Technical Plenary From: oneM2M TP leadership Source: Meeting Date: 2015-01-21 Agenda Item:

Slides:



Advertisements
Similar presentations
SEM10-04 Initiation of a Work Item ETSI Seminar © ETSI All rights reserved.
Advertisements

Office of Special Education & Early Intervention Services What happens after Focused Monitoring? -
We ensure collaboration through a unique Moneyball-style approach to team assembly Agile Team, Custom-Designed for You Works well together Fits seamlessly.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 7 1 All you always wanted to know about.
Coherent Web Sustaining Engineering Plan 1. The Coherent Web team will: Utilize two-week development “sprints” to plan and track implementation activities.
Release 2: Work Items best practices Group Name: TP15 Source: Scarrone Enrico, Telecom Italia Meeting Date:
© 2008 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
Adjusting EPLC to your Project Colleen Robinson & Teresa Kinley Friday, February 6, 2009.
Support Events for Teachers and Lecturers 146 subject support events for new Higher courses held for 7439 delegates from November 2013 – March
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
3G.IP/ R1 3G.IP 2002 Charter. 3G.IP/ R1 2 3G.IP Mission Statement u Actively promote a common IP based wireless system for third generation.
Independent User Acceptance Test Process (IUAT)
Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M,
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
Setting oneM2M’s Market direction
Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)
International Harmonization of Cooperative Systems Standards and the IntelliDrive SM Program ITS-JPO Standards Program Update Brian Cronin Team Leader,
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
TSG-S Project Coordination Recommendations Nick Yamasaki TSG-S Chair ABSTRACT: This document presents TSG-S recommendations for improved coordination of.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
Unit Test Process Authors:Sergey Fedorov, Dmitry Balkin, Dmitry Korenkov June 2005.
Objectives: Define and implement a website layout that enables users to find key information efficiently Develop a process to ensure the sustainability.
Future Meetings for TSG-S TSG-S Chair Nick Yamasaki (KDDI) 21 July
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
Work Prioritization Model (WPM) Team Status Update Olga Cavalli Chair – WPM Team 10 March 2010 Presented to: GNSO Council.
31 2. Form 470: Starting the Application Process.
Certified Evaluation Orientation Non-Principal Administrative Certified Staff July 20, 2015 Complete Plan posted on District Website
A discussion on Release duration TP #14 Source: JaeSeung Song, KETI (TTA), Meeting Date: TP Discussion_on_Release_duration.
Technical Plenary Terms for the collaboration with P2413 From: oneM2M TP Chair Source: Meeting Date: Agenda Item:
Developing MARCOM and Outreach activities Group Name: MARCOM Source: Gerry McAuley, Ultan Mulligan Meeting Date: Agenda Item: n/a.
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
TGm Work Plan Adhoc Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/0747r1 Date Submitted: Source:
Work Prioritization Model (WPM) Team Status Update Olga Cavalli Chair – WPM Team ?? March 2010 Presented to: GNSO Council.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
Quarterly Geo/SIG Coordinator Webinar June 25, 2014.
Internal market, Industry, Entrepreneurship and SMEs 63rd GRB February 2016 EC study to enhance UN Regulation Nos 9, 63 and 92 with respect to sound.
OneM2M next steps Group Name: TP Source: TP leadership Meeting Date: Agenda Item: TBD.
CEOS Response to GEOSS Water Strategy
Status of Active Work Items Level of Completeness
New project request process training
System Office Performance Management
Engineering Activities In Software Development
Release Timeline Discussion R2 and beyond
IEEE Presentation Submission Template (Rev. 9) Document Number:
WPM ad-hoc group report TP#25
Implementation Strategy July 2002
NG Strawman – Ofgem Response
My UI Career Process improvement for more meaningful and
How to Successfully Implement an Agile Project
CEOS Information Systems Survey
January 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2018] Date.
Simplification of the UN Lighting and Light-signalling Regulations
Unit 09 – LO3 - Be able to Implement and Test Products
Submission Title: [ e Closing Report for November 2015 Session]
Portfolio Management Process & Customer Request Management
September 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG 7a Closing report for September 2014]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
NG Strawman – Ofgem Response
Definition of Project and Project Cycle
<month year> doc.: IEEE < e> <Jan 2019>
Priorities and contents of releases
Addressing State and MPO Concerns with Performance Requirements
EC Motions – November 2005 Plenary
IEEE P Wireless RANs Date:
LAMAS Working Group 6-7 December 2017
March 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [IEEE b timeline] Date Submitted:
TGbb September 2018 Closing Report
Driving Successful Projects
Presentation transcript:

Technical Plenary From: oneM2M TP leadership Source: Meeting Date: Agenda Item:

© 2015 oneM2MMARCOM Report Timeline for oneM2M Release 2 2 TP15 Jan 2015 TP17 May2015 TP18 July 2015 TP20 Nov 2015 TP23 May 2016 R1 Publication and ratification TP15.1 Window for R2 feature WIs R2 work program Deadline for R2 WIs, Market view of R2 (Marcom) Assess duration of R2 + consider priority Stage 1 freeze R2 Target date for Stage 2 freeze R2 Target date for R2 Stage 3 freeze publication R2 and ratification Essential Corrections (COR) Small Technical Enhancements and Improvements (R2)

© 2015 oneM2MMARCOM Report Recommendations Encourage contributors to progress features for stage 1,2,3 without waiting until e.g. a stage 2 is frozen should be possible because stage 3 (and related methodology) is stable R1 maintenance can be published/ratified as frequently as needed Ensure all documents are available under (after every meeting): Encourage WIs to be submitted ASAP and consider stage 1 release by TP18

© 2015 oneM2MMARCOM Report WPM aspects Coordinate release 2 description document – after TP17 Gating list of Mandatory content for R2

© 2015 oneM2MMARCOM Report For discussion Do we need intermediate candidate release? Need for prioritization? 18 months release cycle, too long?