Concrete Test Section RPF 8 May 2002
Objectives Design details Material properties Instrumentation Traffic Construction Conclusion Outline
To calibrate cncRisk at the lower end of the traffic spectrum To quantify failure of low-volume concrete pavements Objectives
Cement and Concrete Institute CSIR Transportek University of Pretoria Alpha Stone and Readymix BKS Raubex Parties
University of Pretoria Section 1 75 mm SFRC (30 kg/m3) Joint spacing 3 m 140 mm Foam concrete subbase In situ Section 2 75 mm SFRC (30 kg/m3) Joint spacing 6 & 4 m 125 mm CTS In situ Design details
University of Pretoria (cont) Section 3 75 mm SFRC (30 kg/m3) No joints 25 mm ETB 125 mm CTS In situ Design details
CSIR Transportek Section 4 50 mm “CRCP” 50 mm ETB 125 mm CTS In situ Section 5 75 mm “CRCP” 25 mm ETB 125 mm CTS In situ Design details
CSIR Transportek Section mm “CRCP” 125 mm CTS In situ Design details
C&CI Section mm butt jointed Joint spacing 2 and 3 m 125 mm CTS In situ Section mm butt jointed Joint spacing 2 and 3 m 40 mm continuously graded asphalt 100 mm CTS In situ Design details
C&CI Section mm jointed Joint spacing 2, 3 and 4 m 125 mm gravel In situ Section mm butt jointed Joint spacing 2, 3 and 4 m 125 gravel In situ Design details
C&CI Section mm dowel jointed Joint spacing 2, 3 and 4 m Dowels c/c 125 mm gravel In situ Design details
In situ CBR80 Quartzitic gravel A-1-a G5/G6 Compaction 97% Mod. AASHTO FWD deflections 1,0 mm Material Properties
Subbase As in situ Compaction 97% Mod. AASHTO Stabilized with 2% CEM I 42.5 (C3) (Recycler) UCS 2000 kPa FWD deflection 0,9 mm and Stab 0,5 mm Material Properties
ETB Subbase material Stabilized with 1,5% anionic stable grade 60%, 1% cement Asphalt Continuously graded hot mix with 60/70 pen 12 mm aggregate size Material Properties
Concrete Strength f c MPa f f 3,7 - 5,6 MPa Mod E GPa Shrinkage0,05 - 0,06 % CementCEM I 42,5/GGBS 80/20 Material Properties
LVDT’s Centre Side Thermocouples Conventional Programmable MDD’s Weather station Instrumentation
Readymix concrete Compaction by poker and beam Curing compound Plastic sheeting Construction
Trucks leaving quarry Weighbridge data No of axles Approximately 300 E80’s per day To date E 80’s Traffic
Very little distress to date Vertical movement at joints under traffic but no relative movement Rocking of slabs on foam concrete Some corner breaks Plastic shrinkage cracks not affecting performance Observations
Ongoing observations Continual recording of instruments to end May Panel to define failure Analysis of results Availability of data Future