AMS Software Review ACC Slow Control Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.

Slides:



Advertisements
Similar presentations
AMS operations on March 5-10 Mike Capell. TRD Strap-on Gas Bottle removal and TRD pressure monitoring Spada JMDC new program and files (power steps) Cai,
Advertisements

Dante Nakazawa with Prof. Juan Collar
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
We begin by subtracting noise (run flash lamp without HV) from signal (run flash lamp with HV) In the above for the cathode, we subtract the brown noise.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
Beam Position Monitors MICE CM Harbin January, 2009.
Status of UCSB LT Testing All 10 slots are equipped with UTRI, PAACB and adapter boards. All 10 UTRI connected to multiplexer. All 10 slots have HV connections.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
ARA Testbed Efficiency (Rough Cut) November 29 th Ben Rotter.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
Run 2 Upgrade of the ATLAS Minimum Bias Trigger Scintillators Rachel Hyneman, College of William & Mary Advisor: Antonio Sidoti, Instituto Nazionale di.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Apr, 16, 2008.
TP gate TP line 1 TP line 2 SlowCtrlRS232 SL PW thr Thr remote/local Thr set I2C 5V 2.5V Fast masks TP Lvds output for scalers gate control Slowctrl connector.
TRD DAQ (U) Software Status TIM CERN May.09 Chanhoon Chung, Mark Millinger, Andreas Sabellek IEKP - Universität Karlsruhe (TH)
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
AMS Cabling CERN Prevessin 893-1D020 December 6, 2006 Agenda 1) Brief overview -Show Plumbing and VC ring-mounted-hardware -AMS overall -Common.
ELMB miscellanea Dr Zhige (Gary) Zhang. ELMB miscellanea 1)Over voltage protection for analog input 2)Hardware resetting 3)Allocation for RICH2 4)Configuration.
TAU status 14/2/2012. Temperature behavior in red Delayed response No A/C T=24-25 C 19 o C Cold A/C T=19-20 C 30 o C Hot A/C T=28-32 C 16:30 18:00 04:00.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Brenda Dingus 2 June 2005 Using Multiplicity Scalers to Constrain Solar Spectra Low Threshold of Air Shower PMTs have 8 different multiplicity discriminators.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
Energy Distribution of Cosmic Ray Muons Paul Hinrichs With David Lee Advised by Phil Dudero.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
1 Cosmic Rate Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) The Set-up: Scintillating counters HV setting Coincidence adjustment Accidentals.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
DAQ/Trigger System proposal for the Angra Neutrino Detector Herman Lima Jr (18 May 2006) Centro Brasileiro de Pesquisas Físicas.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
TELL1 high rate Birmingham Karim Massri University of Birmingham CEDAR WG Meeting – CERN – 26/03/2012.
PMT gain check at Indiana University. Test setup inside dark box LED white paper PMT # JT0298 channel #2 (per HPK numbering) OTHER CHANNELS MASKED WITH.
AMS TIM & General Meeting ACC Testbeam Performance & KSC Cosmic Data Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, JSC Gilruth Center Houston, 24th.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
Status of the ETL 9125FLB Photomultiplier Tubes Steve Bache UNC-Wilmington.
The Cosmic Ray Observatory Project in Nebraska Conference on Teacher Research Experiences University of Rhode Island April 2005 An education and.
Calibration instructions for Quarknet Cosmic-Ray Detector How to Plateau the Counters A friendly guide for students and teachers Edited by Jeremy Paschke,
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
DOM Main PCB Testing Gerald Przybylski October 23, 2002 Lawrence Berkeley National Laboratory.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
AMS Ground Safety Review II Sept – KSC 1 AMS 02 –Thermal Control System Design Thermal control GSE at KSC.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
AMS Software Review ACC DAQ Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
CLIMATE GRAPHS. Temp In °C Precipitation In mm OTTAWA LABELS! CITY AT TOP TEMPERATURE ON LEFT IN °C PRECIPITATION ON RIGHT MONTHS ACROSS THE BOTTOM.
AMS Software Review ACC Analysis Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011.
AMS TIM & General Meeting TRD Integration Status Report Th. Kirn I. Phys. Institute B, RWTH Aachen Houston, 23rd October 2007.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Front End. Charge pre-amp and detector Voltage regulator. TOP side. Detector linear voltage regulator BOTTOM side. Charge pre-amp.
LKr status R. Fantechi.
CTA-LST meeting February 2015
KRB proposal (Read Board of Kyiv group)
HCAL Commissioning and Related Activities
Front-end electronic system for large area photomultipliers readout
Temperature coefficient
Climate Graphs What do they tell us?.
HallD Collaboration Meeting Jefferson Lab December 11-13, 2003
Pierluigi Paolucci & Giovanni Polese
T2Kロシアグループに向けたMPPC(SiPM)の性能評価
Presentation transcript:

AMS Software Review ACC Slow Control Monitoring Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, KSC, 31st January 2011

2 ACC Slow Control Monitoring ACC Electronic Scheme:

3 ACC Slow Control Monitoring ACC scintillator panel and PMT positions:

4 ACC Slow Control Monitoring History: Starting time: Cosmic Data Taking Period at CERN after AMS-02 Pre-Integration May 2008 Starting point: Adaption of Alexei Lebedevs Basic Code to ACC Slow Control Monitoring Code by Ph. v. Doetinchem, continued by A. Goerres to be continued by Ch. Chung + Th. Kirn

5 ACC Slow Control Monitoring Housekeeping Data S0 WAKE +Z S1 RAM +Z S2 WAKE -Z S3 RAM -Z Scalar rates of 4 PMTs of S0, S1, S2 and S3 crate PMT Voltages Global DALLAS Temperature sensors on PMT boxes PMT Discriminator threshold settings; Deactivated, all register values set to 200 (Max.)

6 ACC Slow Control Monitoring Housekeeping Data S0 WAKE +Z S1 RAM +Z S2 WAKE -Z S3 RAM -Z Scalar rates of 16 ACC PMTs Black (SFEA input channel 0) Red (SFEA input channel 1) Green (SFEA input channel 2) Blue (SFEA input channel 3)

7 ACC Slow Control Monitoring Housekeeping Data S0 WAKE +Z S1 RAM +Z S2 WAKE -Z S3 RAM -Z Discriminator threshold settings; all register values set to 200 (Maximum)

8 ACC Slow Control Monitoring Housekeeping Data S0 WAKE +Z S1 RAM +Z S2 WAKE -Z S3 RAM -Z High voltage settings of 16 PMTs of S0, S1, S2 and S3-crate Black (SFEA input channel 0) Red (SFEA input channel 1) Green (SFEA input channel 2) Blue (SFEA input channel 3) SHV-brickS0S1S2S3 Ch V1799 V2069 V Ch V2040 V2169 V2173 V Ch V1989 V2022 V2051 V Ch V1723 V1983 V1931 V

9 ACC Slow Control Monitoring Housekeeping Data S0 WAKE +Z S1 RAM +Z S2 WAKE -Z S3 RAM -Z Global DALLAS Temperature sensor on each ACC PMT box Operational: -30°C … +45°C Non-Operational: -35°C … +50°C

10 ACC Slow Control Monitoring Housekeeping Data – Trouble Shooting S0 WAKE +Z S1 RAM +Z S2 WAKE -Z S3 RAM -Z Scaler rising; Saturation at 32k, Check: HV, threshold, Trigger config. Due to noisy PMT → lower HV (PMT scaler rate after flight integration → Exchange)

11 ACC Slow Control Monitoring Housekeeping Data – Trouble Shooting Scaler increase (stepwise) due to change of HV settings (or trigger config) Scaler at zero → HV off?

12 ACC Slow Control Monitoring Housekeeping Data – Troubleshooting Temperature below operational range → HV off!