IP-20 Review of the Effectiveness of Branching UPRs from PACOTS Track 2 Electronic Navigation Research Institute The IPACG meeting 40, Sep. 2014, Washington.

Slides:



Advertisements
Similar presentations
MINIMUM NAVIGATION PERFORMANCE SPECIFICATION AIRSPACE (MNPS)
Advertisements

An Airline Perspective Prepared by Capt. Ian Varcoe, Air New Zealand.
Presented to: By: Date: Federal Aviation Administration Air Traffic Management (ATM) Issues 30 Nautical Mile (NM) Lateral / Longitudinal Distance-based.
Presented to: REACT Workshop By: Jay Merkle Date:25 June 2008 Federal Aviation Administration High Density Airport Time- based RNAV/RNP NextGen/JPDO Demonstrations.
#4407. When may ATC request a detailed report of an emergency even though a rule has not been violated? A- When priority has been given. B- Anytime an.
Federal Aviation Administration Presented To: IPACG/39 Presented By: Dennis Addison, FAA Date: February 5-6, 2014 WP02: Timing Errors in Oakland OCA.
Federal Aviation Administration The Benefits and Challenges of Implementing Performance Based Navigation (PBN) Instrument Flight Procedures By: Presented.
Emergence of Regional Jets and the Implications on Air Traffic Management Aleksandra Mozdzanowska and R. John Hansman Massachusetts Institute of Technology.
Instrument Ground Training Module 4 & 5
Estimating Requirements and Costs of 4D ATM in High Density Terminal Areas Gunnar Schwoch DLR Institute of Flight Guidance Braunschweig, Germany ICNS 2012.
Agenda Item 5: Air Traffic Management (ATM) Issues WP- 06: Staged Implementation of an Unrestricted UPR Zone within Oakland Airspace (Presented by IATA)
Analysis of ATC Communication messages Relevant to Altitude Change Requests Electronic Navigation Research Institute IPACG/39, 5-6 February 2014, Fukuoka,
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop Benefit Appraisal for Oceanic Applications Dr T E Johnson, BAE Systems
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
USING PBN in UPR APPLICATION, SUCCESS and LESSONS LEARNED
Airline PBN Operations & Desired Entry Competency Elizabeth Bjerke University of North Dakota.
IP21 SIMULATION RESULT BY DARP FOR KSFO/KLAX (IPACG/40) ENRI.
Federal Aviation Administration Presented To: IPACG/39 Presented By: Dennis Addison, FAA Date: February 5-6, 2014 IP09: LOST FUEL SAVINGS DUE TO LACK OF.
JCAB and FAA Joint Paper IP/12 UPR and PACOTS Update.
Plan the flight, fly the plan
Global Wind Patterns Science Lesson Objectives ► using scientific theory, describe and explain heat transfer and its consequences in both the atmosphere.
Users’ Perspective of PBN Achieving Improvements Joël Morin Head, ATM Harmonization.
Presented to: By: Date: Federal Aviation Administration Gulf of Mexico 50 NM Lateral Separation – RNAV Routes Project Project Overview ATO Oceanic & Offshore.
1 Canadian Implementation of ADS-B Out Presentation to ASAS TN2 14 April 2008 Jeff Cochrane Manager, CNS Service Design.
Economical factors in aviation Kpt. Ing. Michal BETKA Speaking Refresher for ATCs course
DM 4/4/02 Direct-To Controller Tool FAA/NASA Joint University Program Meeting NASA Ames Research Center April 4-5, 2002 Dave McNally Direct-To Project.
Rob Eagles Director ASIA PACIFIC Safety, Operations & Infrastructure.
MIT ICAT MIT ICAT 1October 17, 2002 Exploring the Envelope of a Modified 3° Decelerating Approach for Noise Abatement Liling Ren & John-Paul Clarke October.
Evaluation of Alternative Methods for Identifying High Collision Concentration Locations Raghavan Srinivasan 1 Craig Lyon 2 Bhagwant Persaud 2 Carol Martell.
© 2011 The MITRE Corporation. All rights reserved. Advisory Vertical Guidance (Advisory VNAV) A Useful and Flexible Safety Enhancement S.V. Massimini,
ASAS FRA OB/T ATM Projects Lufthansa point of view.
Flight Performance System (FPS) Slot Consulting | RSZ INFO.
Presented to: NAS-Wide Simulation Workshop By: Kimberly Noonan, FAA NextGen and Ops Planning Date: January 28, 2010 Federal Aviation Administration NextGen.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
RECITE A PRAYER…(15 SECONDS). ATM TOPIC 1. INTRODUCTION TO AIR TRAFFIC MANAGEMENT,TYPE OF CONTROL AREAS & FLIGHT PLAN 2. AERODROME CONTROL 3. AREA CONTROL.
EUROCONTROL European Organisation for the Safety of Air Navigation.
OPTIONS FOR EMISSION AVIATION INVENTORIES The Spanish Civil Aviation View Copenhagen may-2004 Alfredo Iglesias.
Presented to: By: Date: Federal Aviation Administration ADS-C CDP Climb/Descend Procedure Implementation Project Update IPACG/39 Keith Dutch, FAA 03 –
VOR/DME RNAV AST 241 Chapter 5.
Package: Routes. Routes Describe En route structure Conventional and RNAV Minimum clearance altitudes Usage restrictions EnRouteRoute RouteSegment Flight.
Boundary Detection in Tokenizing Network Application Payload for Anomaly Detection Rachna Vargiya and Philip Chan Department of Computer Sciences Florida.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
Advanced ATC Techniques Procedural Separation
Weight and Balance.
March 26-27, 2003 International Aircraft Systems Fire Protection Working Group Phoenix, Az Inerting of a Scale 747SP Center-Wing Fuel Tank During a Typical.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
Lecture 6: CRUISE PERFORMANCE
Potential Safety Benefits of RNP Approach Procedures
Canadian Search Area Definition (CSAD) Minnesota Wing Air Branch Director Course.
CPWG 16 NAV CANADA Update December 3-6,  Private, non-share capital company  2nd largest ANSP in the world  12 million aircraft movements annually.
Federal Aviation Administration Presented To: IPACG/40 Date: September 8-12, 2014 IP8: Lost Fuel Savings due to lack of RNP4/FANS Equipage.
Chapter 15 Forecasting. Forecasting Methods n Forecasting methods can be classified as qualitative or quantitative. n Such methods are appropriate when.
1 © NOKIA FILENAMs.PPT/ DATE / NN Performance Study of a SMPP Traffic Generator Tool Kai Wu Nokia NMP/MSW Supervisor: professor Jorma Virtamo.
1 International Flight Operations Efficiency Enhancements: Oceanic Navigation and the North Atlantic Track System (NATS) Presented by Frank Ketcham.
Vertical, lateral separations based on time / distance
EMISSIONS OPERATIONAL-MEASURES WORKING GROUP CAEP WG-4 REDUCING FUEL BURN THROUGH IMPROVED OPERATIONAL MEASURES Colloquium on Environmental Aspects of.
Garmin GX55 Visual Search Patterns National Emergency Services Academy Mission Aircrew School (June 2012 Rev D)
Holding Procedures.
Assignment of Cruising Levels
longitudinal separations based on time / distance
An Airline Perspective
Measurement of environmental benefits Saulo Da Silva
BWI Roundtable Presentation
FANS 1/A over Iridium (FOI)
Measurement of environmental benefits Saulo Da Silva
Electronics Offshore Homework Solutions Global Navigation Chapter 8
Christophe Dubach, Timothy M. Jones and Michael F.P. O’Boyle
Oceanic and International Operations
777 Neptune Flight Planning.
ICAO Fuel Estimation Savings Tool (IFSET)
Presentation transcript:

IP-20 Review of the Effectiveness of Branching UPRs from PACOTS Track 2 Electronic Navigation Research Institute The IPACG meeting 40, Sep. 2014, Washington D. C.

Introduction Computer Simulation’s (IPACG38/39) South Branching UPRs from PACOTS Track 2 Trade-off between flight on ideal altitude, and time- of-flight shortening effect The IPACG meeting 40, Sep. 2014, Washington D. C. Effective Course 2 Trade-off A Less Effect in the South Branching Model (50% RNP4 Capability) A Less Effect in the South Branching Model (50% RNP4 Capability) Non-ideal altitude

RNP 4 installation rate -Whole Oceanic ATC Area (Fukuoka FIR) The IPACG meeting 40, Sep. 2014, Washington D. C. 3

RNP 4 installation rate -Flight heading NA (Fukuoka FIR) The IPACG meeting 40, Sep. 2014, Washington D. C. In June of 2014, RNP4 installation rate was 80% in destination to North American flights. 4

UPRs or Random Flights More UPRs or Random flights at Track2 south side than north side 40%~50% non PACOTS for Hawaii 5 The IPACG meeting 40, Sep. 2014, Washington D. C. Average 10%Average 17% Average 46% One week each month, total 28days East bound flights cross FIR BDY between 0700Z~2100Z

Further experiment for IPACG/40 Optimal cruising altitude is assigned by great use of 30/30 separation, Even if there is traffic concentration. PACOTS Track 2 becomes the boundary, the procedure to determine PACOTS Track 2 is important. Further experiment was executed 80% of RNP4 capability Scenario North Branch Track generating process The IPACG meeting 40, Sep. 2014, Washington D. C. Priority Trk3 Priority Trk2 Priority Trk1 Trk1 Trk2 Trk3 Track 1, 2, 3 have a same gatewayThree pattern Track 2 6

Simulation Conditions THREE patterns – Pattern “W1” Priority Track 1 – Pattern “W2” Priority Track 2 – Pattern “W3” Priority Track 3 The IPACG meeting 40, Sep. 2014, Washington D. C. Trk 2 Priority Trk3 Priority Trk2 Priority Trk1 TWO Models – Model N Baseline – Model B Branch Southward and Northward from PACOTS Track flights, 80% of RNP4 PANCKDFWKSEAKSFOKLAX RNP RNAV TOTAL

Results 1 The IPACG meeting 40, Sep. 2014, Washington D. C. When PACOTS Tracks are generated to priority on Track2, good effect balance in flight time and fuel consumption. longer time and more fuel in Model N (Most Cases) Large difference between Model N and Model B in fuel consumption (“W2”, “W3”) 8 Total Flight Time Total Fuel Consumption *Since each flight tracks were created by Minimum Time Track (MTT), shorter flight time not necessarily compare to low fuel consumptions.

Results 2 20%~25% of flights changed their cruising altitude “W1” lowest numbers The most of change width is 1,000feet lower Almost no differences between Model B and Model N The IPACG meeting 40, Sep. 2014, Washington D. C. 9 Change Width(Feet) 2,0001,000-1,000-2,000-3,000-4,000TOTAL W1-B W1-N W2-B W2-N W3-B W3-N Number of Altitude Change and Change Width Altitude change means flights were not able to fly at an ideal altitude.

Results 3 W1W2W3 Destination Altitude Change Flight Time Fuel Consumption Altitude Change Flight Time Fuel Consumption Altitude Change Flight Time Fuel Consumption North Branch , ,874 South Branch ALL* , The IPACG meeting 40, Sep. 2014, Washington D. C. Performance Differences (Model N – Model B) per Flight “ + ” symbolizes altitude change of Model B is higher than that of Model N “ North Branch ” Flights destination to KDFW and KSEA “ South Branch ” Flights destination to KSFO and KLAX South Branch indicates a less benefit same result as previous study North Branch indicates higher benefits Model B have large benefits (dark orange background), even though no difference or high altitude change (“W2” and “W3”) *ALL is a weighted average of the flight number

Traffic Concentration 11 The IPACG meeting 40, Sep. 2014, Washington D. C. ”FREE” ; UPRs without any restrictions Number of combination traffic existing within 35NM and 1,000feet Traffic concentration was occurred, but the effect comes out by the heavy use of 30/30

SUMMARY Totally, any pattern has fuel consumption benefit by branching UPRs, especially North Branch (South Branch has small effect or negative effect) Traffic concentration was generated by the branching UPRs, but the effect comes out by the heavy use of 30/30 12 The IPACG meeting 40, Sep. 2014, Washington D. C. Effective Course Non-Ideal Altitude