LONG: Laboratories Over Next Generation Networks. Project Description & WP1: Management.

Slides:



Advertisements
Similar presentations
ERA-NET 1 REPORTING REQUIREMENTS. ERA-NET 2 Contract The contract for an ERA-NET is a contractual link of all participants with the Commission defines.
Advertisements

19/02/ Cyclades Kick Off Meeting What a European Co-ordinator expects from his partners and what a European Consortium expects from his Co-ordinator.
Work Plan Setup the project work plan can be written online, allowing all applicants central access and up-to-the-minute documentation. This feature is.
CIRAS PROJECT OVERVIEW
LONG: Laboratories Over Next Generation Networks. Demonstration Script Introduction to LONG IPv6 Backbone Network Maps. Partners Connectivity (Tunnels,
Emmanouel (Manos) Varvarigos Computer Technology Institute and Press "Diophantus“, CTI Greece Gathering and Processing Energy Consumption Data from Greek.
LONG: Laboratories Over Next Generation Networks. LONG Laboratories Over Next Generation Networks Jordi Domingo-Pascual Josep Mangues-Bafalluy Advanced.
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
KM3NeT, , Pylos © FIM-NewLearning 2007 KM3NeT Management & Reporting Dr. Roland Klein Project Office KM3NeT
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO PROJECT The contract management Overview By Dominique Guéguen / Ifremer.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT Progress / objectives (WP and project level) Progress / milestones (WP and project level) Progress / deliverables.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
ALPINE SEARCH AND RESCUE FOR SLOVENIA AND ITALY. ALPSAR IN SHORT  Budget: € ,00  EC Contribution: € ,25 (75%)  Duration: 24 Months 
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
LONG: Laboratories Over Next Generation Networks. LONG: Laboratories Over Next Generation Networks Project: IST LONG WP2 – Network Design and.
EGEE is a project funded by the European Union under contract IST JRA4 Execution Plan and Brainstorming Javier Orellana JRA4 Coordinator EGEE.
The Preparatory Phase Proposal a first draft to be discussed.
LINKED Administrative & Finance overview18/03/2010 LINKED Leveraging Innovation for a Network of Knowledge on Education LIFE LONG LEARNING PROGRAMME LLP.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
General Assembly 2 - JERICO - 1 Patrick Farcy I Ifremer I Financial Management WP11 Jerico GA I Oslo I Norway.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems Communication in the consortium Review meeting Delft,
SARMa project development WP1 Project management and coordination SARMa internal handbook Alianta d.o.o., Ljubljana Split, 4-5 February 2010.
MODERN 1 st Year Review ENIAC MODERN Ref. Technical Annex MODERN_PartB Rev2 v2.4 WP1: Giuliana GangemiWP2: André Juge WP3: Wilmar HeuvelmanWP4:
This project has been funded with support from the European Commission. This publication [communication] reflects the views only of the author, and the.
ESnet Site Coordinators Committee (ESCC): IPv6 Activities & Directions Phil DeMar (ESCC Chair) HEPix IPv6 Workshop (CERN) June 22, 2011.
November New Programme Projects of National Importance Lm25,000 Specific Programme still under development.
An Integrated Project under EU 6th Framework Programme Kick-off meeting, Hamburg September 2004 Chris Hewitt, Met Office Hadley Centre, UK
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Slide 1 PAO MO75 M. Hugon D:/DATA/POWERPNT/HNML. 0107kickoffconcertedaction ADvanced Options for P&T ADOPT Thematic Network kick-off Meeting.
Demonstrators and Pan-European Services Laboratory WP5 session.
WP0 session Management and External Relations. Código 00/00 2 Index Overview A1: Project co-ordination A2: Dissemination and Exploitation Plans A3: External.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 – Dissemination, Exploitation Strategy and Standardization Inova+ Co-Living.
“Reporting Procedure for I3” Seadatanet kick-off Heraklion, June 8-9, 2006 Lorenza Saracco, European Commission DG Research.
NSHIELD Project Meeting Brussels - 15 Feb 2012 Luigi Trono.
Athanassios Liakopoulos Greek Research & Technology Network / GRNET Athens, October 19, 2004 Athens, October 19 th,
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT −Progress / objectives (WP and project level) −Progress / milestones (WP and project level) −Progress /
Project Management Birutė Markevičiūtė Joint Technical Secretariat Lead Partner Seminar 13 October 2008, Riga.
1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Lukas Ruf.
Javier Orellana JRA4 Coordinator Face to Face Partners Meeting University College London 11 December 2003 EGEE is proposed as a project funded by the European.
DG Justice and Consumers Project Management Some points of attention JUST/2014/JCOO/AG/CRIM and JUST/2014/JCOO/AG/CIVI Kick-off meeting 26 January2016.
Advanced Remote Tower 1 13 Nov 2007Malmö/Sturup1 Advanced Remote Tower Administrative processes (WP0.1, WP4.3) Malmö/Sturup 13 Nov 2007.
Reporting. CONTENT Types of project assessment reports Questionnaires – follow-up of researchers Declaration on Conformity Amendments SESAM and reporting.
2050AP Project WP5: “Conclusions” UPM Madrid 11 de Octubre 2013.
Pre-Workshop on Intervention of Science and Technology in Traditional Crafts Date : 14 th Dec Venue : Seminar Hall, First Floor of S & H Building.
What is STAR?  A set of tools and information that will supply Technical and Financial Support for agencies wishing to provide transportation services.
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
Contract Kari-Jouko Räihä. The Package  Contract (“core contract”) Signed between the coordinator and the commission Accession forms signed by the coordinator.
AMICI WP1 – Management, coordination and dissemination
4th. Plenary Meeting, Edinburgh, May 2010
DataGrid Quality Assurance
EMI Project Processes and Tools
Institute of Informatics & Telecommunications
Universitat de Barcelona / FBG
Introducing Novell IPv6 Stack
FP7 SCIENTIFIC NEGOTIATIONS Astrid Kaemena European Commission
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
AMICI WP1 – Management, coordination and dissemination
ITDG meeting of of October 2011
ENabling SafE Multi-Brand Platooning for Europe
Executive Project Kickoff
Presentation transcript:

LONG: Laboratories Over Next Generation Networks. Project Description & WP1: Management

LONG: Laboratories Over Next Generation Networks. Index Introduction l LONG Description l LONG Objectives WP 1 l WP 1 - Project Management l WP 1: Milestones & Deliverables l WP 1: Activities n A1.1: Project Meetings n A1.1: Management Facilities n A1.1: Global view of Technical Tasks n A1.2: Resources Consumption Analysis n A1.2: Issues related to partners

LONG: Laboratories Over Next Generation Networks. LONG Description LONG: Laboratories Over Next Generation Networks. n IST Program (RN2): IST n Participants: PTIN, TID, UC3M, UEV, UPC, UPM, TED (NOR)*. n Project Coordination: TID. n Start Date: 1/12/2000, Duration: 24 Months. n Total effort in person Month: MM l Management, Coordination and Dissemination Work Packages: n WP 1 [TID]: Management and Coordination of the whole work. n WP 5 [UPC]: Dissemination of the Results. l Technical Work Packages : n WP 2 [PTIN]: Network Design and Deployment. n WP 3 [UPM]: Collaborative Work Environment. n WP 4 [UC3M]: System Trials and Evaluation.

LONG: Laboratories Over Next Generation Networks. LONG Objectives LONG abstract: n Identify and solve problems related to Design & Deployment of NGN and advanced user applications. n Focused in IPv6 since it is expected to become part of NGN. n Cover all network and services/application levels. l Concrete LONG Objectives: n To Deploy a Next Generation Test-bed where IPv6 protocol can be studied and tested over different Access and Transport technologies. n Basic and Advanced Network services are studied and tested in order to validate their integration in the stable network. n IPv4-IPv6 Transition Mechanisms are studied and tested to incorporate transition scenarios and solutions in the LONG test-bed.

LONG: Laboratories Over Next Generation Networks. WP 1 - Project Management l WP 1 main Objectives: n To guarantee the correct progress of the work. n To disseminate and make available partial and global results to other projects. n To organise plenary and technical meetings needed for correct project progress. WP 1 MM distribution

LONG: Laboratories Over Next Generation Networks. WP 1: Milestones & Deliverables l WP 1 Milestones l WP 1 Deliverables:

LONG: Laboratories Over Next Generation Networks. WP 1: Activities l Activity A1.1 “Management” includes the following tasks: n Interface with EC services (financial and technical issues). n Organization of meetings n Management facilities n Technical Management: Global view of technical tasks l Activity A1.2 “Assessment & Evaluation” includes the following tasks: n Project Objectives achievement and Quality Analysis. n Final edition of deliverables. n Resources Consumption analysis (MM and other concepts) n Issues related to partners

LONG: Laboratories Over Next Generation Networks. A1.1: Project Meetings l ISABEL Collaborative Work Software has been used in most meetings. n ISABEL over IPv4 at the beginning. n ISABEL over IPv6 when available (migrated by UPM in LONG). Using ISABEL we have saved 14,315 € in Plenaries travel costs (calculation based in Kick-off Madrid meeting)

LONG: Laboratories Over Next Generation Networks. A1.1: Management Facilities In order to improve tech. activities, the following tasks have been done: l Internal Web page repository n Free Cost to the project (Sponsorship by Agora Systems, SA). n Configured and installed at UPM premises. n Used to share LONG deliverables and Audit slides to the auditors. l IRC chat room, mainly to prepare ISABEL meetings. n IPv4-Internet (UPM) & IPv6-LONG (UC3M) servers. l Statistics system has been deployed by TID to check network stability. Used also as diagnostic tool to solve failures in links among partners. n These statistics can be accessed from a WEB IPv6 located at TID in the LONG project and from UPC Internet public WEB server.

LONG: Laboratories Over Next Generation Networks. A1.1: Global view of Technical Tasks IPv6 Standars & Equipment Hosts & Routers Advanced Net. Services Mobility, Multicast, QoS, Secur. Basic/ Adv. User Services Common Services, ISABEL 1st LONG IPv6 Stable Backbone Basic Net. Services DNS, BGP4+ IPv6 Labs REPORTS IPv6 Labs Interconnection Tunnels Apps. Migration User Services IPv4/IPv6 Mixed Scenario Functionality Testing Functionality Testing Access Systems IPv6 Access/Transport Tech. ADSL, CATV, WLAN, ISDN ATM, POS, GbE Resultant Network M9 (Ago 2001) M18 (May 2002) Transition Mechanisms IPv4-IPv6 TM Installed as needed Performance Testing

LONG: Laboratories Over Next Generation Networks. A.2 Resources Consumption Analysis l Man Power control tables maintained by TID: Estimations are calculated as: Total/24 Months.

LONG: Laboratories Over Next Generation Networks. A.2 Resources Consumption Analysis (II) l Other Expenditure Concepts control tables maintained by TID: These tables are intended to help all Partners to analyze their own financial situation.

LONG: Laboratories Over Next Generation Networks. A1.2: Issues related to partners l Ericsson-Telebit withdrawal on M08 (JUL 2001) n TED had an small participation in LONG project (9 MM. 0,76 consummed). n TED’s financial situation made them to withdrawn from low partic. projects. n Main point to include TED was to have an industrial partner in LONG. l New Partner: Nortel Networks n Contacted in M09. Some other candidates were considered (Alcatel, 6WIND). n Nortel: Industrial partner clearly interested in IPv6 and LONG project. n Following project information, activities and results since M12 (Dec 2001). n Expected participation since M16 (APR 2002). l Contract Amendment sent to EC on FEB 2002: n Revision to Annex I & Letter explaining LONG objectives are not modified. n New Funds distribution. Total fund amount is not modified. n CPFs signed by Nortel sent on 2nd APR 2002.

LONG: Laboratories Over Next Generation Networks.