Page 1 M.Ungaro Deep Processes Working Group Meeting Feb 25-28 Genova Italia E1-DVCS2 Run Status e1-dvcs2 Run Status Maurizio Ungaro University of Connecticut.

Slides:



Advertisements
Similar presentations
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Advertisements

FROST G9b FROST status update May 24 - June 13, Run Coordinators: Mike Dugger, Eugene Pasyuk, Barry Ritchie.
Using an FPGA to Control the Protection of National Security and Sailor Lives at Sea Brenda G. Martinez, Undergraduate Student K.L. Butler-Purry, Ph.D.,
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
1 Development of Any Frequency Fire Rate SLR Control System Cunbo FAN, Xue DONG, Xingwei HAN, You ZHAO Changchun Observatory, , China.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
Brahim MorenoStudents' seminar at Bosen Workshop ΔVCS and Generalized Parton Distributions
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
Patrick Robbe, LAL Orsay, for the LHCb Collaboration, 16 December 2014
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
ERL Differential Current System Status Peter Cameron with contributions from Michelle Wilinski and Christophe DeFrance (Bergoz) 17 Sep 07.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
MARS MV converter input plane design and implementation Shuai Lu, Prof El-Sharkawi EE, University of Washington March 29, 2005.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
CLAS12 CalCom Status Update CLAS Collaboration Meeting November 14, 2014.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Run Coordinator Weekly Report EG6 Commissioning October Raffaella De Vita.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Triggering with the RPD E. Burtin, CEA-Saclay COMPASS Hadron run trigger meeting, Feb. 12, 2008.
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
Update on MC-04(05) –New interaction region –Attenuation lengths vs endcap module numbers –Regeneration and nuclear interaction –EMC time resolution –
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
LHCb production experience with Geant4 LCG Applications Area Meeting October F.Ranjard/ CERN.
Peter-Bernd Otte - 8 th March 2010 CB collaboration meeting, Mainz.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Offline meeting Outcome of Scientific Committee Status of MC04 Proposal for a minimum bias EvCl sample Other offline activies: –Reprocessing –Dead wires.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
Thomas Jefferson National Accelerator Facility Page Hall B:User Software Contributions Gerard Gilfoyle University of Richmond 12 GeV Upgrade Software Review.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Latest News & Other Issues Ricardo Goncalo (LIP), David Miller (Chicago) Jet Trigger Signature Group Meeting 9/2/2015.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
Compton Trigger Design Update Tanja Horn Compton Working Group 6 June 2008.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Offline Status Report A. Antonelli Summary presentation for KLOE General Meeting Outline: Reprocessing status DST production Data Quality MC production.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
LAV thresholds requirements Paolo Valente. LAV answers for Valeri’s questions (old) 1.List of hardware to control (HV, LV, crates, temperatures, pressure,
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
Run Coordinator Report February 5 to 8 Stepan Stepanyan JLAB 1.
Tuning of trigger simulation parameters (Bossi, Moulson, Palutan, Sciascia) Calorimeter trigger thresholds calibration using prompt photons from K S 
Calibration & Monitoring M.N Minard Monitoring News Status of monitoring tools Histogramm and monitoring meeting 6/02/08 Calibration farm brainstorming.
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
Thomas Jefferson National Accelerator Facility Page 1 CLAS12 Workshop Jefferson Lab February 23, 2016 Time-of-Flight Software Status Jerry Gilfoyle, Evgeny.
Page 1 WP10.2: TA DESY- II Test Beam Facility AIDA-2020 First Annual Meeting Norbert Meyners, Marcel Stanitzki, Natalia Potylitsina-Kube DESY.
"North American" Electronics
Weekly PDL report (Jul 7-14)
Controlling a large CPU farm using industrial tools
Philippe Charpentier CERN – LHCb On behalf of the LHCb Computing Group
CLAS12 Ready for Science Answers to the Homework Questions & Summary/Path Forward Latifa Elouadrhiri Jefferson Lab CLAS12 Ready for Science Review.
CLAS12 First Experiment Workshop Report
The IFR Online Detector Control at the BaBar experiment at SLAC
Example of DAQ Trigger issues for the SoLID experiment
Preparation of the CLAS12 First Experiment Status and Time-Line
FPGA Based Trigger System for the Klystron Department
The IFR Online Detector Control at the BaBar experiment at SLAC
Throttling: Infrastructure, Dead Time, Monitoring
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

Page 1 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status e1-dvcs2 Run Status Maurizio Ungaro University of Connecticut and Jefferson Lab

Page 2 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status 2 Outline Data Conditions New Trigger Beam Current Scan Solenoid Current Scan Solenoid Field Mapping Data status e1-dvcs2 and current/future issues

Page 3 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status 3 Startup, Run Conditions Friday Oct 24, 2008 start up after long period of machine shutdown Good beam tuned on Sunday Oct 26, Run ended on Jan 24, nA Beam current Luminosity 86% polarization DC Occupancy 2.5% Trigger Rate: 3.4KHz Dead Time: ~10%

Page 4 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status 4 Brand New DVCS Trigger Logic Valery Kubarovsky New dvcs Trigger Logic is based on the Field-Programmable Gate Array (FPGA) Commercially available CAEN Module V1495 is a VME board, suitable for various digital Gate/Trigger/Translator/Buffer/Test applications, which can be directly customized by the User. 64 inputs 32 outputs

Page 5 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status 5 Brand New DVCS Trigger Logic 424 IC signals 72 hodoscope signals 6 TOF (OR of all counters in each sector) 6 CC inputs (OR of all counters in each sector) 4x6 EC inputs (inner and total energy threshold signals in each sector) 532 input signals in total Caen- V1495 IC Calorimeter TOF-6CC-6EC(4*6=24) IC Hodoscope many independent decisions in each sector

Page 6 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status 6 Brand New DVCS Trigger Logic

Page 7 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status 7 Brand New DVCS Trigger Logic Perform CC threshold scans from mV (corresponding to 0.2 – 2 p.e.). Trigger rate changes by factor ~3 *

Page 8 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status 8 Beam Luminosity Scan

Page 9 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status 9 Beam Luminosity Scan Empty Target

Page 10 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status 10 Beam Quality: December 2008

Page 11 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status 11 Accelerator RF Model Improved

Page 12 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status 13 trips in 3 hours Beam Quality: January 2009

Page 13 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status epX asymmetry sin  moment Half-wave plate insertion Courtesy of Harut 85% Beam Polarization

Page 14 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status Current (A)Run NumberN. of eventsR1 DC Occupancy (Axial)R1 DC Occupancy (Stereo)DC SA, SS (muA) Mn/a, n/a, n/a, n/a, n/a, n/a1.9, 2.0, 1.6, 2.2, 2.0, 1.9n/a M1.8, 1.8, 2.1, n/a, n/a, n/an/a, n/a, n/a, 2.46, 2.2, , M1.86, 1.89, 2.21, 1.98, 1.97, , 2.33, 1.78, 2.49, 2.31, , M1.96, 1.97, 2.29, 2.10, 2.01, , 2.43, 1.85, 2.61, 2.41, , M1.96, 1.96, 2.25, 2.13, 2.10, , 2.32, 1.81, 2.64, 2.41, , M2.02, 2.08, 2.31, 2.23, 2.11, , 2.56, 1.91, 2.76, 2.38, , M2.21, 2.33, 2.64, 2.41, 2.47, , 2.81, 2.07, 3.01, 2.83, , M2.5, 2.63, 2.78, 2.63, 2.65, , 3.10, 2.19, 3.23, 3.07, , M2.79, 3.14, 3.02, 3.52, 3.26, , 3.63, 3.15, 3.61, 3.19, , , M3.5, 4.22, 3.95, 3.92, 4.33, , 4.7, 3.16, 4.73, 4.81, , , DC Trips DVCS Solenoid Current Scan: 1/22: DVCS Solenoid Current Scan, Straight Tracks Runs

Page 15 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status 15 Solenoid Field Mapping CLAS-Note

Page 16 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status 16 Solenoid Field Mapping Comparison With Data Compatible with: ~1mm shift (affects BX) ~0.5 mRad (affects BY)

Page 17 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status 17 Various Issues Shifts / Documentation Personnel Sometimes not Well Trained to take shifts: Monitoring histos not printed / looked at all the times Documentation / Warning Signs not read Alarm Silenced / Ignored Start / End Run, non-emergency situations (like Moeller Runs) What to Monitor Please: Come one hour before your shift if it’s your first time

Page 18 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status 18 Various Issues Fedora 8 switch Reconstruction Software: Black Box Data ? Also: Desktops are RHEL5 Software is Fedora 8

Page 19 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status 19 Various Issues Computer Farm: Factor of 4-5 increase in Jobs submitted CPU Power is still the same as 5 years ago – no plans to increase it. We need at least factor of 2 – otherwise: 1.Forget about processing data in 2 months 2.Forget about huge simulations We’re already in “crisis” more – affecting data quality. Meeting between offline group and CC staff Action needed: buy nodes, disk space. Estimated Costs: K.

Page 20 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status 20 Conclusions Calibration is Ongoing ~900 Runs 100 TB of data