Gaz-System S.A. Transmission System Operator Gdynia, 26.06.2009.

Slides:



Advertisements
Similar presentations
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Advertisements

North / North West Region Regional Gas Initiative Regulatory Co-ordination Workshop 8 th February 2007.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
1 POLICY AND STRATEGY OF SUSTAINABLE DEVELOPMENT FOR CENTRAL AND EASTERN EUROPEAN COUNTRIES UNTIL 2030 Warsaw, November 2005 Bolesław Rey Deputy.
1 The Bulgarian Natural Gas Market: The TSO’s point of view Angel Semerdjiev, Executive Officer, Bulgartransgaz EAD 30 January 2009, Sofia.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Commercial Frameworks for Energy Investment Regional Issues and Cooperation Mahama Kappiah ECOWAS Commission May 2008.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
Madrid, 16th February th IG Meeting South Gas Regional Initiative.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
Update on GTE Reverse Flow Study Vaclav Vocilka GIE Vice Executive Secretary Stakeholder Group Meeting GRI SSE, Gdynia 26 June 2009.
Overview of the latest developments of the Hungarian energy market Mr. György Hatvani Deputy State Secretary of energy and industry Ministry of Economy.
Overview of the Polish Energy Market & PGNiG Capital Group 6th Stakeholder Group Meeting Gas Regional Initiative – Region South-South East Gdynia, 26th.
Groningen, 07/08/2015 Natural gas infrastructure in Europe Experiences of an independent system operator Helmer Horlings.
Bulgartransgaz EAD: Perspectives for Investments and Developing of the Gas Infrastructure Southeast Europe Business Forum; 22 – 23 November 2012, Istanbul.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Market Integration & SoS Initial proposals for SJWS #5 ENTSOG offices – Brussels Stakeholder Joint Working Session – 20 March 2012.
2nd GTE Conference Copenhagen, September 2004 Author:Milan Sedlacek SPP (Slovak Gas Industry) Slovak Republic GAS TRANSIT THROUGH A NEW EU MEMBER STATE.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
Madrid, 11th February th IG Meeting South Gas Regional Initiative.
Directorate General for Energy and Transport Johannes ENZMANN European Commission DG Energy and Transport Unit Electricity and Gas GIE Annual Conference.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Investment in Gas Infrastructure A regulator´s view Nina GRALL Seminar on Gas Industry Restructuring in SEE 4/5th October 2005, Belgrade.
Presentation by Greta Monika Tuckute
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
GIE Annual Conference, Athens, 3 November 2005 Prospects of a Regional Gas Regulatory Framework Fostering a Sustainable Market-Based Investment Climate.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Gasunie gaat verder in gastransport Sharing lessons from unbundling Dutch unbundling, a long and winding road 4 November 2005, Athens.
Directorate General for Energy and Transport1 Ana Arana Antelo Head of Unit Electricty & Gas – European Commission/DG TREN GIE Annual Conference, ,
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
© ONTRAS Development and innovative strategies for transmission system operators Ralph Bahke Managing Director, ONTRAS.
Directorate General for Energy and Transport Johannes ENZMANN Administrator DG Energy and Transport European Commission GTE 2nd Annual Conference 23 September.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Biomethane and the European gas infrastructure EBA Workshop 3 September 2015 Thierry Deschuyteneer Executive Secretary.
Transparency GRI SSE -- 7th Stakeholder Group Meeting Vienna, 16 October 2009 Andrea Ćirlićová GTE+ Senior Adviser.
European Commission views on intra-day and balancing markets
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
The Energy Community C hrissa Argyriou – European Commission – DG Transport and Energy Electricity and Gas
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.

Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
Long-term modeling of resilience and flexibility of European gas transportation system: integrated factors Dresden, April 3, 2009 Vitaly Protasov, Expert,
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
European Developments Transmission Workgroup 1 st December 2011.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
Directorate-General for Energy and Transport Mark van Stiphout – C2 Electricity and Gas GSE Workshop on storage investment 24 May 2007 Policy framework.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
New transparency guidelines
Gas Supply to the EU – the Role of the Slovak Republic
GRI-S : Infrastructures The Union list of projects of common interest
Ben Voorhorst, President, ENTSO-E
Interconnectivity projects between the EU and Ukraine
GRI NW TRANSPARENCY PROJECT
The LNG role to improve SoS in Europe
Gas Quality & TSO – LSO Coordination
GIE Annual Conference Bratislava, September 2006
DRAFT DG TREN Staff Working Paper on LNG
Incentives for electricity infrastructure – ERGEG view
Scenario Framework for the Gas Network Development Plan
Presentation transcript:

Gaz-System S.A. Transmission System Operator Gdynia,

AGENDA GAZ-SYSTEM S.A. Transmission system - Facts & Figures Disruption of supply 2009 System development Activities

GAZ-SYSTEM S.A. Facts&Figures National gas transmission system operator (TSO) Established on the basis of the Directive of the European Parliament and the European Council 2003/55/EC Formed in April 2004, unbundled from PGNiG S.A. Joint-Stock Company, owned by the State Treasury as the only shareholder

Company-owned transmission assets worth over 3 billion PLN Near employees across Poland. 6 Regional Branches : Gdańsk, Poznań, Rembelszczyzna, Świerklany, Tarnów, Wrocław. GAZ-SYSTEM S.A. Facts&Figures

Transmission system elements (2009): km pipelines 14 compressor stations 57 gas nodes 970 exit points Main Characteristics: Polish gas system is connected with the European Gas Network system but only along the East- West direction. Gas imports mainly from Eastern direction. Gas Imports amounting to 70% of total national consumption.The remaining 30% is covered by national production. Transmnission of 14.7 bcm/year Transmission System Overview

TRANSMISSION SYSTEM Network

Underground Gas Storages Cooperation with Transmission System Operational capacity UGS mln m3 Technical transport capacity to supply the system (UGS withdrawal) mln m3/day Technical transport capacity to injection UGS mln m3/day HUSÓW 400 5,7 2,4 SWARZÓW 90 1,0 0,7 BRZEŹNICA 65 0,9 0,8 STRACHOCINA 150 1,2 1,4 WIERZCHOWICE 575 4,8 3,6 MOGILNO ,0 9,6 TOTAL ,618,5

DEMAND AND SUPPLY 2008

Supply 2008

Demand 2008

Supply and pressure - Drozdowicze

Supply and flows Peak day 2009

Supply and flows Peak day 2006

AVAILABLE CAPACITIES AND CONGESTIONS

Hermanowice-Strachocina Szczecin-Gdańsk Świnoujście- Szczecin Włocławek-Gdynia Szczecin-Lwówek Gustorzyn- Odolanów Rembelszczyzna-Gustorzyn Jeleniów-Dziwiszów Zdzieszowice- Ołtaszyn Skoczów-Komorowice-Oświęcim Strachocina- Wygoda Baltic Pipe LNG Terminal Network expansion

Development of Interconnections Poland- Czech Rep. Connection New connection integrating the gas systems of both countries which will diversify and ensure stable gas supplies to end customers Increase of safety of systems operations Project developed in cooperation with Czech TSO Commencement of operations: 2010/2011 Enhancing Poland-Germany Connection Development of existing interconnection between the gas systems of both countries Increase of safety of systems operations Possibility of increased flows from western direction in case of crisis Capacity increase: 0,5 bcm p.a. Commencement of operations: 2011

LNG Terminal will be located in the Port of Świnoujście Project developed by SPV Polskie LNG (PLNG) owned by GAZ-SYSTEM S.A. One jetty for LNG tankers LNG Terminal’s regas capacity: Phase I/II: bcm / 1,85-3,7 Mt LNG/year Phase III: 7.5 bcm / 5,6 Mt LNG/year LNG storage capacity: 2 tanks m 3 LNG each LNG loading infrastructure for trucks. Open season procedure - start 23 of June 2009 – end expected January 2010 documents available at LNG Terminal Świnoujście

Interconections - Conclusions LNG Baltic Pipe PL-CZ PL-DE

OPEN SEASON Applied in the case of constructing new elements of the gas system in order to adjust the parameters of the planned investment to market expectations. Procedure implemented pursuant to ERGEG guidelines. The procedure is conducted in strict cooperation with the Polish Energy Regulatory Office in order to ensure the Investor applies non-discriminative access policies to the network.

NEW PROJECTS – OPEN SEASON

GAZ-SYSTEM on Transparency Platform GAZ-SYSTEM is active on the Transparency Platform from its launch on 17th November The TSO-related information and Capacity & tariff information have been published On 17 march GAZ-SYSTEM switched display of its capacity data from Nm3/d to kWh/d. On 2 April GAZ-SYSTEM added to Transparency Platform data on its capacity allocation mechanism and on its balancing model, balancing tolerances applied and other static balancing information. GAZ-SYSTEM constantly uploads data files to the Transparency Platform. Actually GAZ-SYSTEM is working on its automatic upload of nominations, re-nominations and allocations for its respective interconnection points.

Interconnection Points Agreements GAZ-SYSTEM has signed IPA with all TSOs connected to our system: – Biełtransgaz (Belarus) – ONTRAS (Germany) – UKRTRANSGAZ (Ukraine) Due to geographic position we are like transition area between two arts of gas market – Eastern: quantity - volume by 20 C, energy day 8/8, allocation based on seller decisions No balancing market – Western Quantity – energy Energy day 6/6 OBA Market based balancing – Middle (PL) Quantity – volume by 0 C Energy day 10pm/10pm Regulated market But all discrepancies are covered in practice

Thank you for your attention