Masterton District Council Homebush Wastewater Treatment Plant Neighbours Meeting 29 September 2014.

Slides:



Advertisements
Similar presentations
EU regulations related to water and sanitation and the hygienic risks related to poor sanitation practices. Prof Thor Axel Stenström Swedish Institute.
Advertisements

Cultural Heritage Asset Management Plan (CHAMP) Training Introduction to EnvIS, CHAMP and the HA business case for environmental management.
Utility Course Case Studies CEA and Road Builders Workshop Joe Mah, M.Eng.P.Eng.
Kevin Jarman Deputy Director - Adults IAPT National Team
Sarah Evans (Senior EHO) & Angela Guy (Contaminated Land Officer)
Prepared by WMC Consulting Engineers Inc. John A. Wengell.
Abstract Characterizing the hydrology of the shallow riparian groundwater of the Rio Grande Bosque is important for understanding the interactions with.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Responses to the New Normal Creative Partnerships for Innovative Water Solutions Colorado Water Workshop – July 17, 2013.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
Te Kopuru Further Explanations. Recap Transition Rates Remission Policy Last year we introduced a new rates remission for the stormwater/wastewater increase.
Fort Bliss Energy, Water, and Solid Waste Sustainability Initiatives Draft Environmental Impact Statement (EIS) Public Meetings June & 13, 2013.
Water Pollution. Watershed A watershed is an area of land from which all the water drains to the same location, such as a stream, pond, lake, river, wetland.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
Nunavut Water Board Public Meeting Water Licence Amendment Rankin Inlet 3AM-GRA-1015 January
Masterton: Waste-to-energy concepts. Oxidation ponds Background Ruamahanga River.
TCEQ Trade Fair Joel Klumpp Texas Commission on Environmental Quality TCEQ Review Process for Innovative Water Treatment Technologies.
UK’s CDM Regulations 2007 and its Applications in Singapore
MEA Class EA Requirements to support a new Sewage Treatment Facility May, 2013.
Preparing for Winter 2010/11 Guidance Overview Stuart Low Planning Manager SG Health Delivery Directorate.
The Importance of Baseline Data More Than Just Counting Things Presentation to Geology Matters November 14, 2013.
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
Nunavut Water Board (NWB) Water Licensing Process Type “A” Water Licence 3AM-GRA1015 Amendment Application for Hamlet of Rankin Inlet Government of Nunavut,
Part 2 - Simplified Strategy. The IWCM Process The IWCM process consists of two main parts: Part 1: An Evaluation Study ( recently completed); and Part.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Preview of the Draft River Basin Management Plan SERBD Advisory Council September 2008.
Daniel Baláž, Ján Černecký State Nature Conservancy of the Slovak Republic Nature Conservation and River Monitoring in Slovakia.
Thames Valley/Matatoki Water Supplies October 2012.
June SURVEY OF EUROPEAN DIRECTIVES European directives are based on the new approach in order to provide free movement of goods in the single market.
Los Osos Community Services District Basin Management Planning and Proposed Work Program June 5, 2008.
Storms and Flooding across Aberdeenshire December 2012 Stephen Archer, Director of Infrastructure Services William Munro, Area Manager (Kincardine & Mearns)
Integrated Regional Watershed Management Plan Presentation – March 12, 2013 HLVRCD.
Kingsclear Consolidated School Parent / Community Meeting November 29, 2010.
Three Kings Quarry 19 August 2013 – Site Liaison Group Meeting Site Monitoring Report 1.
Former Point Cook Fire Training Area Contamination Remediation Works Project Community Information Session 26 September 2013.
MORRIS MILL PROPOSED URBAN SERVICES DISTRICT Presentation to County Council September 17, 2013.
What are some ways to reduce the risks to public health in drinking water from Salinas Valley? Andrew Mims Nitrates In Groundwater Presentation ENSTU 300.
Salinity and Bulk Water Workshop 27 October 2010 Werribee Irrigation District.
European Commission - DG Environment Unit D.2: Water & Marine 1 Pau-Plenary Session 14 may 2008 Pau-Plenary Session 14 may 2008 CMA developments and state.
Report of the NPDES Subcommittee. Conference Call Meetings July 8 and August 19 Mercury Discharges – Utility Request to Address Permit Requirements for.
Green Drop Compliance in Johannesburg Etienne Hugo General Manager: Operations Johannesburg Water (Pty) Ltd.
Neighbours’ Meeting 29 th September Introductions  David Hopman – Manager Assets and Operations  Kevin Godfrey – Treatment Plant Supervisor.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
Te Waihora/Ellesmere Catchment Regional Water Plan An Introduction for the Selwyn/Waihora Water Management Zone Committee Lynda Weastell Murchison Principal.
Deanna Streifel Environmental Engineering Officer Arnprior Waste Disposal Site Annual Monitoring Results.
TerraGraphics Prepared By: Infrastructure Revitalization Plan Basin Environmental Improvement Project Commission Coeur d’Alene River Basin Communities.
Critique of North Branch of Sunrise River TMDL Nate Topie and Taylor Hoffman.
Fair Go Rates System Dr Ron Ben-David Chairperson MAV Rate Capping Forum 26 November 2015.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
Kettle River Watershed Management Plan Stakeholder Advisory Group Meeting #3 – July 19, 2012.
Planning Commission Study Session: Preferred Plan July 23, 2015.
A tale of two developments Stephen Gardner Environment Canterbury.
Rarotonga 29 th January, What is an EMP? An EMP sets out how a business will undertake its operation to manage pollution risks. EMPs deal with pollution.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
Water Quality Facts John Shirey City Manager William Busath, P.E. Director of Utilities Pravani Vandeyar Water Quality Superintendent.
Waste and Minerals Core Strategy Preferred Strategy Consultation Land Disposal Workshop Uckfield 3 November 2009 Ian Blake, Team Manager – Waste and Minerals.
AEMCPresentation to GWCFPAGE 1 AEMC and Rule changes Presentation to AEMO Gas Wholesale Consultative Forum Kamlesh Khelawan Director This presentation.
Bow Basin Watershed Management Plan Revised Terms of Reference
Mulberry River Watershed
Fair Go Rates System Dr Ron Ben-David Chairperson
Jon Risgaard, Wastewater Branch Rick Bolich, Raleigh Regional Office
Water Reclamation Plant Feasibility Study Update May 28, 2014
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
Hydrogeologic Investigations of the Silver Lake Wetland
Fair Go Rates System Dr Ron Ben-David Chairperson
Industrial Pollutants in the Haw: Community Impacts and Action
GROUNDWATER CHARACTERISATION in England & Wales
Review of Annexes I and II of the Groundwater Directive 2006/118/EC
Grey Māwhera FMU Group July 2019 Meeting.
Presentation transcript:

Masterton District Council Homebush Wastewater Treatment Plant Neighbours Meeting 29 September 2014

Neighbours Meeting 29 September 2014 Introductions  David Hopman – Manager Assets and Operations  Ian Steer – Special Projects Manager

 Communicate the findings of the Annual Report on plant performance.  Overview of construction issues associated with the old ponds.  To provide an update on progress with the project and the timeline for the coming year.  To provide neighbours with an opportunity to raise any issues they may have and for appropriate people from within the project team to answer questions.

Homebush Site

Construction Overview – Work completed  Completed construction, lining and commissioning of Pond 1A (final pond).  Dewatering, de-sludging and landfilling of material from old pond 1.  Construction of the sludge landfill.  Partial de-sludging of old ponds 2 & 3.  Completion of 65% of the irrigation area including automation.  Completion of landscaping.  Completion of all access roads.

Operational Overview – Work completed  Fully operational ponds (Ponds 1A, 1B & 2-6).  Diffuser fully operational.  Border strip irrigation from November 2013 to April  Harvesting and Sale of balage (3 rotations) & production of 1600 bales.  Average irrigation depth of 410mm. (compared to 330mm for Riversdale). Works remaining ◦ Complete de-sludging of old ponds. ◦ Construction of remaining irrigation areas. Outstanding issues ◦ Areas of compaction over some areas of the site are limiting irrigation rates. ◦ Elevated Ground water level preventing construction of all irrigation areas in M zone.

For the 2013/14 monitoring period, the following was noted:  The discharged flows complied with the consent requirements on all occasions.  The quality of the discharge complied with the consent conditions.  E. coli concentrations level downstream of the WWTP were below the surveillance level on all occasions except for 6th October when the upstream concentration was also high.  Odour and discharge clarity problems were observed when the last pond was commissioned in May/June.  The discharge is still having a localised effect on in-stream biological community structure in the Ruamahanga River and Makoura Stream (although less that the previous year).

Figure 1

Figure 2

Figure 3

Ruamahanga River E. coli Levels of Contact Recreation Guidelines (July 2013 – July 2014) MfE Action Level (550/100mL) MfE Alert Level (260/100mL) RUA 2 (Downstream) RUA 1 (Upstream) Figure 4 Red – Action Zone Orange – Alert Zone Green Zone

General direction of Homebush groundwater flow

 Monitoring wells were drilled at Homebush in 2004 to provide reference data.  Surveys were undertaken to establish levels of the wells and the groundwater.  A number of errors (survey, interpolation of data and change of datum) have now been identified.  The design of the border strips located over the old ponds was based on incorrect groundwater level information.  These errors only became apparent when the contractor began de-watering of the old ponds and preparing for construction of the border strips in the M zone.

Can Council take legal action?  Consultant for initial survey engaged directly by Council.  Information supplied to Beca in good faith.  Subsequent surveyor engaged by Beca used same base level information for wells.  Minor groundwater irregularities were noted during construction but not considered significant.  Legal advice is it would be difficult and costly to prove a case against any of consultants or contractors involved.

The current situation  The design includes a factor of safety of 30%. This was considered prudent design to address potential risks.  Without the M Zone the treatment plant has no safety margin.  The Consent allows to increase irrigation from 10 mm/d to 20 mm/d after 2 years operation if it can be shown that all operational targets can be exceeded.  After one irrigation season we are not currently in a position to confirm that 10 mm/d can be sustainably exceeded.  The Council is required by the consent to undertake a technical review of options to further reduce discharges to the river.

The range of options to utilise the M Zone and reduce the potential irrigation area shortfall include  Do nothing  Increase height of M1 to M3  Import fill to raise height of M4 to M10  A wetland treatment system in M4 to M10  Infiltration basin system in M4 to M10  Install cut-off drain to existing design  Design new cut-off drains  Open swales to capture groundwater  Spray irrigation of M1 to M3  Abandon M4 to M10

A range of further options to address the potential irrigation area shortfall include  Do nothing  Extend irrigation onto adjacent Council land  Purchase additional land for irrigation  Construct a tertiary treatment plant to supply Fonterra standard water to Council dairy farm  Extend drip irrigation around the site  Ground water pumping  Pipeline under river to supply irrigation water to adjacent farm

Recommendation Complete M1 to M3(giving a design factor of safety of 15%), then adopt one of the following four options:  Do nothing  Construct a wetland  Extend the border strip irrigation system to the Homebush dairy farm  Install a tertiary treatment plant to produce irrigation water that meets Fonterra standards

The way forward  Start negotiations with Hoppers regarding completing M1 to M3. A decision to proceed will be subject to the outcome of these negotiations.  Initiate discussions with GWRC regarding additional options and consent variation requirements.  Begin the process to evaluate the options to address the irrigation shortfall in conjunction with the affected parties.

The way forward - Programme  Complete construction of irrigation areas that can be constructed – This summer.  Option evaluation - data collection/treatment trials – Underway.  Option evaluation – Workshop with affected parties – proposed around March.

Queries and Concerns During Construction  All queries or concerns should be directed to MDC.  Calls/contact are logged and directed to Ian Steer.  Ian discusses/actions with the appropriate parties.  Action is taken as appropriate, the call closed off and contact made with the person who contacted MDC.