Delta Day 2
BC
Pump Discharge
Permanent Stopping
Pump Cable
Briefing Officer
35 HP Pump Switch ON OFF 8
35 HP Pump Switch ON OFF Place on back of placard # 8
Power Center
11
Place on back of placard # 11
Temporary Stopping
Unsafe Rib
Unsafe Roof
Unsafe Rib
Light Smoke End of Smoke
0.9 % CH4 200 PPM CO 17.0 % O2
Permanent Stopping With Door Open
End of Smoke Light Smoke
Battery Scoop Cannot Move
Permanent Stopping
3.5 % CH4 10 PPM CO 18.0 % O2
Body
5.8 % CH4 10 PPM CO 18.0 % O2
Barricade
Live Conscious Miner 28
“Help, it’s airtight behind me” Place on back of placard # 28
Face
Refuge Alternative
Temporary Stopping
Unsafe Rib
Unsafe Roof
Unsafe Rib
Light Smoke End of Smoke
0.9 % CH4 200 PPM CO 17.0 % O2
Airtight Cave
Airtight Cave
End of Smoke Light Smoke
End of Smoke Light Smoke
12 Timbers
1.2 % CH4 200 PPM CO 18.0 % O2
Live Unconscious Miner
Permanent Stopping With Door Open
3.5 % CH4 10 PPM CO 18.0 % O2
Pump Discharge
Pump Cable
5.8 % CH4 10 PPM CO 18.0 % O2
Line Curtain
Water Over Knee deep
35 HP pump
5.8 % CH4 10 PPM CO 18.0 % O2
Continuous Miner
Face
10 Crib Blocks Set (Passable)
Conveyor Belt
0.9 % CH4 150 PPM CO 17.5 % O2
Belt Tail Piece
Water Over Knee deep
3.5 % CH4 10 PPM CO 18.0 % O2
5.8 % CH4 200 PPM CO 18.0 % O2
Body
Roof Bolter
Face