1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.

Slides:



Advertisements
Similar presentations
Overview of Environment Agency Decommissioning and Clean up programme – delivering Nuclear site restoration Peter Orr, decommissioning and clean up programme.
Advertisements

H. Sterner E. Thurow Energiewerke Nord GmbH
Objectives Terminal Objective
International Atomic Energy Agency IX.4.3. Waste management.
Copyright [insert date set by system] by [CH2M HILL Entity] Company Confidential Update on Fukushima Daiichi NPP 1 – Preparations for Core Debris Removal.
1 RADIOACTIVE WASTE MANAGEMENT (PART 1) A RAHMAN RWE NUKEM Ltd (UK)
Tulane University - Office of Environmental Health & Safety (OEHS) Abandoned Laboratory Chemicals Tulane University May 2012.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
1 Preparing a decommissioning project H. Sterner E. Thurow Energiewerke Nord GmbH H. Sterner; E. Thurow, EWN, chapter 1.
OVERVIEW: Definition Types of nuclear reactions First commercial application Mechanism & Brief History Advantages and Disadvantages Facts of Nuclear energy.
Indian strategy for management of spent fuel from Nuclear Power Reactors S.Basu, India.
Decommissioning Nuclear Reactors. Background Before a company decides to close it’s power reactors the facility must be put in to a state that no longer.
Decommissioning Nuclear Reactors. Background Before a company decides to close it’s power reactors the facility must be put in to a state that it no longer.
MODULE “STRATEGY DEVELOPMENT”
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Challenges in developing a Safety Case WG5. How to Develop a Safety Case SC can be a tool for providing information to stakeholders other than regulators.
1 CHAPTER 9 MATERIAL MANAGEMENT Demeulemeester Yves BR3 Dismantling project SCKCEN.
 A nuclear reactor produces and controls the release of energy from splitting the atoms of certain elements. In a nuclear power reactor, the energy released.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Nuclear Energy General Concept. In 2001, total US generation of electricity was 3,777 billion kilowatt-hours.
Nuclear Fact Sheet Matthew Pigott EGRS 352 Professor Nicodemus Process: Nuclear energy results from the splitting of uranium atoms in a process called.
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
1 Preparing a decommissioning project (part III) H. Sterner E. Thurow Energiewerke Nord GmbH H. Sterner; E. Thurow, EWN, chapter 3.
SAFESPUR 9/7/08 1 Innovation in Nuclear Decommissioning: New Technologies and Research, SAFESPUR Forum, July 9, 2008 G.R. Elder Bradtec Decon Technologies.
NuLeAF presentation Magnox ILW strategy 14 th May 2015 May 14th
NEI Presentation on Nuclear Decommissioning Trust (NDT) Use Concerns.
1 MATERIAL MANAGEMENT Emond Olivier BR3 Dismantling project Group Leader D&D material management SCKCEN Emond O. SCK-CEN chapter 6.
Performance Assessment Issues in Waste Management and Environmental Protection Annual Meeting of the Baltimore-Washington Chapter of the Health Physics.
1 NEED IN INTEGRAL APPROACH  Strategy and Politics in Decommissioning  Institutional and Legal aspects  Regulatory aspects  Economic aspects  Socio-Economic.
Group New Projects Related to Decommissioning. 29 th May 2008 KNPP Richard Benbow – Head of Kozloduy PMU.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management.
International Atomic Energy Agency IX.4.4. Pre-disposal waste management Safety Standards.
Didier Noël, EDF R&D on Decommissioning, Bruxelles, mars 7th, R&D on decommissioning at EDF.
Clean-up of former nuclear sites and the role of the Planning regime Jim Cochrane.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Source Control Project, Phase I Chemical hazards Objectives  Development of the of risk assessment methodology based on the use of approaches of ISO
Source Control Phases I-II: Source Control Phases I-II: Main findings  Facility: drinking water and sewage treatment utility in Apatity, Murmansk region,
Fission Physics 12 Adv. Comprehension Check 1. Two deuterium nuclei fuse to form a tritium nuclei and a proton. How much energy is liberated? 2. A deuterium.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
PARTNERS MAINT COMPANY LTD International Nuclear Forum "BULGARIAN NUCLEAR ENERGY - NATIONAL, REGIONAL AND WORLD ENERGY SAFETY “, Varna, 2-4 June 2011.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E Reister CE Presentation 1/98 1 Program Elements and Related Activities Rich Reister U.S. Department.
Nuclear Waste Disposal By: Tierra Simmons. Nuclear Waste Disposal Controversy Nuclear energy provides enough efficient sources of energy than all fossil.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
-1- UNRESTRICTED / ILLIMITÉ Demonstrating the Safety of Long-Term Waste Management Facilities Dave Garrick 2015 September.
Calder Hall Sellafield Decommissioning Martin Adam Heriot-Watt Edinburgh 2008.
 Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean.
Nuclear Power Plant How A Nuclear Reactor Works.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
Nuclear Power. What Is Nuclear Power? Nuclear power is the use of nuclear reactions that release nuclear energy, which generates heat. The energy produced.
Nuclear Power Plant How A Nuclear Reactor Works. Pressurized Water Reactor - Nuclear Power Plant.
State Enterprise Radioactive Waste Presented by: Momchil Kazakov – Chief Technologist SD “Decommissioning 1-4 unit”, SERAW 15–17 June 2016 Golden Sands.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Nuclear decommissioning: Turning waste into Wealth
Preliminary Decommissioning Plan for the Canadian Light Source
02:21 Full System Decontamination at the Obrigheim Nuclear Power Plant Prior to Decommissioning Wilhelm Kukla, EnBW Kernkraft GmbH, Obrigheim NPP Christian.
-EL ABBARI Younes, FADIL Najib (CNESTEN) -SADIQ Younes (AMSSNuR)
Management of Radioactive Waste
Nuclear (Atomic) Power Plant
Communication and Consultation with Interested Parties by the RB
USNRC IRRS TRAINING Lecture18
Radioactive waste management - status
REGULATORY ASPECTS OF RADIOACTIVE WASTE MANAGEMENT IN TURKEY Dr
Dr. Mitica Dragusin, Project Manager,
Presentation transcript:

1 KRB-A (Grundremmingen, Germany)

2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in the Federal Republic of Germany KRB-A General Description

3 KRB-A Layout

4 KRB-A Project Summary 1977: reactor shut down 1980: decommissioning planning 1983: phase I: removal of components and systems in the turbine house 1990: phase II: decommissioning of primary circuit 1992-date: phase III: dismantling of RPV, internals and biological shield 2005: complete reactor removal

5 KRB-A Operational lessons learned The use of chemical decontamination to minimise waste for disposal Ice sawing technique successfully used to stabilise and cut through tube bundles Thermal cutting is flexible and reliable Mechanical tools are simple to handle

6 KRB-A General learning points No single dismantling tool Avoidance of complicated techniques Clearly defined waste management process

7 KGR (Greifswald,Germany)

8 Type:8 Pressurised Water Reactors Power: 440MW(e) each Four reactors operational between 1973 and 1990 Reactor units based on Russian WWER design, three reactors never commissioned, one test operation KGR General Description

9 KGR Project Summary : units 1-5 shut down and construction of units 6-8 halted : dismantling of equipment, units : start of Interim Storage North (ISN) operations : demonstration remote dismantling, unit : dismantling of reactor and internals, units : completion of reactor buildings demolition

10 KGR Site re-use Harbour construction works at the former cooling water outlet channel

11 KGR Progress Percent dismantling complete (by mass) as at May 2004 Unit 171% Unit 273% Unit 316% Unit 466% Unit 580% Turbine hall51% Removal of large components to the ISN for decay storage RPV (214Mg) Steam generator (166Mg)

12 KGR Waste management Total mass site decommissioning waste 1,800,000 Mg Radiologically unrestricted material 1,233,600 Mg Other radioactive residuals 566,400 Mg Remaining building structures 471,200 Mg Concrete for radioactive waste or decay storage 26,000 Mg Dismantling plant parts 69,200 Mg Unrestricted release 511,100 Mg Restricted re-use 2,500 Mg Conventional waste 3,750 Mg Decay storage 28,400 Mg Radioactive waste 16,500 Mg Controlled re-use in nuclear facilities 4,150 Mg Sorting, packaging and buffer storage

13 KGR Operational lessons learned No specific problems Development of a comprehensive inventory Use of simple, sturdy equipment Complete planning - shut down to disposal ALARA principle

14 KGR General learning points Challenge to project management and logistics Social aspects - strategy for site re-use Clear and realistic requirements from the licensing authority Open dialogue with the public

15 NPP-A1 (Jaslovske Bohunice, Slovakia) ReactorPrimary circ.Turbocompressors Turbines Steam generators Long term spent fuel store Refuelling machine in reactor hall

16 Type:Heavy Water Gas Cooled Reactor Power: 143 MW(e) Started in 1972, shut down in 1977 Experimental and power prototype reactor for the development of gas cooled, heavy water moderated reactors using natural uranium. NPP-A1 General Description

17 NPP-A1 Project Summary 1977: reactor shut down : transition period 1999: all spent fuel transported to Russia : first decommissioning phase : final decommissioning

18 NPP-A1 Operational lessons learned Decommissioning greatly influenced by reactor history (accidents) and fuels and liquid waste storage issues Successful co-operation with European companies Use of operational staff knowledge Clear definition of waste management routes and process requirements Carrying out activities in small steps with small teams

19 NPP-A1 General learning points Maintaining fuel cladding integrity during operation Co-operation between project managers, technicians, health physicists and regulators

20 Summary of lessons learned(1) Initial characterisation Impacts cost, schedule, decontamination strategy, waste managaement

21 Summary of lessons learned(2) Tools and equipment Simple, appropriate, tested, commercially available where possible manual > remote develop contingency solutions and tooling consider effect of aging

22 Summary of lessons learned(3) Operational management remove debris promptly and in a controlled way consider effect of temporary systems on existing systems establish a fit for purpose working environment

23 Summary of lessons learned(4) Risk management prioritise take a total risk approach avoid creating new hazards consider non radiological and radiological hazards equally risk assessment/management must be an ongoing process

24 Summary of lessons learned(5) Waste management plan all operations minimise production of wastes e.g. segregate wastes at source do not generate a waste stream until a disposal strategy has been defined adequately consider effect of decontamination techniques on secondary waste generation, cost, worker health and safety

25 Summary of lessons learned(6) Staff experience make use of available expertise maintain team continuity where possible small experienced teams are generally more effective

26 Summary of lessons learned(7) International collaboration benchmarking exchange agreements - sharing technologies and experiences

27 Summary of lessons learned(8) Stakeholder involvement openness and transparency develop mechanisms for consulting and dissemination of information