Risk Analysis For: ES-317Y and ES 497 2002 Plant Design Project at UWO By: R.A. Hawrelak, P.Eng. - Lecturer Dept of Chem & Biochem Eng’g Dow Chemical –

Slides:



Advertisements
Similar presentations
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Advertisements

Work Health Safety Regulations Regulations Module: Workplace WHS requirements Workbook page 8.
Emergency Planning and Community Right to Know Carter Hanson / Patrick Cudahy 2011.
Ethanol Tank Fire Manildra, Inc. Port Kembla, NSW, Australia 3 Mar 04
1. European Commission Status GHS Implementation in the European Community Global Thematic Workshop on Strengthening Capacities to Implement the GHS Johannesburg.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Law approximation and implementation in Hungary Ministry for Environment Department of Integrated Pollution Control Nicosia, May 2001 Andrea Nám, desk.
23 killed, 130 Injured, $1,300MM damage
1 Chemical Hazards. 2 Purpose of Lectures on Chemical Safety To understand the hazardous properties of chemicals prior to their use. To transport / handle.
Understanding the management of risks to health and safety on the premises of a retail business Unit 352.
Jack Harrah Governor’s Office of Emergency Services
California Accidental Release Prevention Program California Accidental Release Prevention (CalARP) Program.
“ Hard work and concern for the society is the key to success ” - O P Jindal On-site and Off-site Emergency Plans Based on Integral Risk Management – Key.
Modeling with CAMEO Les Benedict St. Regis Mohawk Tribe.
Pipeline Qra Seminar Title slide Title slide.
1 Chemical Process Safety. 2 Outline of Lecture on Chemical Process Safety Inherent Safety Hazard Identification Risk Assessment Fire Protection.
RESPONSIBLE CARE ® DISTRIBUTION CODE Daniel Roczniak Senior Director, Responsible Care American Chemistry Council June 2010.
Controlling Risk by Managing Change Jessica Blaydes & Gary Fobare Honeywell Aerospace 2013 Region IX Workshop.
Health and Safety Act 1974 What does it mean to me and the place where I work?
Process Safety Management
Hazards Identification & Risk Assessment (HIRA) and On-site & Off-site Emergency management Plans Dr. R. Dubey - DMI.
Dow Fire and Explosion Index (FEI) Dick Hawrelak Presented to ES317Y in 2001 at UWO.
Management of Health And Safety.
EPCRA1 The Emergency Planning and Community Right-to-Know Act (EPCRA) The Emergency Planning and Community Right-to-Know Act (EPCRA)
12. Health, Safety and Environment (Tasks 10 & 11)
Hazards Analysis. The Next 55 Minutes... l Overview of Hazards Analysis l Scenarios for EPCRA and RMP l Resources.
Process Safety Management
Contaminated land: dealing with hydrocarbon contamination Assessing risks to human health.
U.S. Department of Homeland Security Chemicals of Interest Anti-terrorism Standard.
Ert 312 LECTURE 4 OSHA & DOSH.
Clean Air Act Section 112(r) Federal Program Update U.S. EPA Pacific Southwest Region Emergency Prevention and Preparedness February 15, 2007 CUPA Training.
WHAT IS SYSTEM SAFETY? The field of safety analysis in which systems are evaluated using a number of different techniques to improve safety. There are.
Food Safety Assurance August Scope of food quality & food safety The term “food” covers any unprocessed, semi- processed, or processed item that.
Centre for External Safety ir C.M. van Luijk, director RIVM national institute for public health and the environment.
Health and Safety Policy
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
Introduction R.A. (Dick) Hawrelak BASc - Chem Eng UBC MASc - Chem Eng UBC Associate Process Consultant Dow.
Experiences on risk analysis, modelling and the preparation of safety reports in the Netherlands Eric van der Schans Senior Consultant DHV.
Hazards Identification and Risk Assessment
Hydrogen risk assessment in São Paulo State – Brazil Newton Pimenta Sandro Tomaz Giuseppe Michelino 4 th International Conference on Hydrogen Safety ICHS.
Florida Accidental Release Prevention and Risk Management Planning (ARP/RMP) Act State Emergency Response Commission Preparing for Facility Risk Management.
1 Risk Factors Let choose a person-induced hazard first. The following are risk factors for an airplane crash:  A study completed by the International.
Introduction to a Safe Workplace
Risk Estimation Two distinct categories of Risies Voluntary Risks e.g. driving or riding in an automobile, and working in an industrial facility. Involuntary.
BTEC Level 3 Diploma in Applied Science
Objectives By the end of this presentation you will know: What risk assessment is; Where the need for risk assessment comes from; and The principles behind.
OHSAS Occupational health and safety management system.
Health and Safety Unit 3 Sophie Bevan. COSHH What does it stand for? ‘The Control of Substances Hazardous to Health’ Regulations (2002) What does it.
Capacity-building from the perspective of the ECE Industrial Accidents Convention Virginia Fusé, UNECE secretariatIspra26/03/2015.
Risk Assessment: A Practical Guide to Assessing Operational Risk
Lowell Randel Global Cold Chain Alliance/ International Institute of Ammonia Refrigeration.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and Climate Change.
CTR 1210 – Career Prep. WHMIS Workplace Hazardous Materials Information System Every province has WHMIS legislation WHMIS protects workers from materials,
Dow Fire and Explosion Index (FEI)
Policy proposals update
Workshop on E-waste Recycling and Refurbishing: Environmentally Sound Management Practices Guidance Supporting Environmentally Sound Management (ESM)
CO Chemical Safety Workshops for Regulated Facilities
Emergency Planning 101 A Regulatory Review & Tips for Getting Started
HSE Case: Risk Based Approach.
Sandia National Laboratories
Quantitative Risk Assessment
CCA September 2012 French LUP Experience Seminar –September
The Emergency Planning & Community Right-To-Know Act
ASSESSING THE ENVIRONMENTAL CONSEQUENCE OF POTENTIAL MAJOR ACCIDENTS
Dow Fire and Explosion Index (FEI)
DOMINO EFFECTS & OTHER SAFETY CHALLENGES IN INDUSTRIAL PARKS
WGC-2 DG Meeting Towards a Guidance on Groundwater Chemical Status and Threshold Values 14:00 – 16:00 21 April 2008 Ljubljana, Slovenia.
European Commission, DG Environment Air & Industrial Emissions Unit
Risk Management NDS Forum June 23rd 2010.
Presentation transcript:

Risk Analysis For: ES-317Y and ES Plant Design Project at UWO By: R.A. Hawrelak, P.Eng. - Lecturer Dept of Chem & Biochem Eng’g Dow Chemical – 1960 to 1993

What is Risk Analysis? A risk analysis is any study that identifies hazardous concerns. There are many types of risk analyses (PHA, HAZOP, Dow Fire and Explosion Index, QRA). Two basic methodologies. One is a Deterministic Method and the other is a Probabilistic Method.

Deterministic Methods How far to LEL? How far to second degree burns? How far to 1 psig Overpressure in a VCE (building damage)? How far to ERPG2 - a toxic concentration endpoint for a dispersion.

Probabilistic Method Quantitative Risk Analysis (QRA) What is probability of reaching the LEL at a certain distance? What is probability of receiving second degree burns? What is probability of receiving 1 psig Overpressure from a VCE?

Netherlands Opts For QRA Detailed QRA legislated by law. Permits req’d for all plants. Individual Risk negligible at 1E-08 chance of fatality per year. Societal Risk required to meet specified Guidelines. All companies use SAFETI, a huge, complex computer model.

Dutch Individual Risk

Dutch Societal Risk

Great Britain Opts For QRA Detailed QRA required if HSE deems the plant exceeds certain planning criteria. QRA can be performed by HSE or any recognized risk company. HSE has proposed 1E-06 chance of fatality as a level of risk that would be broadly acceptable to members of the public.

US EPA Opts For A Deterministic Risk Method Risk Management Plan (RMP) became law on 20 June, Worst Case Scenario and Alternative Scenario for each toxic chemical. Only one flammable scenario - Worst Case and Alternative, the one that impacts on the public to the greatest extent.

U.S. RMP Computer Program RMP Manual available with 27 examples or …. Free download of RMP computer program at comp.html comp.html Download it on to your hard disc. It’s very simple to use. If you don’t know your storage quantity yet, run the threshold quantity to see how big a problem you may have. You may decide to store less.

Canada Opts For Guidelines Major Industrial Accidents Council of Canada (MIACC). MIACC modifies Dutch Guide To Hazardous Industrial Activities. A two point probabilistic method using Individual Risk as negligible at 1E-06. Dow Chemical does not accept the two point concept because it is fundamentally flawed (RAH – MIACC rep for Dow).

MIACC Publications Lists of Hazardous Substances Hazardous Substances Risk Assessment: a Mini-Guide for Municipalities and Industry. Risk Assessment Guidelines for Municipalities and Industries - An Initial Screening Tool.

New Canadian Draft Regulation Ottawa, August 20, Industrial Facilities that handle dangerous substances will be required to develop accident prevention plans. e.htmhttp:// e.htm Environmental Emergency (E2) Regulations under Canadian Environmental Protection Act, 1999 (CEPA 1999) Targets an initial list of 174 substances.

What Info Included in E2 Plan? Senior management commitment. Types of on-site and off-site emergencies. A description of individual roles & responsibilities. Contact lists. Training logs. A means for ensuring the plan is current, comprehensive and effective.

E2 Implementation 1500 facilities expected to comply with the proposed regulation. Must develop, implement and test an emergency plan within 1 year of the regulation coming into effect. Regulation is expected to be in place early in 2003.

E2 Submissions E2 plans will not be submitted. Two declarations must be submitted. (1) A declaration that a E2 plan has been prepared and is being implemented. (2) A declaration of implementation indicating that implementation of the E2 plan has been completed.

Info in Declarations Facility data. An indication of whether or not environmental emergency prevention, preparedness, response and recovery measures are identified in the plan. An indication that information from previous environmental emergencies has been incorporated into the plan.

Key References Used in E2 See Appendix 3 in Draft Regulation. Quebec Guide: CRAIM, Risk management for Major Industrial Accidents intended for municipalities and Industry (Based on U.S. RMP). Hazardous Substances Risk Assessment: a Mini-Guide for Municipalities and Industry. (Flawed methodology – RAH).

E-2 Concerns Need to Question the threshold quantity in List of Substances. Concern that smaller quantities may impact on the public in areas where the public is too close to the chemical facility. Concern regarding lack of a permit to operate. The EPA gives a permit to operate based on the RMP program.

RMP Concerns RMP stresses ERPG2 end points for toxic chemicals. This low concentration results in long impact distance for any given dispersion. RMP requires ER planning over a large area which is difficult to plan and manage. RMP does not identify acute hazardous areas closer to the source. These area are extremely vulnerable in short time frames. Use of alternate dispersion models must be qualified against known data points. RMP focus is on storage. More hazardous areas such as reactors are not included (Flixborough).

End of Presentation Good luck on your project. Questions can be asked via at