M3: ProDiver 525 Kavita Arora (M3-1) *Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 4 Feb 04 Size Estimates/ Floor Plan Overall.

Slides:



Advertisements
Similar presentations
Status Specification definition (done) Architecture
Advertisements

M2: Team Paradigm :: Milestone 6 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 7: March 1st Component Layout (Corrected) Overall Project Objective: Design.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 19 Overall Project Objective : Dynamic Control.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 6: Feb. 25 th Simulation Overall Project Objective: Design an Air-Fuel Ratio.
M3 Overall Project Objective: To design a chip for a SCUBA diver that does real-time calculations to warn the diver of safety concerns including decompressions.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Team M1 Enigma Machine Milestone 5 Adithya Attawar (M11) Shilpi Chakrabarti (M12) Zavo Gabriel (M13) Mike Sokolsky (M14) Design Manager: Prateek Goenka.
Noise Canceling in 1-D Data: Presentation #7 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 28 th, 2005 Functional.
Overall Project Objective: To design a chip for a SCUBA diver that does real-time calculations to warn the diver of safety concerns including decompressions.
Viterbi Decoder: Presentation #10 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 10: 5 th April Final Design Corrections.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 7 MAD MAC th March, 2006 Functional Block.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 3: Feb. 4 th Size Estimates/Floorplan Overall Project Objective: Design an.
Viterbi Decoder: Presentation #11 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 11: 12 th April 2004 Short Final Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 10: April 5th Chip Level Simulation Overall Project Objective: Design an.
Noise Canceling in 1-D Data: Presentation #10 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Mar 28 rd, 2005 Chip Level.
M3 Overall Project Objective: To design a chip for a SCUBA diver that does real-time calculations to warn the diver of safety concerns including decompressions.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Camera Auto Focus Presentation 4, February 14 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
M3: ProDiver 525 Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 9 Mar 29 Chip Level Simulation Overall Project.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 27 Overall Project Objective : Dynamic Control.
Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
M3: The Pro-Diver 525 Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Design Manager: Steven Beigelmacher Stage 11: Mini-
M3: ProDiver 525 *Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 2 Feb 04 Size Estimates/ Floor Plan Overall.
Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 4 MAD MAC th February, 2006 Gate Level Design.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 9: March 31st Chip Level Simulatio Overall Project Objective: Design an Air-Fuel.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 3 MAD MAC th February, 2006 Size estimates/Floor.
M3: ProDiver 525 *Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 9 Mar 29 Chip Level Simulation Overall Project.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage III: February 11 h 2004.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 10 MAD MAC th April, 2006 Top-Level Layout.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 8: March 24th Chip Level Layout Overall Project Objective: Design an Air-Fuel.
Sprinkler Buddy Presentation #8: “Testing/Finalization of all Modules and Global Placement” 3/26/2007 Team M3 Kartik Murthy Panchalam Ramanujan Sasidhar.
Noise Canceling in 1-D Data: Presentation #5 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 21 st, 2005 Component.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Viterbi Decoder: Presentation #6 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 5: 23 rd Feb Component Simulation Design.
Noise Canceling in 1-D Data: Presentation #6 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 23 rd, 2005 Functional.
Camera Auto Focus Presentation 3, February 7 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 8 MAD MAC nd March, 2006 Functional Block.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 5: Feb. 18 th Component Layout Overall Project Objective: Design an Air-Fuel.
Viterbi Decoder: Presentation #1 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
Viterbi Decoder: Presentation #5 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 5: 18 th Feb Component layout Design Manager:
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 4: Feb. 11 th Gate Level Design Overall Project Objective: Design an Air-Fuel.
Overall Project Objective: To design a chip for a SCUBA diver that does real-time calculations to warn the diver of safety concerns including decompressions.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: February 4 th 2004.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: 26 th January 2004.
M2: Team Paradigm :: Milestone 5 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage III: February 9 h 2004.
Camera Auto Focus Presentation 4, February 14 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
M3: The Pro-Diver 525 Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Design Manager: Steven Beigelmacher Final Presentation.
Viterbi Decoder: Presentation #4 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
Camera Auto Focus Presentation 6, February 28 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Noise Canceling in 1-D Data: Presentation #4 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 14 th, 2005 Gate Level.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage IV: February 18 h 2004.
Random Number Generator Dimtriy Solmonov W1-1 David Levitt W1-2 Jesse Guss W1-3 Sirisha Pillalamarri W1-4 Matt Russo W1-5 Design Manager – Thiago Hersan.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 9 MAD MAC th March, 2006 Functional Block.
Viterbi Decoder: Presentation #3 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
Sprinkler Buddy Presentation #3: “System Level View and Floor Plan / Sizing” 2/07/2007 Team M3 Kartik Murthy Kalyan Kommineni Panchalam Ramanujan Sasidhar.
Team W3: Anthony Marchetta Derek R. Ritchea David M. Roderick Adam Stoler Milestone 1: Jan 21 st Project Proposal Overall Project Objective: Design an.
HDR- Design Presentation Team M1: Emeka Ezekwe (M11) Chris Thayer (M12) Shabnam Aggarwal (M13) Charles Fan (M14) Team M1 Manager: Matthew Russo.
Alpha Blending and Smoothing
Presentation transcript:

M3: ProDiver 525 Kavita Arora (M3-1) *Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 4 Feb 04 Size Estimates/ Floor Plan Overall Project Objective: To design a chip for a SCUBA diver that does real-time calculations to warn the diver of safety concerns including decompressions sickness and lung overexpansion. Design Manager: Steven Beigelmacher

M3: ProDiver 525 Status Specification definition (done) Specification definition (done) Architecture Architecture –Matlab Simulation (done) –Verilog Simulation (done) –Hardware diagrams (done) –Floor Plan (done) –Gate Level Design (done) Gate Level Verification (in progress) Gate Level Verification (in progress) Component Layout (next week…) Component Layout (next week…) Reevaluation of Floorplan (next week…) Reevaluation of Floorplan (next week…) Still have a long way to go… Still have a long way to go…

M3: ProDiver 525 Design Decisions Changed the comparators from signed comparators to unsigned comparators, by looking only at the carry-out bit and not the carry-out bit and the sum, in order to minimize transistors Changed the comparators from signed comparators to unsigned comparators, by looking only at the carry-out bit and not the carry-out bit and the sum, in order to minimize transistors Changed the ROM from having values every five units to every four in order to minimize control logic Changed the ROM from having values every five units to every four in order to minimize control logic

M3: ProDiver 525 New Comparator Layout – comp5bit

M3: ProDiver 525 Verilog Verification (gate level) MATLAB: depthvector = [80*ones(1,60*35) 40*ones(1,60*20) 0*ones(1,60*40)]; [bodyvector,out]=pressurecalculator(depthvector); bodyvector(60*35): ans = bodyvector(60*55): ans = bodyvector(60*95): ans = SCENERIO: diver goes 80 feet for 35 min, 40 feet for 20 min, 0 feet for 40 min VERILOG: time= 2,safetywatch = 0 Test where the user will go down to 80 feet for 35 minutes, then 40 feet for 20 minutes, then 0 feet 40 minutes time= 6090,safetywatch = 1 time = 6305,pres=25,depth= 80 time= 9054,safetywatch = 2 time = 9908,pres=28,depth= 40 time= 10272,safetywatch = 1 time= 12165,safetywatch = 0 time = 17110, pres=18,depth= 0

M3: ProDiver 525 Previous Transistor Count MODULE= # transistors SUBMODULES (# transistors) Get K = 926 Control logic (68) 3 7-bit comparators (858) Pressure Calculator = C to SM conv, 9,26 (1162) Multiplier, 8 by 4 (912) Register, 25 bit (400) Subtractor, 9 bit (324) Adder, 25 bit (850) Safety Watch = bit comparators (642) Control logic (14) Ascension Watch = registers, 8 bit (768) Subtractor, 9 bit (324) Comparator 8 bit (322) 2C -> SM conversion, 9 bit (144) Control logic (6) Bottom Time = 1852 Registers, 8 bit and 17 bit (400) 3 8 bit subtractors (864) Addone 4 bit, 17 bit (294) Comparator 5 bit (214) Control logic (80) Time to Flight = 1836 ROM (64), demux (308) Register, 17 bit (272) Minus1, 17 bit (272) GetMax, 17 bit (920) Max Depth = 596 Register, 8 bit (128) GetMax, 8 bit (468) Time Left = 2026 Register, 8 bit x 2(256) subtractor, 8 bit x 2 (576) ROM (160), demux (724) Control logic- muxes (310) TOTAL = 13104

M3: ProDiver 525 Actual Transistor Count MODULE= # transistors SUBMODULES (# transistors) Get K = 620 Control logic (68) 3 7-bit comparators (552) Pressure Calculator = C to SM conv, 9,26 (1162) Multiplier, 8 by 4 (912) Register, 25 bit (400) Subtractor, 9 bit (324) Adder, 25 bit (850) Safety Watch = bit comparators (390) Control logic (14) Ascension Watch = registers, 8 bit (768) Subtractor, 9 bit (324) Comparator 8 bit (210) 2C -> SM conversion, 9 bit (144) Control logic (6) Bottom Time = 1768 Registers, 8 bit and 17 bit (400) 3 8 bit subtractors (864) Addone 4 bit, 17 bit (294) Comparator 5 bit (130) Control logic (80) Time to Flight = 1836 ROM (64), demux (308) Register, 17 bit (272) Minus1, 17 bit (272) GetMax, 17 bit (920) Max Depth = 596 Register, 8 bit (128) GetMax, 8 bit (468) Time Left = 2026 Register, 8 bit x 2(256) subtractor, 8 bit x 2 (576) ROM (160), demux (724) Control logic- muxes (310) TOTAL = 12350

M3: ProDiver 525 Gate Level Schematic – Top Level

M3: ProDiver 525 Gate Level Schematic – Pressure Calculator

M3: ProDiver 525 Gate Level Schematic – bottomTime

M3: ProDiver 525 Gate Level Schematic - safetyWatch

M3: ProDiver 525 Gate Level Schematic - ascensionWatch

M3: ProDiver 525 Gate Level Schematic - getK

M3: ProDiver 525 Gate Level Schematic - timetoflight

M3: ProDiver 525 Gate Level Schematic - timeLeft

M3: ProDiver 525 Gate Level Schematic - timetoflightROM

M3: ProDiver 525 Gate Level Schematic – timeLeft ROM1 ROM2

M3: ProDiver 525 Gate Level Schematic – multiplier

M3: ProDiver 525 Critical Path Critical Path – From the depth input through pressureCalc, then through safetywatch, and out to the safetywatch output signal Critical Path – From the depth input through pressureCalc, then through safetywatch, and out to the safetywatch output signal Critical path unimportant because the clock speed is 1 second Critical path unimportant because the clock speed is 1 second

M3: ProDiver 525 Questions?