P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
Philip Burrows CLIC MDI Meeting 6/11/091 Design issues for IP intra-train feedback Philip Burrows John Adams Institute Oxford University.
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
P.N. Burrows ATF2 Project Meeting, KEK, 18/12/061 Philip Burrows John Adams Institute Oxford University LCABD ATF / ATF2 ESA Miscellaneous FONT.
P.N. Burrows GDE/MDI Vancouver 19/7/06 (T-488) Philip Burrows John Adams Institute Oxford University EM Background Tests of Feedback BPM.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Philip Burrows Third Mini Workshop on Nano Project, KEK 30/5/05 Philip Burrows Queen Mary, University of London Overview of Intra-train Beam Feedback Program.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
FONT IP intra-train feedback prototype status
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
Font 4 Review Digital Feedback System BPM Analogue Processor Digital Processor Feather Kicker Power Amplifier Pick up StriplinesKicker StriplinesBeam.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
Philip Burrows ECFA LC Workshop, Warsaw, 10 June Philip Burrows John Adams Institute Oxford University G. Christian, C. Clarke, B. Constance, H.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Marc Ross Saturday, June 5, 2004 nanometer BPM status and plans.
P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Philip Burrows John Adams Institute Oxford University FONT4 tests at KEK/ATF EM background.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
1Ben Constance7 th January 2010 FONT5 December 2009 feedback results During the final shift we ran K1-to-P2 position feedback 151.2ns bunch spacing, quadrupoles.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Philip Burrows ALCPG11, Eugene 21/03/111 Performance of FONT at ATF2 Philip Burrows John Adams Institute Oxford University.
1 FONT IP Feedback System Implications of increase of L* Philip Burrows John Adams Institute Oxford University.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Design of the ATF2 FB/FF Systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group Final EUROTeV Scientific Workshop Uppsala, 25-27th.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Design and Simulation of Intra-train Feedback Systems at ATF2: Current Status and Future Plans Javier Resta Lopez (JAI, Oxford University) for the FONT.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
Calibration summary Nov-Dec 09 R Apsimon. 10 Nov 09 Note, the power rail on the FONT5 board wasn’t working properly and so there is no good quality information.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
Design of ATF2 feedback/feed-forward systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group LC-ABD meeting Birmingham, 17-18th.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Jitter Monitor – Overview and Status Report Glenn Christian, Alexander Kalinin 30 May 2005.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Talitha Bromwich, Glenn Christian, Colin Perry, Rebecca Ramjiawan John Adams Institute,
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
Philip Burrows X-band 2010 Daresbury 2/12/101 Advanced beam feedback systems Philip Burrows John Adams Institute Oxford University.
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
Progress towards nanometre beam stabilisation at ATF2
Progress towards nanometre level beam stabilisation
Feed forward orbit corrections for the CLIC RTML
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Presentation transcript:

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez Colin Perry Graduate students: Christina Swinson Ben Constance Robert Apsimon Douglas Bett Alexander Gerbershagen Angeles Faus Golfe Javier Alabau CERN, DESY, KEK, SLAC

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/092 KickerBPM 1 Digital feedback Analogue BPM processor Drive amplifier BPM 2 BPM 3 e- FONT4/5 prototypes at KEK/ATF2 3 bunches, ns spacing 1.3 GeV

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/093 KickerBPM 1 Digital feedback Analogue BPM processor Drive amplifier BPM 2 BPM 3 e- FONT4 prototype at KEK/ATF

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/094 BPM processor

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/095 Digital Feedback Board 2 x Analog Input channels (single-ended) 2 x Analog Output channels (differential)4 x General-purpose digital outputs 3 x external clock/trigger inputs Xilinx Virtex4 FPGA Analog Devices ADC/DACs 40 MHz oscillator RS232 comms JTAG port PROM GP I/O Header

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/096 Specifications: +- 15A (kicker terminated with 50 Ohm) +- 30A (kicker shorted at far end) 35ns risetime (to 90%) pulse length 10 us (specified for bunches) repetition rate 10 Hz Outline design done in Oxford CASE studentship w TMD Technologies Order placed with TMD Sept 06 Two prototype units delivered Dec 06 2 units in service at KEK since 2007 (2009: upgrades made + 1 unit) Kicker driver amplifier

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/097 FONT4 basic operation demonstrated in 2008 running: beam feedback along single axis (y) with few micron resolution FONT4 status

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/098 FONT4 basic operation demonstrated in 2008 running: beam feedback along single axis (y) with few micron resolution FONT4 status

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/099 FONT4 installation was dismantled when ATF extraction line was reconfigured late 2008 FONT operations in 2009

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0910 ATF2 FB system: FONT5 Dedicated system: 2 stripline kickers + fast drive amplifiers 3 stripline BPMs + fast analogue front-end electronics 9-channel digital FB processor

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0911 ATF2 FB system: FONT5 Dedicated system: 2 stripline kickers + fast drive amplifiers 3 stripline BPMs + fast analogue front-end electronics 9-channel digital FB processor

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0912 ATF2 FB system: FONT5 Dedicated system: 2 stripline kickers + fast drive amplifiers 3 stripline BPMs + fast analogue front-end electronics 9-channel digital FB processor

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0913 FONT4 installation was dismantled when ATF extraction line was reconfigured late new BPMs and 2 new kickers installed in new ATF2 extraction line week of February 9 FONT5 operations in 2009

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0914 New FONT5 ATF2 hardware

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0915 FONT4 installation was dismantled when ATF extraction line was reconfigured late new BPMs and 2 new kickers installed in new ATF2 extraction line week of February 9 Main aims: 1) commission new BPMs and kickers (digital DAQ) 2) work on improved resolution  1 um level 3) understand beam dynamics in FONT region Much commissioning work done parasitically - now have FONT ‘standalone’ hardware We typically took 1 shift per week March - May, a total of 6 shifts (!) FONT5: Jan-May 2009

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0916 Example: BPM calibrations

6 Example: kicker calibration Kick of +-40 urad

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0918 Example: resolution vs. bunch Q

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0919 We take 714 MHz signal from machine as LO signal for down-mixing of BPM signals Frequency divide 714 MHz to obtain 357 MHz for clocking the FONT digital FB board We observed phase jumps between 357 and 714 MHz signals Phase stability of 357 vs. 714 MHz

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0920 Phase difference of 714 and 357 MHz signals Phase jumps

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0921 We take 714 MHz signal from machine as LO signal for down-mixing of BPM signals Frequency divide 714 MHz to obtain 357 MHz for clocking the FONT digital FB board We observed phase jumps between 357 and 714 MHz signals A 180-degree shift of 357 MHz would cause ADC sample to miss beam by 2.8ns  reduce signal by up to 50% We tried ‘stable’ source of 714 MHz derived from frequency generator phase-locked to master oscillator Phase stability of 357 vs. 714 MHz

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0922 Comparison of ‘stable’ and ‘unstable’ 714 MHz

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0923 New FONT5 9-channel FB/FF board (y, y’) assembled (Sept. 2009) Bench tested in Oxford (October) Sent to KEK (November) for beam tests Shipped back and repaired (1 week turnaround) Now undergoing further beam tests looks very promising FONT5 since June 2009

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0924 Single bunch calibration: November 19 24

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0925 Single bunch calibration: P3 problem 25 November May

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0926 Bottom stripline had 20 db lower response Pickup removed from beamline and examined during November down week Lot of dust found inside! Noticed that bottom electrode closer to BPM housing than other electrodes – fabrication error? BPM rotated by 90 degrees and reinstalled Will be replaced in December shutdown BPM had been removed in summer for welding of bellows: probably rotated by 90 degrees then P3 problem

ZV6X corrector setting: May

ZV6X corrector setting: November

2Ben Constance27 th November 2009 FB loop closed off on

27 th November 2009 Interleaved FB on/off mode

27 th November 2009 Interleaved FB on/off mode 1 off/on

27 th November 2009 Interleaved FB on/off mode 1 off/on 2 off

27 th November 2009 Interleaved FB on/off mode 1 off/on 2 off 2 on

27 th November 2009 Interleaved FB on/off mode 1 off/on 2 off 2 on 3 off

27 th November 2009 Interleaved FB on/off mode 1 off/on 2 off 2 on 3 off 3 on

2Ben Constance27 th November 2009 FB loop closed off on

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0937 Banana-shaped train studies to see if train can be extracted flat ‘flattening’ signal implemented in firmware Significant bunch-bunch jitter within train Bunches 1 and 3 typically poorly correlated studies to understand origin of decorrelations Beam issues

Extraction kicker timing studies

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09 Beam jitter/correlation studies 18 November 2009, Std Optics, 3 train, ns BS (with FONT4 electronics, P1 & P2 only)‏ Mean position and RMS jitter at P2: Bunch1: /- 5.1 um Bunch2: /- 4.7 um Bunch3: / 5.0 um RMS sagitta wrt train mean: 11.3 um Bunch-to-bunch correlations at P2: B1/B2: 0.76 B2/B3: 0.77 B1/B3: 0.78 resolution < 2.3 um, based on jitter and correlation observed.

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09 Mean position and RMS jitter at P2: Bunch1: / um Bunch2: / um Bunch3: / 15.7 um RMS sagitta wrt train mean: 6.1 um Bunch-to-bunch correlations at P2: B1/B2: 0.48 B2/B3: 0.75 B1/B3: (non sign.)‏ 3-BPM resolution estimates: B1: 3.9 um, B2: 3.3 um, B3 3.4 um Beam jitter/correlation studies 11 December 2009, Std Optics, 3 train, ns BS (with FONT5 electronics - P1, P2, & P3)‏

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09 Mean position and RMS jitter at P2: Bunch1: / um Bunch2: / um Bunch3: / 17.0 um RMS sagitta wrt train mean: 6.1 um Bunch-to-bunch correlations at P2: B1/B2: 0.42 (non sign.)‏ B2/B3: 0.60 B1/B3: (non sign.)‏ 3-BPM resolution estimates (low stats): B1: 3.6um, B2: 2.9 um, B3: 2.8 um Beam jitter/correlation studies 11 December 2009, Std Optics, 3 train, ns BS, AFTER DR CHROMATICITY CORRECTION

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09 Bunch correlations vs. DR RF scan 11 December 2009, Std Optics, 3 train, ns BS, ~50 pulses/setting

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/09 Bunch correlations vs. beam charge 11 December 2009, Std Optics, 3 train, ns BS, ~100 pulses/setting

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0944 New BPMs and kickers installed + working FONT5 FB board fabricated and commissioned FB loop closed Beam quality is a serious issue: banana-train can be tuned away (or corrected) large jitter and lack of correlation between bunches are major problems (sometimes jitter is small and well correlated!) THIS WILL NOT BE BETTER WITH 30 BUNCHES! FONT5 summary 2009

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0945 Valencia Movers

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/ mm horizontal +- 2mm vertical

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/0947 Install Valencia movers (January) Provide ‘turn-key’ bunch-by-bunch FB system for achievement of ATF2 goals Plan to replace LO-based BPM processor scheme FONT plans: 2010