IE 469 Manufacturing Systems 469 صنع نظم التصنيع III- Assembly Line Tutorial.

Slides:



Advertisements
Similar presentations
MATERIAL STORAGE SYSTEMS Gülşah GEDİK
Advertisements

6/3/2014 IENG 471 Facilities Planning 1 IENG Lecture Schedule Design: The Sequels Sequel.
SOME OF THE MOST COMMON TESTING MISTAKES MADE BY TECHNICIANS PERFORMING VERIFICATIONS TO CAN/ULC The reason I know some of them is because I have.
Unit 2 Manufacturing Operations Sections: 1.Manufacturing Industries and Products 2.Manufacturing Operations 3.Production Facilities 4.Product/Production.
Line Balancing Problem A B C 4.1mins D 1.7mins E 2.7 mins F 3.3 mins G 2.6 mins 2.2 mins 3.4 mins.
1 Slide Process Analysis Fundamentals MGT Slide Process Definition  A process is a collection of operations connected by a flow of transactions.
Senior Design I Peer Review January 20 th, 2006 PO6208 – ARC Works Sports Bottle Sponsor: ARC Works of Monroe County Team Members: Team Leader George Gooch,
DRIP DISPERSAL SYSTEMS Problems and Solutions Presented by Keith Surface.
InnoSys Process Sequence. End Effector Components End Effector Prox Switch Load Cell Wire Conduit Crows Foot Nut Runner.
Part IV MANUFACTURING SYSTEMS
5/3/2015New Challenges for Indian Coals1 A n Experience of Third Party Sampling of Coal A. Choudhury, Kalyan Sen C.F.R.I, Dhanbad (India)
Automatic Part Feeder for Bishop Steering Technology Joel Gray Dan Howk Jessica Rodgers May 4, 2004.
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
Two-Stage Paced Lines Active Learning – Module 2 Dr. Cesar Malave Texas A & M University.
Introduction to Transfer Lines Active Learning – Module 1
Lecture 7: PLC: Review Questions
©2008 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected under all copyright laws as they currently exist.
CHAPTER 6 Statistical Analysis of Experimental Data
Problem 8.4 K = ∞ R i = 60/4 = 15 /hr T p = 3 min = 0.05 hour c= 1 R p = c/Tp = 20 /hour Both Ti and Tp exponential Server $20 /hr Phone $5/hr Wait cost.
Automated Production Lines
Little´s law Skorkovský ,KPH,ESF.MU
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
Principles of Paving rev Principles of Paving.
MNG221- Management Science –
ROBOT APPLICATIONS.
Assembly Line Balance Balance.
Operational Research & ManagementOperations Scheduling Flow Shop Scheduling 1.Flexible Flow Shop 2.Flexible Assembly Systems (unpaced) 3.Paced Assembly.
Dr. Cesar Malave Texas A & M University
INSY 3021 Auburn University Spring 2008 Performance Rating.
1 STAT 500 – Statistics for Managers STAT 500 Statistics for Managers.
Chapter 4 Process Design.
COMT 3911 Satellite Basics COMT 391 Wireless. COMT 3912 Satellite Components Satellite Subsystems –Telemetry, Tracking, and Control –Electrical Power.
Managing Processes and Capabilities CHAPTER THREE.
Mistake-proofing Methods
Ch9. Inferences Concerning Proportions. Outline Estimation of Proportions Hypothesis concerning one Proportion Hypothesis concerning several proportions.
Assembly Line Balancing
IE 469 Manufacturing Systems 469 صنع نظم التصنيع II - Modeling Systems Tutorial.
IE 469 Manufacturing Systems 469 صنع نظم التصنيع I- Performance Measure Tutorial.
Mechanization of Parts Handling. Parts Feeding Fabricated parts must be transported, selected, oriented properly, and positioned for assembly.
COSTING AND THE VALUE CHAIN CHAPTER 18 PAGE# 794 Faisal
Assignment Capacity. 2 Ardavan Asef-Vaziri March, 2015Capacity- Basics MamossaAssaf Inc. fabricates garage doors. Roofs are punched in a roof punching.
Introduction to OEE (Overall Equipment Effectiveness)
Question 1 A.What are the types of flow line analyses? And why breakdown analysis is important? B.A two-week study is performed on a 10-stations transfer.
Automated flow line Meghana.
P11008 ArcWorks Straw Cutting Device May 13, 2011 Ian Balbresky-ME/Pneumatics Lead Tyler Banta-ME/Design Lead Matthew Estock-ISE/Project Manager Mark Vaughn-ME/Fabrication.
Ch 17 Automated Assembly Systems
Supply Chain Customer Order Decoupling Point
Quick Changeover Single Minute Exchange of Dies
Motorola Solutions Internal Information
Performance Metrics of Manual Assembly Line
Reviewing and Practicing the Energy Math Tuesday, December 13th, 2016
Energy and Power for APES
Ch 17 Automated Assembly Systems
The Impact of Variability on Process Performance
IV-2 Manufacturing Systems modeling
3 Assembly Line Balancing CHAPTER Arranged by
IENG 217 Cost Estimating for Engineers
Process Flow For Electronic Component Prep
MANUFACTURING SYSTEMS
Assignment Capacity The recorded solution to the first problem is available at
OVERALL EQUIPMENT EFFECTIVENESS (O E E)
Energy and Power for APES
Flexible Assembly Systems
Chapter 5: Active Filters
Preliminary Detailed Design Review
Model 4-2: The Enhanced Electronic Assembly and Test System
Model 4-2: The Enhanced Electronic Assembly and Test System
LEAN Principles Total Productive Maintenance (TPM)
Ian Falu Prety Widjaja IE-642
Fluid Power System Electrical Control
Presentation transcript:

IE 469 Manufacturing Systems 469 صنع نظم التصنيع III- Assembly Line Tutorial

Problem #1 Question 1 A feeder-selector device at one of the stations of an automatic assembly machine has a feed rate f=25 parts/min and provide a throughput of one par in four (θ =0.25). The idea cycle time of the assembly machine is 10 seconds. The low level sensor on the feed rack is set at 10 parts, and the high level sensor is set at 20 parts. a) How long will take for the supply of parts to be depleted from higher level sensor to lower level sensor once the feeder selector device is turned off? b) How long will take for the parts to be resupply from low level sensor to higher level sensor once the feeder selector device is turned on? c) What proportion of the time that the assembly machine is operating will the feeder- selector devise be turned on? And Turned off? d) For the feed rate of the machine is f=32 parts/min, recalculate a,b,c. what is your comment?

Solution when feed rate f=25 parts/min a) Time to deplete from n f2 to n f1 rate of depletion = cycle rate Rc = 60/10 = 6 parts/min Time to deplate = (20-10)/6 =1.667 min b) Time to resupply from n f1 to n f2 rate of resupply = fθ - Rc =25(0.25) - (60/10) = 0.25 parts/min Time to resupply = (20-10)/0.25 =40 min c) Total cycle of depletion and resupply = ( ) = min proportion of time feeder-selector is on = 40/ = 0.96 proportion of time feeder-selector is off = 1.667/ = 0.04 Problem #1 Solution

Solution when feed rate f=32 parts/min a) Time to deplete from n f2 to n f1 rate of depletion = cycle rate Rc = 60/10 = 6 parts/min Time to deplate = (20-10)/6 =1.667 min b) Time to resupply from n f1 to n f2 rate of resupply = fθ - Rc =32(0.25) - (60/10) = 2 parts/min Time to resupply = (20-10)/2 =5 min c) Total cycle of depletion and resupply = ( ) = min proportion of time feeder-selector is on = 5/6.667 = 0.75 proportion of time feeder-selector is off = 1.667/6.667 = 0.25 Comment the turning rate of feed selector to the cycle rate of the assembly machine is important.

Problem #2 Question 2 A synchronous assembly machine has 8 stations at a rate 400 completed assemblies per hour. average downtime per is 2.5 minute. When a breakdown occurs all subsystems (including the feeder) stop. The frequency of breakdowns of the machine is once every 50 parts. one of the eight stations is an automatic assembly operation that uses a feeder- selector. The components fed into the selector can have any of five possible orientations, each with equal probability, but only one of which is correct for passage into the feed track to the assembly workload. Parts rejected by the selector are fed back into the hopper. What minimum rate must the feeder deliver components to the selector during system uptime in order to keep up with the assembly machine?

Solution Tp= 60/400 = 0.15 min/assem. Tp =Tc +F*Td = Tc + (1/50)*2.5 =Tc Tc= = 0.1 min/assem. Rc= (1/Tc) = (1/0.1) =10 assem/min Min fθ =0.2 f =Tc = 10 Feed rate f = (10/0.2) =50 parts/min. Problem #2 Solution

Problem #3 Question 3 An automated assembly machines has four work stations. the first presents the base part, and the other 3 stations add parts to base. The production data are given Table below. Determine: a) proportion of good product to total product coming off the line b) production rate of good product coming off line c) total number defect of components and Number of assemblies containing defect component given the starting components quantities of 100,000 for each of part (Base, Bracket, Pin, retainer) which are used to stock the assembly line for operation d) total number of final assemblies produced Table (1) StationOperation / partTime, sec.defect rate, qjam rate of defect, m 1Base Bracket Pin Retainer Downtime= 3 min., When a component is jammed,and putting the machine back to work Indexing Time =3 sec., to move from station to station

Problem #3 Solution Solution mq(1-q+mq) SUM Tc =12+3 = 15 sec0.25min Tp=Tc+Σmq*T d =0.49min/cycle a) Acceptable Ass. Yield= P ap = Π (1-q+mq) = 0.98 b) Production Rate, Rp = 60/Tp = assemb./hour Production rate of good product R ap =P ap *Rp = 120 Good ass./hr

c) Number of defective components given a stock quantities Q= are: Number of defect components for Base, Nd = Q*(1-q) =1000def Number of defect components for Bracket, Nd = Q*(1-q) =2000def Number of defect components for Pin, Nd = Q*(1-q) =3000def Number of defect components for Retainer,Nd = Q*(1-q) =4000def Hence the number of assemblies containing defect components are: Number of assemblies containing Base defect = Nd*(1-m)=0 Number of assemblies containing Bracket defect = Nd*(1-m)=0 Number of assemblies containing Pin defect = Nd*(1-m)=0 Number of assemblies containing Retainer defect = Nd*(1-m)=2000 d) the total number of assembly produced=100,000*P ap = Assemblies Number of good product = Total number produced - Number of parts produced containing defect part = 96000Assemblies Problem #3 Solution

Question 4 A six station dial indexing machine performs four assembly operations. The base is loaded manually at the station 1; the final product is unloaded at the station 6; and a component is attached to base at stations 2 to 5. The components are delivered by a hopper feeder to selector device for proper orientation. The system is designed with operating parameter given in the table below :- StationAssembly Time, Sec. Feed Rate, f /min.Selector, θdefect rate, qjam rate of defect, m Indexing time from station to station, Sec2 When a component is jammed, it takes an average 2 min to release and start the system. The mechanical and electrical assembly machine failure is not significant and can be neglected. It is found that the system produces assemblies far below the designed average production rate. Analyze the problem, stating any assumption to determine the following:- a) What is the designed average production rate? b) What is the proportion of assemblies coming off the system that contain one or more defective component? c) What seems to be the problems that limit the assembly system from achieving the expected production rate? d) What is the actual production rate? Problem #4

Solution Td = 2 min, Tc =7+2 = 9 sec. = 0.15 min Cycle rate, Rc = 1/0.15 = cycle/min (a) Σ(mq) = 1(0.01) + 0.6(0.005) + 1(0.02) + 0.6(0.01) = 0.04 Tp = Td + Σ(mq) * Td = * 2 = 0.23 min Rp = 60/Tp = 60/0.23 = assemblies/hr (b) Pap =Σ(1-q+mq) = ( * 0.01) + ( * 0.005) + ( * 0.02) + ( * 0.01) = 1 * * 1 * = Pqp = 1 - Rap = Rap = Rp * Pap = * = good assemblies/hr Problem #4 Solution

(d) if the machine operates at the cycle rate that is consistent with the feed rate of station 4, then: Tc = 15 sec = 0.25 min Tp = * 2 = 0.33 min Rp = 60/0.33 = assemblies/hr Rap = * = good assemblies/hr (c) Station 1: f θ = 32 (0.25) = 8 components/min Station 2: f θ = 20 (0.50) = 10 components/min Station 3: f θ = 20 (0.20) = 4 components/min Station 4: f θ = 15 (1.00) = 15 components/min the problem is that the feeder for station 3 is slower than machines cycle rate of cycles/min.