E-tool (online tender evaluation developed based on New Point Based System for selection of contractors) Construction Development Board Ministry of Works.

Slides:



Advertisements
Similar presentations
PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS.
Advertisements

Managing the Health and Safety of Contractors
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Pre qualified Contractors or Professional Contractors: Role of BPP in stopping quackery in the Water Industry Presented by Engr. Emeka Ezeh OFR Director-General,
Small Business Survey 2012 Focus on New Businesses May 2013.
NEW SYSTEM FOR CONTRACTOR CLASSIFICATION Chencho Tshering Construction Development Board
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – February 2004.
Presentationby Construction Association of Bhutan.
Generation Business Line
1 Opportunities Related to EPC Initiatives Support Services Management - NWC.
e-Procurement in Georgia Everyone sees everything More than anywhere else… Tirana, May, 2012.
Construction Industry Development Board development through partnership Activating the Registers within Construction Procurement 1b.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – July 2004.
Alternative Project Delivery
Selection of Consultancy Services
The Greek Experience IPOs in GREECE. IPOs in Greece – The greek Experience CONTENTS PART I - General Info for listing procedures & markets PART II - Legislation.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
6 th Annual Engineering Conference Procurement Rules & Regulation & SBD Works.
New Point Based System For the Procurement of Works CDB 1.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
1 Business Opportunities Istanbul, Turkey 30 April 2010 Asian Development Bank.
PROCEDURES FOR SELECTING THE CONTRACTOR
Managing Projects
GOOD PRACTICES IN THE FIELD OF PUBLIC PROCUREMENT
Public Procurement Regulatory Authority
AfDB - EBRD Joint conference in procurement reform in North Africa and SEMED Countries Marrakech 22 and 23 April 2013 Jordan Delegation 22-23/4/2013.
Energy Saving Improvement Programs aka: ESIP; ESCO; P.L. 2009, c. 4 Gordon Ball, Senior Procurement Specialist Division of Local Government Services Introducing…
Accounting Specialist Basic Functions : To provide essential data by computing and distributing collections to their respective allocations. Knowing the.
Construction Industry Development Board development through partnership CONSTRUCTION INDUSTRY DEVELOPMENT BOARD Umgeni Supplier Information Session Tuesday.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
Audit of procurement and financing for Brampton civic hospital project ( A PPP Project) About this Project-- (i) In late 1990s,HRSC(Health Services Restructuring.
1 Ministry of Education Budget Execution March 28, 2010 As of.
The Point Based System For Contractor Selection For Award Of Construction Works Accelerating Bhutan’s Socio-Economic Development- GNHC, MoWHS & MoF.
Financial accounting Cost accounting Management accounting.
Presentation on Financial and Procurement Procedure to be followed by the Institute Management Committees.
HOW TO ASSESS SUPPLIER RESPONSIBILITY (TECHNICALLY & FINANCIALLY) Mariel D’Eustachio Dave Avera 3/28/00.
INTRODUCTION TO PUBLIC FINANCE MANAGEMENT Module 3.1 – Special issues: Payroll, Procurement and IT.
Governmental Procurement ISQA 440 Goals of Procurement Steps in the Procurement Cycle Specifications and Work Scopes 1.
Specification & Quantities Estimating
WELCOME TO UNB. MARK McGEEHAN Assistant Manager, Procurement Services 3 plus years with UNB 28 years in Healthcare Procurement Current member of APPA.
1 11 th International Anti-Corruption Conference Enhancing Transparency through Government e-Procurement System (GePS) Jae Hyun Yum.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
Introduction Procurement of Consultant Services (based on PPA 2004 and Best Practices) Presented by: NM Lema Macrh, 2013.
Amendments to the Work Permit Rules: Problematic Issues Alex Nisengolts 28 April 2011.
Public Procurement Uinsinn Finn Galway County Council Roads, Transportation, Marine.
ACCOUNTING FOR CAPITAL PROJECTS Financial Policies and Procedures for the Capital Project Delivery Process Office of the CFO.
How to Win Council Business: A Guide to the Procurement Practice in Local Government.
INTER-AMERICAN DEVELOPMENT BANK Business Opportunities IDB Financing in Latin America and The Caribbean May 2016.
Department of Property and Procurement Division of Procurement Property & Procurement Economic Development Seminar Friday & Saturday, May 6 & 7, 2016.
The realisation of the projects: "sine qua non" condition for the absorption of the EU Funds.
PRE-BID MEETING CONSTRUCTION OF THE MEDUPI-BORUTHO TRANSMISSION LINE PRE-BID MEETING WORLD BANK GUIDELINES Presented by: Brendah Shange.
마스터 제목 스타일 편집 Overview of K-MAS Commercialization & Competitiveness Products with similar quality, function and specification Standardized specification.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Tender Briefing Session COR34/2016
Minimum Set of Requirements for Suppliers
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
Contractor Review and Prequalification
Minimum Set of Requirements for Suppliers
Ministry of Finance of the Republic of Azerbaijan
Evaluation Grids Evaluation Grids.
Qualification Criteria and Available Tender Capacity
Background Uganda Skills Development Project (USDP)
PROJECT DELIVERY METHODS
What is the buyer looking for?
SIXTH SOUTH ASIA REGION PUBLIC PROCUREMENT CONFERENCE: PROFESSIONALIZATION OF PUBLIC PROCUREMENT FOR BETTER PERFORMANCE.
Presentation transcript:

e-tool (online tender evaluation developed based on New Point Based System for selection of contractors) Construction Development Board Ministry of Works & Human Settlement Chencho Tshering

2  e-tool is a web based online evaluation tool.  it is developed based on New Point Based System.  only the evaluation stage/phase is done online.  launched on 1 st May  Uniform/standard evaluation system.  Save evaluation time.  Centralized Construction Industry Information.

Qualification Parameters (100%) ≥ 65 Financial Parameters (90%) Financial Parameters (90%) Price Preference Parameters (10%) 1.Status (incorporated, proprietorship, JV etc.) 2.Employment of VTI Graduates/ local skilled Labour 3.Commitment for internships to VTI graduates Price Preference Parameters (10%) 1.Status (incorporated, proprietorship, JV etc.) 2.Employment of VTI Graduates/ local skilled Labour 3.Commitment for internships to VTI graduates 1st Stage Qualification Criteria Bidder Qualification Criteria 1st Stage Qualification Criteria Bidder Qualification Criteria 2 nd Stage Combination of financial and Preference parameters 2 nd Stage Combination of financial and Preference parameters CAPABILITY (70%) 1.Similar work 2.Equipments 3.Key Personnel 4.Past Performance CAPABILITY (70%) 1.Similar work 2.Equipments 3.Key Personnel 4.Past Performance CAPACITY (30%) 1.Bid Capacity 2.Credit Line CAPACITY (30%) 1.Bid Capacity 2.Credit Line 3 two stage evaluation process

ACCESS TO EQUIPMEN(25%) AVAILABILITY OF MANPOWER( 25%) CREDIT AVAILABLE(20%) AVERAGE PERFORMANCE SCORE (10%) BID CAPACITY (10%) E-TOOL 4 CDB DATA BASE SIMILAR WORK EXPERINCE (10%) Similar work experience from last 5 calendar years 2*A*N-B A=average turnover of last 3 yrs N=estimated duration of the project B=portion of ongoing works overlapping cp Average performance score from previous work( past 5 calendar years) Credit Line available (unused). (Score based on letter of credit provided by the bank) Availability of Manpower (This parameter evaluates contractors on their ability to deploy personnel with suitable qualifications and experience) Access to adequate Equipment (100% marks if equipments are owned and 75% if hired)

5 To calculate similar work experience : To calculate Bid Capacity : To Calculate Credit Line : A Average turnover of the contractor over the last 3 calendar years N Estimated duration of the project to be tendered B Portion of other ongoing works to be completed in the period that overlaps with the current project’s duration (that is, N) Bid Capacity = 2 * A * N – B E Estimated project cost N Duration of project C Estimated monthly cash flow for the project CF = E/N*3 Therefore Credit line available = CA / CF * 100 Similar work experience = x 100 Agg. Size of 3 similar works/ 1 largest Single work Estimate of Current Project

1 Upload Tender Document/NIT 2 Generate Work ID Set Criteria for Equipments & HR 3 Online Evaluation 4 Completion Report 5 Reports e – tool module

7 Existing tendering procedure changes with e-tool Prepare SBD Advertise NIT in media Advertise NIT on e-tool and set criteria as per SBD open Bid and check documents Evaluation of Tender Documents Enter data on e-tool based on information Submitted by contractors and process the results Evaluation Committee submit evaluation report to the awarding committee Award the work as per AC’s decision on e-tool Site engineer/project engineer submits completion form (CON03)to the focal person to be updated on e-tool Update completion form on e-tool

8 PROCURING AGENCIES Dzongkhag Departments Divisions Sector Geog PROCURING AGENCIES Dzongkhag Departments Divisions Sector Geog FOCAL PERSON ( Member of Tender /Evaluation Committee) FOCAL PERSON ( Member of Tender /Evaluation Committee) Request for WORK ID & upload NIT/IFB in print media & on CDB web Submit bidding document & set criteria for work Evaluate bids online (Evaluation Committee) Site engineers/mangers submit completion for updating on e-tool Submit evaluation report & award work responsibility of focal person

No. of Tenders uploaded on e-tool1500 (approx.) 9 e-too status as of 8 th -Feb-2012

Questions ??? 10 Tashi Delek

Construction Development Board Ministry of Works & Human Settlement Chencho Tshering NEW SYSTEM FOR CONTRACTOR CLASSIFICATION

Outline of the Presentation  Objective  Old Classification System  New Classification System

Program Objective  To introduce the new system for contractor classification that allows more flexibility and opportunities to the contractors in execution of works to their best capacity and capability

CLASS “D” (PETTY) Allowable Range < 2 Million Maximum Project = 1 work CLASS “C” Allowable Range 2-9 MillionMaximum Project = 3 works CLASS “B” Allowable Range 9-19 MillionMaximum Project = 4 works CLASS “A” Allowable Range > 19 MillionMaximum Project = 5 works Old Classification System

1. Financial Capacity CriteriaClass AClass BClass C Option I : Net Worth ( Total cost of assets owned) Nu. 8 MillionNu. 2.5 MillionNu Million Option II: Net Worth and Average Annual turnover (trial balance) Nu. 3 Million and Nu.45.0 Million Nu. 0.8 Million and Nu.19.0 Million Nu Million and Nu. 5.5 Million Option III: Net Worth and Average Annual Credits (OD/ Credit Facility) Nu. 3 Million and Nu. 8 Million Nu. 0.8 Million and Nu. 2.5 Million Nu..275 Million and Nu..825 Million Requirement for the old system:- Note** Not applicable for class D (petty)

2.Equipments and Facilities Mandatory Equipment & Facilities A W1 W3 W4 B W1 W3 W4 C W1 W3 W4 Excavator (or) Pay loader (or) (Motor grader for W1) Road Roller Truck (Truck/ Tractor for Class C) * 1* 1* Air Compressor 1* 1* 1* Survey Equipments 1* 1* 1* 1* 1* Concrete Mixer Vibrator * 1* 1* Crane Truck Steel Shuttering set (sft) Water Pump Meggar Max Puller

CriteriaA W1 & W3 W4 B W1 & W3 W4 C W1 & W3 W4 D (petty) Permanent Key Employees: Manager Graduate Engineer Diploma Engineer Accountant Site Supervisor Minimum no. of employees 1 1(civil) 1 (elec) 2(civil) 2 (elec) 1 3(civil) 3 (elec) 8 1 1(civil) 1 (elec) 1 2(civil) 2 (elec) (civil) (civil) 1 (elec) Human Resources:-

Criteria ABCD (Petty) To Re- Validate or Re- Register Applicants must be currently registered as class 'A' Contractors Works in progress or completed one project in the applied category valued at least Nu. 19 million, or alternatively participated in at least five (5) biddings during the previous two years. Applicants must be currently registered as Class “B” Contractor Works in progress or completed one project in the applied category valued at least Nu. 9.0 million, or alternatively participated in at least five (4) biddings during the previous two years. Applicants must be currently registered as Class “C” Contractor Works in progress or completed one project in the applied category valued at least Nu. 1.5 Million or alternatively participated in at least 5 biddings during the previous 2 years. Currently registered with the CDB Works in progress or completed one project or participated in at least 2 biddings in the last 2 years 4. Track Record:-

CriteriaABCD To up- grade Applicants must be currently registered as class ‘B' Contractors Completed three projects in the applied category valued at least Nu. 9.0 million each, or alternatively, one project in the applied category valued of at least Nu. 18 million, during the previous two years. Applicants must be currently registered as Class “C” Contractor Completed three projects in the applied category valued at least Nu. 5.5 million each, or alternatively, one project in the applied category valued at least 7.5 million, during the previous two years. Applicants must be currently registered as Class “D” Contractor Completed three projects in the applied category valued at least Nu Million each, or alternatively, one project in the applied category valued at least Nu Million, during the previous two years.. N/A For NEW REGIST-- RATION Direct Entry available as special case only when established as an incorporated company under the Company Act of Bhutan. Requires formal assessment and approval of the Board. Engineer above Diploma level with a minimum of 5 years documented project execution experience, and a direct involvement in projects with a minimum accumulated value of Nu. 7.5 million. 4. Track Record contd……:-

CLASS “SMALL”(S) Allowable Range ≤ 4 Million Maximum Project = 2 works (provided the amount is <4m) CLASS “MEDIUM”(M) Allowable Range 4-15 MillionMaximum Project = 4 works CLASS “LARGE” (L) Allowable Range > 15 MillionMaximum Project = 5 works New Classification System

1. Financial Capacity – No requirement for all the classes 2. Track Record – No requirement for all the classes Objective  To provide opportunity to new, young & promising contractor to perform and grow  To overcome the shortage of contractors especially in the higher class  To give weightage to experience and qualification of key personnel in the firm rather than giving weightage only to firm’s experience  However the requirement of firm’s experience is also important to some extent, therefore this requirement will be tested during bid evaluation Special features of the New system:-

Criteria Large W1 & W3 W4 Medium W1 & W3 W4 Small Permanent Key Employees: Manager Graduate Engineer Diploma Engineer Accountant Site Supervisor Minimum no. of employees 1 1(civil) 1 (elec) 2(civil) 1(elect) 1 1 3(civil) 3 (elec) elect 1 1 2(civil) 2 (elec) * 2 1. HUMAN RESOURCES:- Note: All large contractors must incorporate within 1 year of registration

Mandatory Equipment & Facilities Large W1 W3 W4 Medium W1 W3 W4 Small Excavator (or) Pay loader (or) (Motor grader for W1) Road Roller Truck * 1 Air Compressor 1* 1* 1* Survey Equipments 1* 1* 1* Concrete Mixer * Vibrator * 1* Crane Truck Steel Shuttering set (sft) Water Pump Meggar Max Puller EQUIPMENT REQUIREMENTS:-

Issues:- 1.Direct Entry  Direct entry is permissible in the old classification system as well. However the old evaluation system discourages bids of direct entry.  Mismatch between work volume and number of contractors. Therefore more contractors are needed in higher classes.  Equal opportunity for all capable contractors to participate in the booming construction sector  To increase competition such that efficiency improves

Issues contd…..:- 2. Incorporation for Large Class  Encourage more professional management of the construction company in terms of book keeping, HR Policies etc.  Incorporated companies are considered better employers and people prefer working for such companies.  Incorporated companies will find it easier to enter into collaboration with international engineering and construction companies for large or technically complex projects.  Incorporation allows government to get more accurate and organized data and information about the industry and to accordingly frame policies for the welfare of the industry.

Number of Contractors/Consultants/Architects ( as of 8 th Feb 2012) Class# of Contractors Large99 (including 5 non-Bhutanese Firm) Medium371 Small2924 Total3394 Consultants, Architects, Specialized Trade (VTI Graduate) 46 - Consultancy Firms registered with CDB 47 - Individual Architects registered with CDB VTI Graduates registered with CDB

Thank You!!