1 DDC Datalogger Remote Telemetry/Monitoring and Web Interface.

Slides:



Advertisements
Similar presentations
How to Use the Water Quality Results Viewer Application Kentucky Division of Mine Permits Watershed Characterization Data.
Advertisements

Excel Vocabulary.
SmartView Work Organiser. SmartView – Work Organiser Developed in conjunction with leading Dealer Groups.
Getting started. Login procedure URL: User name: the initial of your first name plus your surname Password:
Updating the Ohio Educational Directory. Log in to OEDS by clicking on the Sign In button in the upper left corner of any ODE Web page (
SL-10 Laboratory Hot Tack / Seal Tester TMI Group of Companies TMI Group of Companies.
AIMSweb Progress Monitor Online User Training
Intelligent Integration Ambulatory Blood Pressure
Individual Graphs in Excel. Go to Intranet/Interventions/ CICO T2 Put in time frame and click boxes “Has CICO Record” and “Report Mode.”
How to View User Counts on Sharp Copiers with Account Controls Enabled.
Home Page The presentation will dissect each section of the Home Page.
August 2014 Liver quest User Demo: Liver Quality Enhancement Service Tool (QuEST)
Microsoft Excel. What is Microsoft Excel? Spreadsheet program that allows users to organize data, complete calculations, make decisions, and graph data.
eBilling Training Invoicing
Educational Measurement and School Accountability Directorate Better informed, better positioned, better outcomes.
X-Call Version 2.0 user guide A manual to explain how to identify arrived patients and call into a preferred location. A manual to explain.
TRACK 2™ Version 5 The ultimate process management software.
Introduction to Excel 2007 Part 2: Bar Graphs and Histograms February 5, 2008.
Click on File - > Open. Click on Database Click on “Open”
Using Excel for Data Analysis in CHM 161 Monique Wilhelm.
Note: Be sure you have already selected your time and station before choosing this product. Downloading Raw Data 1.Select AWN Raw Data 2.Select 15 min,
Mary K. Olson PS Reporting Instance – Query Tool 101.
IStateLink 3.0 Help and Training Tutorial December 2010.
DEMONSTRATION FOR SIGMA DATA ACQUISITION MODULES Tempatron Ltd Data Measurements Division Darwin Close Reading RG2 0TB UK T : +44 (0) F :
Pulsar AnalyzerPlus Making noise measurement reporting easier.
American Control Technologies,Inc Power Factor Correction Technology 1152 West 2400 South Suite ‘C’ Salt Lake City, Utah
GML-3 GPRS BASED METER AND LOGGER THREE PHASE METER WITH INBUILT DATA LOGGER © Embuilt Technologies Visit us at Or For.
1 iSee Player Tutorial Using the Forest Biomass Accumulation Model as an Example ( Tutorial Developed by: (
ATTACHMENT C Photographic Report. Photo 1 - Influent Pipe to Wastewater Treatment Plant Photo 3 - Influent Flume for Flow Metering Photo 2 - Chart Recorder.
Graphing Tier2/3 Interventions. Graphing For Whole Group The purpose of whole group graphs is to get a quick picture of who is all in an intervention.
Amicus Point of Sale and Business Management System Fuel module.
Associate ® Typist – Transcription Module Starting Associate Transcription: To start Associate typist module, double click the Associate dictation icon.
IQS Online E-Film Reader Lancaster County Recorder of Deeds Office.
Ranjeet Department of Physics & Astrophysics University of Delhi Working with Origin.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
Student Resource Package Leave Replacement. Presentation Content  Navigation Accessing the Leave Home Page Leave Home Page Panels The Replacements Panel.
EASI a free web database application for collecting and managing monitoring records.
SmartFeeder Run Carbon Copy Create new connection using available modem. Create new Site.
Work with Variables Section 5. Add a variable Click on the top grey portion of the GPA column to highlight the column. At the top left of your screen,
FIX Eye FIX Eye Getting started: The guide EPAM Systems B2BITS.
To complete installation on electronic models run one wash cycle then click the DIP switch setting no.4 to the on position DIP switch settings.
Cumulative Review of Microsoft Word Mrs. Masishin.
How make a scatter graph using Microsoft Excel. Once Excel is Opened: Input the values from the table into Excel. –Don’t forget the labels. It should.
How to graph your stock project performance vs. the 3 major indexes.
Starter! Get Ready to Learn! ClassworkFriday 10th October 2014 Bags under desks No drinks bottles near electrical equipment Log on to the School Computer.
Excel Information. Basics In Excel there are rows, columns and cells. Row- The horizontal lines in the workbook –These are identified by numbers on the.
Software Overview How to… Review Video and Data  Review the Journal Review the Journal  Simple Search Simple Search  Advanced Search Advanced Search.
Intelligent Integration
Dashboard GUI.
Getting started.
Computer Fundamentals
1- Powerpoint will open automatically 2- Open your presentation (File…open…choose your file) 3- Click on the tab called Turningpoint as seen below.
Powertap User Guide.
RB Controls Clocking in and out follow ups inner office messages
ISystems - Automated Trading Platform How it Works and How To Use / Cheat Sheet.
Welcome to the Caterpillar Gas Engine
2016 File Maker pro training for Summer program hiring
Using Excel to Make a Graph
NextGen Utility Billing
Climate Graphs What do they tell us?.
Your Solution for: Energy Smart Management Real Time Power Monitoring Fuel Theft Prevention Technical presentation.
Intelligent Integration Ambulatory Blood Pressure
Microsoft Excel 101.
Digital Chart Recorder Operation
Analysing your pat data
Viewing Documents from PowerChart
Wavewin Sniffer 24 Configuration & Polling Software
RB Controls Clocking in and out follow ups inner office messages
Presentation transcript:

1 DDC Datalogger Remote Telemetry/Monitoring and Web Interface

2 Typical Pumping Station (Pump Hours Run and Starts) Pump 1 Run Time (Hours) Pump 2 Run Time (Hours) Comments – From this graph you can see that the two pumps start and stop sequences. We can also work out the Hours run of the pumps. For one daily period the pump no.1 ran for 20.12Hours and pump no.2 ran for 20.18Hours respectively.

3 Typical Pump Flow Chart for a Water Booster Station (Pump Flow and Starts) Maximum Pump Flow 24.29m3 Average Pump Flow 12.77m3 Total Flow m3 (This Value is based on calculation from the graph) From this graph we can see the outlet flow of the pump and work out the maximum flow and average flow of the pump over a daily period.

4 Typical Water Booster Station (Pump Flow Vs Pump Current) Max Pump Current Amps Pump Hours Run 9.17 Hrs Max Pump Flow m3 From this graph we can see the Pump Current graph against the Pump flow. We can also work out the Maximum current, Pump total hours run and the Maximum pump flow achieved from the pump over a daily period.

5 Pressure Monitoring at a Water Booster Station (Delivery Pressure) Maximum Pump Pressure Minimum Pump Pressure 0.31 Average Pump Pressure From this graph we can see the Pump pressure while the pump is running and the drop off in pressure when the pump stops and see this gradually drop off as the pump remains stopped. We can also work out the Maximum, Minimum and Average Pump Pressure. All the points can be indicated on the graph showing the value and the date/time of the reading along the graph. This can also be enabled or disabled by the customer by clicking on the name at the bottom left of the graph required.

6 Typical Flow Graph showing a high peak value. From this graph we can see the Upstream flow for the plant over a daily period. The maximum flow recorded was at on that day as seen above. All the points can be indicated on the graph showing the value and the date/time of the reading along the graph. This can also be enabled or disabled by the customer by clicking on the name at the bottom left of the graph required.

7 Typical Waste Water Treatment Works (DO Tank Levels) mg/l Average Calculated Dissolved Oxygen Tank mg/l Average Calculated Dissolved Oxygen Tank mg/l Comments – From this graph we can see the DO Tank levels for the plant The Values in the red are the DO levels for Tank No.1 and the values in the Blue are the DO Levels for Tank No.2. As you move across the graph you can see the points individually highlighted. We have also been able to calculate the average DO Levels. Graphs can be enabled or disabled by clicking on the check boxes at the bottom left of the graph. When you enable and disable the graph you wish to view the axis on the left will automatically re-scale itself to give the best possible view.

8 Typical Waste Water Treatment Works (Tank Levels) meters. Maximum Sludge Holding Value 4.05m Minimum Sludge Holding Value 2.51m Maximum RAS WAS Level 3.26m Minimum Ferric Sulphate Level 0.39m From this graph we can see the Sludge Holding Level, Ferric Sulphate Level and the RAS WAS Level for the plant We can also work out maximum and minimum level recorded within the time frame selected. As you can see from this graph the graphs can be individually turned on and off by double clicking the correct symbols on the bottom of the graph. You can also choose to show the point values on the graph by double clicking the name of the graph. As you turn on and off the graphs they will automatically re-scale the graph and rescale the axis to give you the best possible views.

9 Typical Waste Water Treatment Works Raw Data Screens From this screen you can see the raw data for the plant. The data can be highlighted to show customers specific dates and times. The columns can be sized to suit your needs. All this data can be downloaded to an excel file on your computer where you can print the selected data out. You can scroll through dates and times for your specific needs.

10 Power Monitoring Application (Voltage vs. Current Chart) Maximum Voltage Phase A volts Minimum Voltage Phase A volts Maximum Current Phase A amps From this screen you can see the graph for the voltage over a period of time at this pumping station. We can work out the maximum and minimum voltages during this time and also work out the maximum current being consumed from the plant. As you can see from the graph we have zoomed in the values which we can then scroll through the whole time period or click on the show all button to review the whole graph.

11 Power Monitoring Application (Voltage vs. Current Chart) Power and Equipment Data Logger installed to investigate the site specifics in relation to the pump currents, flows and levels.

12 Power Monitoring Application (Voltage Chart) From this screen you can see the graph for the voltage over a period of time. We can select which graphs you wish to see and the axis will automatically scale itself to get the best fit graph. We can pinpoint particular low voltage drops and record them on the graphs.

13 Power Consumption (KWH Chart) From this graph we can see the Real power, Apparent power and the Reactive Power of this installation. This can be useful in determining the wattles power being produced on an installation.

14 For Further Information or a Site Specific Survey Please do not hesitate to contact us. Telephone : Fax :