FUTURE NTDC PROJECTS UPTO

Slides:



Advertisements
Similar presentations
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
Advertisements

Monthly Progress Report on NTDC Development Projects for May, 2013
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Cool Chain Development in Pakistan. Why Cool Chain ? Around 20-40% of the horticulture produce is wasted in post harvest stage In financial terms, loss.
The Power Grid ELEC 403 The Citadel Mark McKinney.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER Monthly Progress Report on NTDCL Development Projects for September, 2013.
Regional Planning Group Project
NTDC Projects for which Financing is Required
FIELD OF STUDIES continued ENGINEERING AND TECHNOLOGIES 1. Electrical Engineering 2. Electronics Engineering 3. Petroleum Engineering 4. Mechanical Engineering.
SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATED COST (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIO-
Senior Special Assistant on Transmission to the President
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER MONTHLY PROGRESS REPORT on NTDC DEVELOPMENT PROJECTS for January, 2013.
PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS.
Brief on HVDC 2015 Brief on HVDC 2015
SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATE D COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIO-
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
Electrical Systems Electrical Engineering in Railways –Rolling Stock –Communications & Control –Signalling –LV Installations in Stations and Buildings.
Marek Kras. A combined cycle gas turbine power plant, frequently identified by CCGT shortcut, is essentially an electrical power plant in which a gas.
FUTURE NTDC PROJECTS UPTO
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO For The Quarter Ending Dec.2012 PLANNING POWER.
Quarterly Report on NTDC Development Projects
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
TRANSMISSION SYSTEM KERALA K ASOKAN DIRECTOR INSTITUTE FOR SUSTAINABLE DEVELOPMENT AND ENERGY STUDIES (InSDES)
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 GEPCO 2 nd WORKSHOP ON POWER SECTOR REFORMS November 11 & 12, 2010.
NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012.
JSC “Moscow United Electric Grid Company” (JSC “MOESK”) Operating activity’s results for the first half year of 2010.
Preliminary Studies of the Electric Power Distribution for CLIC
ELG4125 Transmission and Distribution Systems
Pakistan Italy Debt for Development Swap (PIDSA) Italian-Pakistani Development Cooperation.
APPLIED ELECTRICITY SS3
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
Paint Your Districts Prepared by: Information Management Unit FAO, Pakistan Contact for more information: 1.To edit the districts with.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
N.A. ZUBERI MANAGING DIRECTOR PRIVATE POWER & INFRASTRUCTURE BOARD October 22, 2011 “CONVERSION OF EXISTING THERMAL POWER PLANTS TO COAL” INTERNATIONAL.
Financial Management for Senior Public Sector Officials Group 4 Final Course Project Preparation on PESCO (Sub-Project) Energy Loss Reduction Presenters:
Should Pakistan leapfrog the developed world in broadband? Rizwan Tiwana Chief Technical Officer Wateen Telecom International Networking and Communications.
Khoo Yihan | Chua Cong Yang | Park Seong Jin.  Electricity is generated in power stations at 11000V to 33000V and then stepped up to V by transformers.
Sterlite Grid Limited Committed to the nation's mission to provide quality power for all.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO For The Quarter Ending March, 2013 PLANNING POWER.
National Integrated Power Project Update Presentation to the Presidential Power Sector Workshop on May Niger Delta Power Holding Company Limited.
The following data was collected from a business that sells telephone systems. The bar graph shows the number of phone systems sold, in thousands, during.
A PRESENTATION On 400KV GSS SURPURA JODHPUR
Performance of the Integrated National Electrification Programme as at 30 June 2008 (4 rd Quarter) Presentation to the Select Committee on Finance 14 August.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
GCSE Science A Physics 1 Transmission of Electricity Learning Outcomes Understand the need for an electrical distribution system Describe the national.
SEMINAR ON ENERGY: ELECTRICITY TRANSMISSION A presentation to the KENYA – SPAIN MULTILATERAL PARTNERSHIP MEETING By Dr. (Eng.) John M. Mativo Chief Manager.
Public Tender for Comprehensive Project to award GTS Project in concession “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE (circuit two)” GTS: Guaranteed.
BANGALORE TRANSMISSION PLANNING
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER DEPARTMENT MONTHLY REPORT ON NTDC DEVELOPMENT PROJECTS PLANNING POWER May, 2012.
NTDC ONGOING DEVELOPMENT PROJECT SR. NO. NAME OF SUBSTATIONS TRANSFORMER CAPACITY (MVA) ASSOCIATED TRANSMISSION LINES EXPECTED COMMISSIONING 1 Ext. at.
URBAN POLICY AND GOVERANCE AND INTITUITIONS Parvez Latif Qureshi 1.
Grid maintenance expenses Commerce Commission Workshop 2 March 2010.
China-Pakistan Economic Corridor (CPEC)
Potential of Uzbekistan’s energy system and proposals for cooperation development with Korean companies STATE JOINT STOCK COMPANY «UZBEKENERGO» uzenergy.uzpak.uz.
High Temperature Superconducting (HTS) Cable Project
“AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE
PROJECTS IN THE PIPELINE IN SOUTHERN REGION
Design of Electric Power Systems and Utilities
A Distribution Network
RPC SYSTEM LAYOUT and DIMENSIONS
Exercise Session 2 Power systems.
BRIEFING ON THE INTERCONNECTION LINES OF THE
Presentation transcript:

FUTURE NTDC PROJECTS UPTO 2015-16 NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO 2015-16 PLANNING POWER July, 2012

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP 1

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED NTDC Future Projects Where Financing Has Been Lined Up Sr. No. Name of the Projects Scope of work Estimated Cost Financing Expected Completion (MRS) MUS ($) 1- 2nd Source of supply to 220 kV GIS Islamabad University. In/out of 220 kV Manshera-Sangjani S/C at Islamabad University (40 km) 1225 13 ADB Tranche- IV 2014-15 2- 2nd Source of supply to 220 kV Hala Road Grid Station 220 kV D/C T/L from T.M Khan Road to Hala Road (30 km) 940 10 3- 220 kV Chakdara 2x250 MVA T/Fs 220 kV Chakdara – Mardan double circuit T/L (85 km) 3572 38 4- 220 kV Mirpur Khas 220 kV D/C T/L from Hala Rd. to T.M.Khan . (10 km) In/Out of one circuit of above 220 kV proposed T/L at Mirpur Khas (70 km). 3290 35 Total 9024 96 PLANNING POWER

NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED 3

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED NTDC Future Projects For Which Financing Is Required Sr. No. Name Of New Substations T/F Cap. (MVA) Associated Transmission Lines Estimated Cost Expected Completion (MRS) MUS ($) 1- 220 kV Chakwal 2x160 In/out of 220 kV Mangla-Rewat S/C at Chakwal (65 km) 3196 34 2014-15 2- 220 kV Gharo 2x250 220 kV Gharo – T.M Khan Road double circuit T/L (130 km) 5078 54 3- 220 kV Jhimpir In/Out of 220 kV Gharo – T.M Khan Road at Jhimpir (65 km) 3572 38 4- 220 kV Mastung 220 KV Mastung - Sibbi double circuit T/L (120 km) 4512 48 5- 220 kV GIS Shadman 220 kV D/C cable from Shadman to Bund Road (30 km) 4700 50 6- Additional source of supply for 220 kV Burhan - 220 kV Tarbela – Burhan D/C T/L on Rail conductor (35 km) 940 10 PLANNING POWER

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED NTDC Future Projects For Which Financing Is Required Sr. No. Name Of New Substations T/F Cap. (MVA) Associated Transmission Lines Estimated Cost Expected Completion (MRS) MUS ($) 7- - Re-conductoring of 220 kV Tarbela ISPR on Rail conductor (62.5 km) 1316 14 2014-15 8- 500 kV Islamabad New 2x750 2x250 In/Out of 500 kV Tarbela – Rewat S/C at Islamabad New (40 km) In/Out of 500 kV G/Barotha–Rewat S/C at Islamabad New (50 km)  In/out of 220 kV Tarbela – ISPR S/C at Islamabad New (25 km). In/out of 220 kV Mansehra – ISPR D/C at Islamabad New (5+5 km). 220 kV D/C T/L from Islamabad New to ISPR (15 km) 11280 120 2015-16 PLANNING POWER

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED NTDC Future Projects For Which Financing Is Required Sr. No. Name Of New Substations T/F Cap. (MVA) Associated Transmission Lines Estimated Cost Expected Completion (MRS) MUS ($) 9- 500 kV Faisalabad West 2x750 In/Out of 500 kV M/Garh – Gatti S/C at Faisalabad West (2 km) In/Out of 500 kV Multan - Gatti S/C at Faisalabad West (20 km) 11750 125 2015-16 2x250 220 kV D/C T/L from Faisalabad West to T.T Singh (70 km). 220 kV D/C T/L from Faisalabad West to Lalian / (M3) (100 km). 10- 220 kV M-3 Industrial Estate Faisalabad 220 kV M3 Industrial Estate – Faisalabad New (70 km) In/Out of 220 kV Faisalabad West - M3 Industrial Estate at 220 kV Chinot Industrial (30 km) 3948 42 PLANNING POWER

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED NTDC Future Projects For Which Financing Is Required Sr. No. Name Of New Substations T/F Cap. (MVA) Associated Transmission Lines Estimated Cost Expected Commissioning (MRS) MUS ($) 11- 220 kV Jamrud 2x250 220 kV Jamrud – Sh. Muhammadi (10 km) 1596 17 2015-16 12- 500 kV Peshawar New 2x750 In/out of Tarbela – Sh. Muhammadi at Peshawar New (2+2 km) In/Out of 220 kV Sh. Muhammadi-Shahibagh at Peshawar New (5 km) 6016 64 13- 220 kV Kohat 220 kV Kohat – Peshawar New double circuit T/L (50 km) 220 kV Kohat – Bannu double circuit T/L (150 km) 6580 70 Total 64484 686 PLANNING POWER

NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED Report Prepared by: Designation Contact No. Maqsood Ahmad Qureshi Manager Projects Planning 0347-4447720 042-99202609 Fahmeeda Shafi Dy. Manager Projects Planning 042- 99202609 PLANNING POWER 8