Eric Lécorché/ Epics meeting 21/10/2014 1 Setting the Spiral2 control system for the on-going commissioning.

Slides:



Advertisements
Similar presentations
Control System Studio (CSS)
Advertisements

SNS Integrated Control System SNS RDB Requirements, wish list, status A little history l Oracle RDB used exclusively by accelerator physics group l JERI.
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Paul Chu FRIB Controls Group Leader (Acting)
Integrating Acquired Subsystems Bob Dalesio 09/21/99.
Report from the Spiral2 control system development
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
Managed by UT-Battelle for the Department of Energy Open XAL Open Development of the XAL Accelerator Application Framework Christopher K. Allen Tom Pelaia.
JCE A Java-based Commissioning Environment tool Hiroyuki Sako, JAEA Hiroshi Ikeda, Visible Information Center Inc. SAD Workshop.
ESS DTL beam commissioning
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
IRFU COLLABORATION IN SPIRAL2 & LIPAC CONTROL SYSTEMS Françoise Gougnaud On behalf of D. Bogard, J-F. Denis, A. Gomes, J-F. Gournay (now retired), Y. Lussignol.
EPICS at APS in June.2006, n.kami, KEK J-PARC Status N. Kamikubota, KEK and J-PARC Control members * Try to enhance updates in the last 1 year.
IRMIS Status EPICS 2009 Vancouver D. A. Dohan. Outline IRMIS hardware model cable/cable run channel list Equipment Inventory System RDB Domain separation.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS Jan Control System Studio, CSS Overview.
ATF Control System and Interface to sub-systems Nobuhiro Terunuma, KEK 21/Nov/2007.
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
CEA DSM Irfu Spiral2 Injector diagnostics acquisition based on new hardware Françoise Gougnaud CEA Saclay IRFU - Françoise Gougnaud– Spiral2 Injector Diagnostics.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE  Questions? RADE Applications EN-ICE-MTA.
Evolution of VisualDCT Jaka Bobnar Matej Sekoranja Igor Verstovsek
Managed by UT-Battelle for the Department of Energy CSS Update Matthias Clausen, Helge Rickens, Jan Hatje and DESY Delphy Armstrong, Xihui Chen,
The recent history and current state of the linac control system Tom Himel Dec 1,
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Connecting LabVIEW to EPICS network
1 BROOKHAVEN SCIENCE ASSOCIATES High Level Applications Infrastructure and Current Status Guobao Shen, Lingyun Yang* Controls Group & Accelerator Physics.
Jan Hatje, DESY CSS – Control System Studio EPICS collaboration meeting CSS – Control System Studio Update EPICS collaboration meeting 2008 Shanghai.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
B. Dalesio, N. Arnold, M. Kraimer, E. Norum, A. Johnson EPICS Collaboration Meeting December 8-10, 2004 Roadmap for IOC.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
EPICS and LabVIEW Tony Vento, National Instruments
1 BEAM COMMISSIONING SOFTWARE AND DATABASE FOR J-PARC LINAC Hiroyuki Sako G. Shen, H. Sakaki, H. Takahashi, H. Yoshikawa, JAEA H. Ikeda, VIC C. K. Allen,
R. Krempaska, October, 2013 Wir schaffen Wissen – heute für morgen Controls Security at PSI Current Status R. Krempaska, A. Bertrand, C. Higgs, R. Kapeller,
TRIUMF HLA Development High Level Applications Perform tasks of accelerator and beam control at control- room level, directly interfacing with operators.
The use of EPICS as a C&I tool for the RFQ accelerator facility at Necsa Mr M. Matabane.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
An Introduction to Epics/Tango Steve Hunt Alceli EPICS Meeting 2008 INFN Legnaro 15 Oct 17:15.
ESS Integrated Control System Software Core Components S.Gysin
JLab Accelerator Controls Matt Bickley MaRIE discussion April 26, 2016.
Lécorché Eric, Epics meeting, 15/10/ Setting up the building blocks for the future Spiral2 control system.
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
Daniel Piso Fernández Some Ideas about Integration Support Cases and PLC Activities at Controls Division.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
Managed by UT-Battelle for the Department of Energy Experience on SNS Beam Instrumentation Collaborations Willem Blokland Beam Instrumentation Group Spallation.
Welcome to Michigan Welcome to MSU/FRIB Welcome to the Spring 2015 EPICS collaboration meeting Welcome! L.T.Hoff, Slide 1.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
SNS Integrated Control System ORACLE –JERI DB Generation April 27, 2004 Coles Sibley Jeff Patton.
Control System Tools for Beam Commissioning Timo Korhonen Controls Division Chief Engineer April 8, 2014.
RF Control Electronics for Linacs Overview of activities at Electronics Division, BARC RF control electronics for: 1.Super-conducting Heavy Ion Linacs.
LabVIEW Core I with RADE introduction EN/ICE/MTA.
LCLS Commissioning & Operations High Level Software
SNS Status Report Karen S. White 10/15/08.
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
LCLS Commissioning & Operations High Level Software
LLRF and Beam-based Longitudinal Feedback Readiness
The EPICS running envirionments in the five accelerator projects
High Level applications development status
RF introduction Anders Sunesson RF group leader
Presentation transcript:

Eric Lécorché/ Epics meeting 21/10/ Setting the Spiral2 control system for the on-going commissioning

Eric Lécorché/ Epics meeting 21/10/ Outline  Introduction The Spiral2 project Control system deliverables Collaborations for the control system  The Spiral2 control system Infrastructure Equipment configuration Sources and beam lines controls From RFQ to HEBT GUIs environment Software integration  And now ?

Eric Lécorché/ Epics meeting 21/10/ Spiral2 : a new Rare Ion Beam facility N Z DESIR experiment room beam production & acceleration S3 experiment room NFS experiment room

Eric Lécorché/ Epics meeting 21/10/ >1/3>1/2 RFQLinac NFS S3 To RIB production To DESIR room Q/A I (mA) Energy (Mev/u) CW max beam power (KW) Protons 1/ Deuterons 1/ Ions1/ Ions (option) 1/ Spiral2 : accelerator design Beam characteristics

Eric Lécorché/ Epics meeting 21/10/ Spiral2 : building constructions … May 2011 October 2012 October 2014

Eric Lécorché/ Epics meeting 21/10/ Spiral2 :... along with the process installation LEBT1 RFQ Linac tunnel Cryomodules waiting for installation

Eric Lécorché/ Epics meeting 21/10/ Spiral2 : and what about the control system ? VME chassis installed waiting for the electrical switch-on and checks Work project for the PCD control room Racks installation & cabling

Eric Lécorché/ Epics meeting 21/10/ HEBT Control system : ~70 man.years of collaboration (~8,5 FTW) BTI Equipment interfaces :  Emittancemeters  BEMs BTI Global coordination Equipment interfaces :  Power supplies  Profilers, BLMs, BPMs  RF Central services High level applications Databases CSS distribution SVN server Injector controls  Ion source control  Deuteron source control Epics distribution & repository Equipment interfaces :  CFs, slits, ACCTs-DCCTs  TOF, FCT, CFR LLRF

Eric Lécorché/ Epics meeting 21/10/ Control system : deliverables GUIs Epics tools IOC : Linux Channel Access Modbus/TCP IOC : VME (VxWorks) Power supplies PLCs Profilers RF amplifiers I/O GUIs Java/Xal Central services 35 Synoptics 30 Tuning applications 10 Services 20 IOCs 10 Drivers ~1500 equipment

Eric Lécorché/ Epics meeting 21/10/ Control system : shared platform  Common Spiral2 development platform (“topSp2”): Provided and maintained by Irfu Shared by the three labs Spiral2 version of the EPICS environment (development, operation)  Rules and formalization Interfaces between IOCs and GUIs Files naming Repository organization For on-site integration  Development hosted on a shared SVN

Eric Lécorché/ Epics meeting 21/10/ Infrastructure : central services Alarms handling (in-house development shared Ganil/Spiral2) Archiving system (CSS) E-logbook (commercial j5 product in use at Ganil)

Eric Lécorché/ Epics meeting 21/10/ Genioc generation utility Genauto generation utility IOC Configuration Module APP « PLC » Module APP Generates substitutions connections Developper module using VDCT Generates module APP Add Remove Inhibit Configure Equipement «Device configuration» database GUI GenIOC Software DevelopperEnd user Infrastructure : equipment configuration principles

Eric Lécorché/ Epics meeting 21/10/ Process Create device type « DT1» Generate module App for « DT1 » Create device « D1» of type « DT1 » Enter values for D1 Generate IOC hosting « D1 » Standard device configuration Create device type « DT2» Create device « D2» of type « DT2 » Enter values for D2 Generate IOC hosting « D2 » Epics fields  State, Defect, Cmd … N on Epics fields  IP, builder … Connections  Modbus, VME …  Displays Conversion Monitoring (adel, mdel) Value for non Epics fields PLC address …  Value for non Epics fields Value for connections PLC device configuration Infrastructure : equipment configuration phases

Eric Lécorché/ Epics meeting 21/10/ Infrastructure : machine settings management Accelerator hierarchy description Lattice machine configuration database

Eric Lécorché/ Epics meeting 21/10/ Sources and LEBTs : sources control Deuterons & LBE2/C : Used and validated during production Ions & LBE1 : Different from control system  To be tested

Eric Lécorché/ Epics meeting 21/10/ Sources and LEBTs : integration of devices Faraday Cups & ACCT-DCCT Emittancemeters Profilers Slow chopper Slits Power supplies

Eric Lécorché/ Epics meeting 21/10/ Beam Position Monitor Specific VME 64 hardware and software  In progress From RFQ to HEBT : Beam diagnostics Time Of Flight Modbus-TCP & binary ADAS ICV 196 Fast Faraday Cup Stream device (Agilent Oscilloscope) Beam Loss Monitor Cosylab development for VME Caen 1495  June 2015 Beam Extension Monitor NIM Multichannel Canberra Analyzer  Just starting

Eric Lécorché/ Epics meeting 21/10/ From RFQ to HEBT : beam dump activation monitoring Limitation of the Linac beam dump activation Objective Labview cRIO device EPICs IOC CSS/BOY GUI I/Os Implementation EPS classified device FMEA required

Eric Lécorché/ Epics meeting 21/10/  CSS/BOY suite adapted for Spiral2 (Ganil) Nb : former EDM screens developped at the beginning still there Contexts : CSSdev : development CSSop : operation Widget library  Available : TOF / FCT-CFR interfaces, Emittance control & display, AES interface  Under development BTI GUI, Machine synoptics  To be developped Interlocks, Beam pulse control, Beam losses  And many others to come … GUIs : CSS/BOY use RF supervisory controls (under evaluation)

Eric Lécorché/ Epics meeting 21/10/ CSSop  Operator control environment : CSSop Implementation : Perspectives limited to CSS runtime and data-browser One unique workspace NFS mounted for all stations (Eclipse lock suppressed) For operation : No editing capability for no hazardous modifications Light view : unused menus suppressed One central and unique launcher for all applications : CSS, Java/XAL, EDM (+Ganil/Ada ones). GUIs : CSSop

Eric Lécorché/ Epics meeting 21/10/ CSSop :Synoptique viewGUIs : CSSop synoptic Launcher Beam characteristics Synoptic Equipment Alarms (java) e-logbook (j5) Tuning (java) Equipment (CSS) Data Browser (CSS)

Eric Lécorché/ Epics meeting 21/10/ CSSop :Synoptique view GUIs : CSS widget library Font size Rotation Optional displays Alignment

Eric Lécorché/ Epics meeting 21/10/ CSSdev  Development environment : CSSdev SPIRAL2 accelerator widget library SPIRAL2 OPI templates automatically added in user’s workspace : Beam characteristics header Launcher Pydev added SVN access added … Common icons and pictures Graphical common usage template  CSSdev & CSSop distribs’ link : GUIs : CSSdev

Eric Lécorché/ Epics meeting 21/10/  Environment Java programmation Derived from XAL framework (SNS)  Available Parameter management Optimization Emittance limitation Beam analysis Hook Beam profilers display  Under development Power raise  To be developped Cavity tuning MPS GUIs : high level applications Optimization Emittance limitation Power raise (graphical design) Cavity tuning (simulation mode)

Eric Lécorché/ Epics meeting 21/10/ Integration : work flow  Integration mechanism Coherency check between Software deliveries (through SVN) Conventions & rules genIOC environment  Control system evolutions Identified items : topSp2 repositories  Modules  Equipment  Alarms CSS GUIs Java applications Operation & maintenance modes Procedures Software tools & utilities work flow diagram IOC or module creation /modification Switch to maintenance mode Evolution type ? IOC Module Equipment conf. Equipment configuration Functionnal tests Switch to operation mode

Eric Lécorché/ Epics meeting 21/10/  Control system Software : Infrastructure : ~ready for use Integration of external developments on Ganil site : in progress Testing & commissioning Sources & LEBTs :  Prior to software : installation, cabling and wiring tests  Control system tests possible when equipment declared available From RFQ to HEBT : ~ expect to provide basic functionalities Knowledge transfer : ? Spiral2 project Conclusion : and now ? RFQ + MEBT 05/2015 Linac + HEBT 09/2015 Sources + LEBTx 12/2014 Ganil Accelerator Division Operation Technical groups  Control group

Eric Lécorché/ Epics meeting 21/10/ Thanks for your attention ! Deroy J.C, Gillette P., Haquin C., Lécorché E., Lemaître E., Normand G., Patard C.H., Philippe L., Rozé J.F., Touchard D. (Duneau P., Lermine P., Loyant J.M.) Denis J.F., Gougnaud F., Lussignol Y. (Gournay J.F.) Graehling P., Hosselet J., Maazouzi C.