strasbourg 1 For low energy X-ray applications.
Performance of a 128 Channel counting mode ASIC for direct X-ray imaging A 128 channel counting ASIC has been developed for direct X-ray imaging purposes.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
Beam Tests of 3D Vertically Interconnected Prototypes Matthew Jones (Purdue University) Grzegorz Deptuch, Scott Holm, Ryan Rivera, Lorenzo Uplegger (FNAL)
Michał Dwużnik, for the SCT collaboration
Development of the Readout ASIC for Muon Chambers E. Atkin, I. Bulbalkov, A. Voronin, V. Ivanov, P. Ivanov, E. Malankin, D. Normanov, V. Samsonov, V. Shumikhin,
CS TC 22 CT Basics CT Principle Preprocessing. 2 CT Basics CT principle preprocessing CS TC 22 Blockdiagram image processor.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Status of the n-XYTER testing Knut Solvag, Gerd Modzel, Christian Schmidt, Markus Höhl, Andrea Brogna, Ullrich Trunk, Hans-Kristian Soltveit CBM.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
ALIBAVA system upgrade Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia) 1 ALIBAVA system upgrade 16th RD50 Workshop, 31 May-2 June 2010, Barcelona.
RICE: ICRC 2001, Aug 13, Recent Results from RICE Analysis of August 2000 Data See also: HE228: Ice Properties (contribution) HE241: Shower Simulation.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
1 Chapter No. 17 Radiation Detection and Measurements, Glenn T. Knoll, Third edition (2000), John Willey. Measurement of Timing Properties.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Update on works with SiPMs at Pisa Matteo Morrocchi.
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
Readout controller Block Diagram S. Hansen - CD-1 Lehman Review1 VXO Ø Det Links to 24 SiPM Front End Boards Clock Event Data USB ARM uC A D Rd Wrt 100Mbit.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
FCAL Krakow meeting, 6. May LumiCal concept including the tracker R. Ingbir, P.Růžička, V. Vrba.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
Page Detector and Electronics R&D for picosecond resolution, single photon detection and imaging J.S. MilnesPhotek Ltd T.M. ConneelyUniversity.
 13 Readout Electronics A First Look 28-Jan-2004.
SCT Links Operation Performance from QA and operation
Digital Light Sources First introduced in 2001.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
HERD Prototype Beam Test
LHC1 & COOP September 1995 Report
14-BIT Custom ADC Board Rev. B
Control of ASICs via GBTx
on behalf of the AGH and UJ PANDA groups
CTA-LST meeting February 2015
Roberto Chierici - CERN
A First Look J. Pilcher 12-Mar-2004
Status of n-XYTER read-out chain at GSI
Commissioning of the ALICE-PHOS trigger
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
PHENIX forward trigger review
Presentation transcript:

The latest n-XYTER Test Results Krzysztof Kasiński (AGH Kraków) CBM Collaboration Meeting Acknowledgements: Paweł Gryboś, Robert Szczygieł (AGH, Cracow) Adam Czermak, Bogdan Sowicki (INP, Cracow)

Presentation Outline  Hardware & Software  Uniformity Measurements Front-End gains Thresholds  Comparator Threshold Correction  Timestamp Resolution Analysis  First Acquisitions With Si Detector  Laser diode  Strontium Sr90  Summary CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow)

Sucima Imager DAQ board + n-Xyter Mainboard USB 2.0 Virtex 2 FPGA I2C LVDS 2 n-Xyter ASICs AC coupled detector Heatsink Absolutely required! > 150 *C ~70 *C Monitor & test pins Detector bias CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow)

ASICs and Detector topbottom Heatsinks Required! >90 *C ~50 *C Silicon detector 128-stripes AC-coupling 75 um pitch 1 cm length Several channels left floating CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow)

The Software layer CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow)

Uniformity test - thresholds floating inputs connected to detector CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow) Threshold [reg.value]

Uniformity test - thresholds CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow) Threshold [reg.value]

TrimDAC test Coverage: LSB Step: 0.69 LSB CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow) threshold correction

After the threshold correction... CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow) Threshold [reg.value]

After the threshold correction CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow) Threshold [reg.value]

Timestamp resolution – sources of errors Ideal case: Non-equal delays: Duty cycle different than 50%: Solution: programmable delay buffers: CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow)

T1 analysis disproportion due to the duty cycle =51.17% The best configuration 1 Region 1 Region 2Region 3Region 4 CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow) 10% of events will have an error on T1 bit

disproportion due to the duty cycle =49.3% optimal configuration T0 analysis Region 1 Region 4 Region 2Region 3 CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow) 7% of events will have an error in T0 bit

Laboratory set-up detector bias impulse generator Sucima Imager n-XYTER mainboard Detector daylight coverage & Laser Diode emmiter (replacable by the radiation source) CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow)

Preliminary results with a detector - Background radiation / noise - Noise cut-off at ~16 [reg.val] CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow) Threshold [reg.value]

Preliminary results with a detector Only a functional test of a detector + n-XYTER Pulsed laser diode directed at detector - configurable impulse length (from 20ns) - configurable number of impulses per second - possible manual triggering (sending certain number of impulses) CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow) Threshold [reg.value]

Strontium Sr90 first acquisition -37 hours of acquisition - ~37000 events-per-channel (total) - detector polarized by 135V - still too small statistic CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow) Threshold [reg.value]

Sr90 threshold scan results Non-conclusive! (due to varying source strenght and threshold spread) CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow) *For figure clarity three most deviated channels were removed Threshold [reg.value]

Sr90 acquisition – spacial radiation strength not connected not connected masked corrupted channel More counts due to the larger active area created by adjacent not connected stripes general source radiation characteristic CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow)

Sr90 treshold scan results After correcting for the source spacial radiation characteristic the channels can be compared *For figure clarity three most deviated channels were removed CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow)

Sr90 threshold scan results CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow) averaged counts for all channels (without most deviated ones) Derivative obtained using central difference formula ? Threshold [reg.value]

Summary  Optimal register values are still unknown  Comparator Threshold correction works fine  Timestamp resolution:  Bit 0: correction range wide enough, 7% error rate  Bit 1: not possible to fully compensate, 10% error rate  Measurements with detector:  Laser Diode Exciter proved that the full set-up operates properly  Strontium Sr90 – only preliminary measurement  Not enough statistic  Due to the spectrum spread it is not possible to calibrate the system  To Be Done in a near future: - Calibration using other radiation sources (with discrete energy spectrum)s CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow)

Treshold correction summary  Standard deviation before and after correction: A: C: B: D:  Expected values before and after correction: A: C: B: D:  Expected values spread improvement: > 0.64 (p-p)  TrimDAC current range is vast enough to successfully correct all channels (range: 19.42, step: 0.69 treshold bins)  The resolution of correction can bring down the standard deviation of the tresholds below one treshold bin CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow)

Threshold DAC characteristic CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow)

Sr90 threshold scan results Too small statistic! not-conclusive (nevertheless, a hump is visible) CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow) Threshold [reg.value]

AFE gain Settings [reg values]: Icg=255 Vbfb=47 Icg_foll=255 VbiasF=0 iComp=62 iTwc=75 iInv=37 Positive pulse PRELIMINARY MEASUREMENTS still optimal values are unknown CBM Collaboration Meeting Krzysztof Kasiński (AGH Cracow)

Settings [reg values]: Icg=137 Vbfb=0 Icg_foll=49 VbiasF=77 iComp=62 iTwc=75 iInv=37 Positive pulse