Market Systems Release Update Modifications Committee Meeting 58 December 4 th 2014 1.

Slides:



Advertisements
Similar presentations
Ad Hoc Bulk Electric System Task Force Update RPIC February 19, 2009.
Advertisements

Market Systems Release Update Modifications Committee Meeting 48 April 11 th
MOD_14_12 Reference to MO Status for VTOD. Context (1)  Mod_47_08 V2  Approved by the RAs in May 2009  Implemented in the SEM systems in November 2010.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
The Regulation on wholesale Energy Market Integrity and Transparency (REMIT)
Market Systems Release Update Modifications Committee Meeting 61 April 15 th
Market Systems Release Update Modifications Committee Meeting 49 June 13 th
2012 Program Design Discussion Charlie Garrison, David Hill and Ron Reisman Renewable Energy Market Manager Team Renewable Energy Committee Meeting September.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 31 January 2012.
INTRA-DAY TRADING Development of Modification(s) 1st February 2011.
Information Dissemination Strategy An Update Presenter: Bruce Locke.
Rocky Mountain Power Collection Agency Fees Docket No T08
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 25 September 2012.
1 Market Operator User Group Meeting 1 Market Operator User Group Meeting 13 th of March 2012 The Oval, Dublin Conference Call Number:
Retail Market Subcommittee Update to COPS Kathy Scott May 13,
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 31 July 2012.
Market Systems Release Update Modifications Committee Meeting 53 February 6 th
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Requirement Development Feb 11Mar 11Apr 11May 11Jun 11Jul 11Aug11Sep 11Oct 11Nov 11Dec 11 [30/04/11] URS Sign-Off [29/07/11] Design Sign-Off 2011 [27/04/12]
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Market Systems Release Update Modifications Committee Meeting 55 June 19 th
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
Market Systems Release Update Modifications Committee Meeting 65 December 3rd
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Master Plan Process FY Proposed Draft. October - February Cluster Groups and Units Identify Initiatives These are general goals or outcomes that.
MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 27 March 2012.
Overview of Proposed Educator Evaluation Regulations August 1, 2012.
1 Austin, TX November 11 th, 2004 TX SET Update. 2 TX SET Version – 2.0A – 2.1 Discussion Topic.
Update to RMS June 2,  Smart Energy Roadmap Report ◦ Recommendation review led by Doug Lewin of SPEER ◦ Report accessed via
Market Systems Release Update Modifications Committee Meeting 52 December 5 th
1 Briefing on the Draft Call for Projects and Schedule for the Air Quality Conformity Assessment for the 2011 CLRP and FY TIP Technical Committee.
DRSEC Update Transmission Workstream 06 November 2008.
1. 2 TX SET Version Release Schedule RMS Assignment /Action Item Form Discussion Topic.
STD/PASS/TAGS – Trade and Globalisation Statistics STD/SES/TAGS – Trade and Globalisation Statistics Item 18a Progress and Planned Revision Timetable for.
Report December 14, 2015 doc.: /0055r0 Jeorge Hurtarte, TeradyneSlide 1 IEEE activities related to NGMN Date: 14 December 2015 Authors:
Project Parkway Timeline to 2011 April 1, 2010 Town Hall Meeting Steering Committee Schools February 2009 May 18, 2009 Project Parkway Community Kick-
PCE Program Debrief Jim Eggemeyer, Director, Office of Sustainability Shawn Marshall, LEAN Energy US March 24, 2016.
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
EU Implementation Programme
IGG Agenda 17th December 2009 Minutes from Previous IGG Meeting
Grid Code Development Forum – 6 September 2017
Grid Code Review Panel 16th August 2017
Transmission Planning Code
Global Aggregation Mod raised by ESB CS at Mods Meeting 24 ( )
Overall Project RAG Status
SEM Implementation of Meter Data Reading Aggregation, Communication and Storage SIMDRACS 22nd February 2006: IGG Hugh Mullany.
Potential Milestones A timeline to finish in one year
doc.: IEEE <doc#>
Indicative PRIDe Project Plan
doc.: IEEE <doc#>
doc.: IEEE <doc#>
Overall Project RAG Status
Exit Capacity Substitution and Revision
doc.: IEEE <doc#>
Overall Project RAG Status
DSC Change Committee Summary – 10th October
Review Art.17/12 for 2016 and onwards
Release 3 Scope & Proposed Plan
NDIA PMSC Guides Working Group
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
UK Link Future Release 3: Track 1 Implementation Approach for Approval at ChMC 2nd October 2018.
Overall Project RAG Status
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Review plan of the nature reporting – update 6
Release 3 Update 07th March 2018.
DEPARTMENT OF ARTS AND CULTURE
UK Link Future Release 3: Track 1 Implementation Approach for Approval at ChMC 2nd October 2018.
2015 January February March April May June July August September
Presentation transcript:

Market Systems Release Update Modifications Committee Meeting 58 December 4 th

All release milestones were met and the SEM R2.5.0 release was successfully deployed overnight on Friday November 14 th The following table outlines the release scope: *Added to scope on July 2 nd ** Added to scope of August 27 th 2 SEM R2.5.0 – November 2014 SEM R2.5.0 Approved Scope CR RefDescription SEM_PC_CR322Eligible Availability for Energy Limited Units Under Test SEM_PC_CR327Event Queuing SEM_PC_CR333Functionality to apply PUGDOG TTariff on a Trading Day basis SEM_PC_CR332Issue Zero Invoices SEM_PC_CR330Changes to IART Report SEM_PC_CR336HMRC VAT Change* SEM_PC_CR340DSI Processing of bids**

Release Cut-Off Date was Friday September 5 th, At the Cut-Off Date there were no: Approved Modification Proposals or New Change Requests submitted to the SDS As no functional changes were proposed, a Change Control Forum (CCF) meeting was not required. Three technical changes, required to ensure the Central Markets Systems remain under Core 3 rd party vendor support, are being proposed and have been assessed by our vendors. 3 SEM R2.6.0 – May 2015

The proposed scope for the May 2015 release is as follows: SEMO have issued a proposal to the Regulatory Authorities. Once approved, this will be published to the industry. 4 SEM R2.6.0 – May 2015 CR RefDescriptionABB HoursBrady Hours SEM_PC_CR341Oracle Upgrade1, SEM_PC_CR342AIX TL 9 Upgrade510N/A SEM_PC_CR343Smart FTP 6 Upgrade72N/A Total Vendor Effort2,447 hours

The release cut-off date for the SEM R2.7.0 release (October 2015) to the Central Market Systems was published on November 24 th. The cut-off date is: Friday March 6 th SEM R2.7.0 – Oct 2015 – Release Cut-Off Date

The current timelines are as follows: Implementing Acts have been entered into force. Start of data reporting Q Based on the draft requirements available, SEMO are currently working with ACER to develop sample reports appropriate for the SEM. It is likely that a CMS release will be required to facilitate REMIT reporting, the scope and impact of which will be determined after the draft requirements are finalised and the work with ACER around the report samples is complete. 6 REMIT Reporting

7 Questions