Clean room administrative committee Meeting TUMS Murthy Jan 29 , 2013

Slides:



Advertisements
Similar presentations
Health & Safety Induction Health & Safety e-learning: Health & Safety Induction Course.
Advertisements

Dry Etch and Thin films & Process Integration Jan 6th, 2015 NNfC monthly admin committee meeting.
Monthly Management Report November Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Cleanroom committee neeting Jan 2014 Vijayaraghavan.
Dr Bob Hardwick, Leisure Energy Ltd
1 THAI TOKO ENGINEERING CO.,LTD. Safety management procedure.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy July 30, 2013 Clean room administrative committee.
Understanding the management of risks to health and safety on the premises of a retail business Unit 352.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy July 1, 2014 Cleanroom administrative committee.
INDUSTRIAL & SYSTEMS ENGINEERING
Low Carbon Action Group results. The nature of our business means a large amount of energy needs to be used, but we are looking to compensate that with.
Corrective and Preventive Maintenance at NSCL. Outline Introduction to NSCL & MSU Quality Management at NSCL Tools used at NSCL for availability Future.
EnvironmentalSafety 2.01 Understand safety procedures 1.
Retirement Home Regulated under the Retirement Home Act, 2010.
Fire Protection John Giefer. Statistics In the Drilling Industry In the Drilling Industry 25% of all inspections found violations of (21 inspections.
MC Strategies 2008 Administrator Roundtable Compliance Reporting September 26, 2008.
Micro and Nano Characterization Facility
Getting Green Building Automation. Why is Building Automation a Green Technology? There are programs starting all over the nation that focus on alternative.
BUILD WITH US. ™ Contractors
Basics of Good Documentation Document Control Systems
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Prabhakara Rao Jan 6, 2015 Cleanroom Admin Committee Meeting.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Oct 28, 2014 Cleanroom Admin Committee Meeting.
NATIONAL NANOFABRICATION CENTRE CLEAN ROOM COMMITTEE MEETING TUMS Murthy 26 July 2011.
Copyright © 2004, Cabinet NG Inc. All Rights Reserved The only automated filing solution that begins filing as you begin typing An Introduction to…
Nursing Assistant Monthly Copyright © 2011 Delmar, Cengage Learning. All rights reserved. Fire Prevention and Preparedness: The CNA’s Role November 2011.
Dailies, Weeklies, Monthlies, PSM Maintenance - Simplify IT If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Cleanroom Admin Committee Meeting Prabhakara Rao April 28,
TOOL MANAGEMENT INTRODUCTION
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Arun Kumar Menon Oct 7, 2014 Cleanroom Admin Committee Meeting.
A centre of expertise in digital information managementwww.ukoln.ac.uk QA And The IWMW Web Site: A Case Study (flaws and all) Brian Kelly UKOLN University.
G041: Lecture 07 Business ICT Systems Mr C Johnston ICT Teacher
Document Control Basics of Good Documentation and
Monthly Management Report january Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Monthly Management Report May Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
Sl.NoItemOwnerStatus 1a. To get the cost estimate of having a centralized compressor for all the labs at CeNSE. b. Estimate the cost of running a new pipeline.
HE UTTAR PRADESH FIRE PREVENTION AND FIRE SAFETY RULES 2005
Monthly Management Report October Submitted By Facility Management Team 1 Monthly Report-(Jul 2011)
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Dec 2, 2013 Cleanroom administrative committee.
Dry Etch and Thin films & Process Integration April 28th, 2015 NNfC monthly admin committee meeting.
5.1 Student Book © 2005 Propane Education & Research Council 5.1 Designing & Installing Dispenser Transfer Systems.
ASSURANCE PINNACOL ASSURANCE Wants you to know about : EMERGENCY/DISASTER PREPAREDNESS.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy 28 May 2014 Cleanroom administrative committee.
NATIONAL NANOFABRICATION CENTRE CLEANROOM ADMINISTRATIVE COMMITTEE MEETING TUMS Murthy 27 Mar 2012.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
E.Soundararajan R.Baskaran & M.Sai Baba Indira Gandhi Centre for Atomic Research, Kalpakkam.
Micro and Nano Characterization Facility Girish Kunte June 10 th 2013.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 27, 2013 Clean room administrative committee.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Sept 25, 2013 Clean room administrative committee.
T Iteration Demo METAXA PP Iteration 17 November November November 2015.
Cctv Management Solution - CMS From – Intelitech Solutions Pvt. Limited. [ ITSPL Group ]
Brentwood of Palatine Condominium Board Meeting Treasurer’s Report – Cash Position – Delinquencies Rules & Regulations Laundry Natural Gas Elliot.
Micro and Nano Characterization Facility Girish Kunte July 1 st 2014.
Micro and Nano Characterization Facility Girish Kunte October 28 th 2014.
Monthly Management Report March By Facility management Team National nanofabrication centre Indian Institute of Science Bangalore.
Responsible Care® Basic Awareness 1. DISCUSSION POINTS 2 WHAT IS RESPONSIBLE CARE®? HOW DOES RESPONSIBLE CARE® ADD VALUE? WHAT CAN YOU DO TO SUPPORT RESPONSIBLE.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Aug 26, 2014 Cleanroom Admin Committee Meeting.
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy 25 Feb 2014 Cleanroom administrative committee.
BY: Winston G. Smith Environmental Engineer UST/PCB & OPA Enforcement & Compliance Section EPA Region 4.
Micro and Nano Characterization Facility Girish Kunte May 28 th 2014.
ASPEC January 2015 Incidents –0 incidents, 0 near misses Hours 27/12/14-30/01/15 13% Site, 1% Travel, 86% Office ASPEC QSHR January 2015 Minutes.
ASPEC August 2015 Incidents –0 incidents, 0 near misses Hours 01/08/15-28/08/15 14% Site, 0.6% Travel, 85% Office.
FDA Preventive Control Regulation Ernest Julian, Ph.D., Chief Office of Food Protection RI Department of Health AFDO 2014.
ASPEC December 2015 Incidents –0 incidents, 0 near misses Hours 28/11/15-25/12/15 12% Site, 0.5% Travel, 78% Office.
CORES Software User Training WVU Shared Research Facilities 2014 SRF CORES USER TRAINING
Micronova Nanofabrication Centre 1 PESO MANUAL Version
National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India TUMS Murthy Jan 8, 2013 Clean room administrative committee.
ASPEC July 2015 Incidents –1 incidents, 0 near misses Hours 27/06/15-31/07/15 12% Site, 0.5% Travel, 87% Office ASPEC QSHR July 2015 Minutes.
Woodland Public Schools
Managing the development of information systems (Part 1)
Solving Two-Step Equations
Presentation transcript:

National Nanofabrication Centre Centre for Nano Science and Engineering IISc, Bangalore, India Clean room administrative committee Meeting TUMS Murthy Jan 29 , 2013 TUMS Murthy Cleanroom Admin Commitee Meeting

Cleanroom Admin Commitee Meeting Action Points Sl.No Item Owner Status 1 a. To invite Chandrasekhar for the fire drill at CeNSE and seek his help for demonstrating fire fighting equipments b. To check with the original manufacturer of the sensors for the exact cost. c. To provide a statistics on the annual downtime for cleanroom Dr TUMS Murthy Done 2 All the alarms installed to be checked on Friday 11th Jan 2013 with the help of third party Mr.Adinarayana Murthy 3 To solve the issue for Tecport sputter 2 Dr.Vijayaraghavan/Prof Anilkumar 4 a. To include Anelva RF sputtering usage statistics also. b. To include a slide about the industry users using the cleanroom c. To provide a report on the Oxford workshop held at CeNSE Dr.Vijayaraghavan 5 a. To include EVG bonder usage statistics also. b. To provide a report on the Lithography workshop held at CeNSE c. To check if litho wet benches can be delivered by next week. d. To update the trend charts with the latest data. Dr.Gopal Hegde a. Done b. Done c. To be supplied next week. Invoice received. d. Being Done TUMS Murthy Cleanroom Admin Commitee Meeting

Cleanroom Admin Commitee Meeting Action Points Sl.No Item Owner Status 6 To make a database of the industry users using our facilities at CeNSE Dr.Sanjiv Shrivastava Done along with Dr.Girish Kunte 7 To correct the number of hits on twiki page Sreelekshmy Ongoing. Alternate solution: Another plugin for Usage statistics available. In the process of installing it. 8 a. To add a poster with the list of names of industries that has been using the facility b. To provide an update on the income from industry users and to give a projection on the expected usage for next year. Dr.Girish Kunte a. b. Done TUMS Murthy Cleanroom Admin Commitee Meeting

Cleanroom Admin Commitee Meeting Operations Issue of training new users raised by Profs. Ambarish and Manoj Varma Training slots are being reserved for equipment having high demand New users encouraged to observe operation of equipment outside their slots Independent users not allowed to book more than a specified number of slots during normal shift Manual control, feature not automated TUMS Murthy Cleanroom Admin Commitee Meeting

Cleanroom Admin Commitee Meeting Operations Clean room AMC implementation has started PCW line in the clean room showing signs of rusting at welded joints on the outside. Nano Clean ( Madhu & Co) asked to come up with solutions Proposal for passivation and biocidal treatment of PCW line has been requested from NALCO, a well know company of water treatment and distribution. TUMS Murthy Cleanroom Admin Commitee Meeting

Cleanroom Admin Commitee Meeting Fire Drill Fire safety and Evacuation exercise was conducted on 24th Jan. Lessons learnt PA systems of Cleanroom and Nano building need linking Alarm as well as announcements were not audible in many places Safety sweep of the building involved more than 10 people. Need strategy to tackle emergencies at night External agencies’ involvement to be worked out Fire fighting ring is yet to be handed over to institute (CCMD ??) TUMS Murthy Cleanroom Admin Commitee Meeting

Cleanroom Admin Commitee Meeting Other issues Previous proposal for Medical Insurance to NNfC, MNCF and other project employees not approved. What next ?? TUMS Murthy Cleanroom Admin Commitee Meeting

Cleanroom Admin Commitee Meeting Nitrogen Consumption Current status Liquid N2 consumption = 1129 litres/day . Equivalent Gas 800 m3 /day Used as Liquid N2 = 20 litres/day ( ~ 14 m3/day) Estimated usage by equipment = 700 m3/day ( To be validated) Unaccounted 100 m3/day, equal to 140 litres/day TUMS Murthy Cleanroom Admin Commitee Meeting

Cleanroom Admin Commitee Meeting Nitrogen consumption Total consumption 800 m3/day Major users are Dry etch 60 m3 Diffusion 80 m3 Litho 20 m3 Thin films 45 m3 N2 Guns 25 m3 Gas cabinets 400 m3 Others 70 m3 TUMS Murthy Cleanroom Admin Commitee Meeting

Cleanroom Admin Commitee Meeting Nitrogen consumption Gas Cabinet consumption has to be reduced or eliminated Reduced gas cabinet flow to 30 liters/min from 40 Saving 100 m3/day = 140 litres/day (verified) Change alarm setting to reduce the flow further as a first step Replace Nitrogen with CDA as a next step. TUMS Murthy Cleanroom Admin Commitee Meeting