Releases & validation Simon George & Ricardo Goncalo Royal Holloway University of London HLT UK – RAL – 13 July 2009.

Slides:



Advertisements
Similar presentations
Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT Tasks/Responsibilities/Manpow er issues. 1.
Advertisements

L2 chains for single-beam menu Muon full reconstruction T2Calo starting from MBTS Ricardo Gonçalo, Denis Damazio.
Sander Klous on behalf of the ATLAS Collaboration Real-Time May /5/20101.
Jet Slice Status Report Ricardo Gonçalo (LIP) and David Miller (Chicago) For the Jet Trigger Group Trigger General Meeting – 9 July 2014.
Releases and Validation Status Simon George, David Strom, Dmitry Emeliyanov, Monika Wielers, Ricardo Goncalo Trigger Open Meeting – 15 July 2009.
Trigger Data Formats From CBNT to ESD and/or DPD June 11, 2008 Fabrizio Salvatore, Ricardo Gonçalo, RHUL.
The ATLAS High Level Trigger Steering Journée de réflexion – Sept. 14 th 2007 Till Eifert DPNC – ATLAS group.
ATLAS Analysis Model. Introduction On Feb 11, 2008 the Analysis Model Forum published a report (D. Costanzo, I. Hinchliffe, S. Menke, ATL- GEN-INT )
O FFLINE T RIGGER M ONITORING TDAQ Training 30 July 2010 On behalf of the Trigger Offline Monitoring Experts team.
TRIGGER-AWARE ANALYSIS TUTORIAL ARTEMIS Workshop – Pisa – 18 th to 19 th June 2009 Alessandro Cerri (CERN), Ricardo Gonçalo – Royal Holloway.
What’s in the ATLAS data : Trigger Decision ATLAS Offline Software Tutorial CERN, August 2008 Ricardo Gonçalo - RHUL.
Trigger validation for Event size TrigDecision Jets Electrons Ricardo Gonçalo, RHUL Physics Validation Meeting – 9 October 2007.
Ricardo Gonçalo (RHUL) Higgs WG meeting – 28 th August, 2007 Outline: Introduction & release plans Progress in menus for cm -2 s -1 Workshop on trigger.
LHC: ATLAS Experiment meeting “Conditions” data challenge Elizabeth Gallas - Oxford - August 29, 2009 XLDB3.
Software Validation Infrastructure for the ATLAS Trigger Wolfgang Ehrenfeld – DESY On behalf of the ATLAS Trigger Validation Group CHEP 2009 – Prague –
Plans for Trigger Software Validation During Running Trigger Data Quality Assurance Workshop May 6, 2008 Ricardo Gonçalo, David Strom.
1 Trigger “box” and related TDAQ organization Nick Ellis and Xin Wu Chris Bee and Livio Mapelli.
2nd September Richard Hawkings / Paul Laycock Conditions data handling in FDR2c  Tag hierarchies set up (largely by Paul) and communicated in advance.
Databases E. Leonardi, P. Valente. Conditions DB Conditions=Dynamic parameters non-event time-varying Conditions database (CondDB) General definition:
Trigger Offline DQ Monitoring DQ Meeting – 27 Oct 2009 Ricardo Goncalo for Trigger Offline Monitoring.
TRIGGER STATUS AND MENU OPTIMIZATION LHCC Referee Meeting with ATLAS – 7 th July 2009 Ricardo Gonçalo (RHUL) on behalf of the ATLAS TDAQ.
1 John Baines Commissioning of the ATLAS High Level Trigger.
T RIGGER N EWS Higgs Working Group Meeting – 29 April 2010 Ricardo Gonçalo, RHUL.
Preparation for the Beatenberg Trigger Workshop Ricardo Gonçalo Higgs sub-group conveners meeting – 9 Jan.09.
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
LVL2 ID ESD/AOD classes Status and plans. PESA L2 ID Algorithms Review - RAL 25 July Ricardo Goncalo ESD/AOD More and more interest from physics.
DPDs and Trigger Plans for Derived Physics Data Follow up and trigger specific issues Ricardo Gonçalo and Fabrizio Salvatore RHUL.
Trigger ESD/AOD Simon George (RHUL) Ricardo Goncalo (RHUL) Monika Wielers (RAL) Reporting on the work of many people. ATLAS software week September.
1 “Steering the ATLAS High Level Trigger” COMUNE, G. (Michigan State University ) GEORGE, S. (Royal Holloway, University of London) HALLER, J. (CERN) MORETTINI,
Status of trigger software and EDM Ricardo Gonçalo, RHUL – on behalf of ATLAS TDAQ.
The ATLAS Trigger: High-Level Trigger Commissioning and Operation During Early Data Taking Ricardo Gonçalo, Royal Holloway University of London On behalf.
Trigger Offline Expert Report Simon George (RHUL), Ricardo Gonçalo (RHUL) Trigger General Meeting – 25 th November 2009.
Organisation of the Beatenberg Trigger Workshop Ricardo Gonçalo Higgs WG Meeting - 22 Jan.09.
Trigger Validation TAPM Open meeting 2 October 2007 Ricardo Goncalo.
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
Trigger Software Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) TAPM Open Meeting – April 12, 2007 Outline: Reminder of plans Status of infrastructure.
Post-DC2/Rome Production Kaushik De, Mark Sosebee University of Texas at Arlington U.S. Grid Phone Meeting July 13, 2005.
Latest News & Other Issues Ricardo Goncalo (LIP), David Miller (Chicago) Jet Trigger Signature Group Meeting 9/2/2015.
Artemis School On Calibration and Performance of ATLAS Detectors Jörg Stelzer / David Berge.
AOD/ESD plans Status and plans focusing on LVL2 e/  and some items for discussion On behalf of: J.Baines, P.Casado, G.Comune, A.DiMattia, S.George, R.Goncalo,
Moritz Backes, Clemencia Mora-Herrera Département de Physique Nucléaire et Corpusculaire, Université de Genève ATLAS Reconstruction Meeting 8 June 2010.
Trigger validation for Many thanks to Long Zhao, Chihiro Omachi, Julie Kirk, Giovanni Siragusa, Patricia Conde Muiño, Andreas Reinsch, Olya Igonkina,
Online (GNAM) and offline (Express Stream and Tier0) monitoring produced results during cosmic/collision runs (Oct-Dec 2009) Shifter and expert level monitoring.
Trigger Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) on behalf of trigger community Physics Validation Meeting – Feb. 13, 2007.
The ATLAS Trigger Configuration System Design and Commissioning A.dos Anjos, P.Bell, D.Berge, J.Haller, S.Head, T.Kohno, S.Li, T.McMahon, M.Nozicka, H.v.d.
Trigger Offline Monitoring Report Experts: Jiri Masik, Ricardo Gonçalo Shifters: Iwona Grabowska-Bold, Holger von Radziewski, Gustavo Otero y Garzon, Michael.
MUON DAQ WORKSHOP Muon Week, CERN February 2014 Nicoletta Garelli (SLAC)
Performance DPDs and trigger commissioning Preparing input to DPD task force.
TAGS in the Analysis Model Jack Cranshaw, Argonne National Lab September 10, 2009.
Trigger Input to First-Year Analysis Model Working Group And some soul searching… Trigger Open Meeting – 29 July 2009.
Ricardo Gonçalo (RHUL) Higgs WG meeting – 26 th September, 2007 Outline: Programme for today Where we are: –List of tests – post mortem –Slices.
E/gamma report Ricardo Gonçalo for the e/γ slice.
Points from DPD task force First meeting last Tuesday (29 th July) – Need to have concrete proposal in 1 month – Still some confusion and nothing very.
Preparation for Running Outline Present Schedule Detector Preparation Requests for dedicated runs –Cosmics, Splashes, Alignment Muon Shifts Experts A.
WLCG November Plan for shutdown and 2009 data-taking Kors Bos.
Trigger release and validation status and plans David Strom (Oregon), Simon George (RHUL), Ricardo Gonçalo (RHUL)
MET Slice Monitoring Xiaowen Lei, Venkat Kaushik Ken Johns.
UPDATE First Look at Trigger Efficiencies from AOD for ttH, H  bb Catrin Bernius UCL ATLAS Physics Meeting
1/5/09 Jiri Masik1 Event Filter Tracking in the Inner Detector Jiri Masik EFID Trigger related work –Trigger bytestream –Event display.
Introduction 08/11/2007 Higgs WG – Trigger meeting Ricardo Gonçalo, RHUL.
ATLAS UK physics meeting, 10/01/08 1 Triggers for B physics Julie Kirk RAL Overview of B trigger strategy Algorithms – current status and plans Menus Efficiencies.
Distribution of ATLAS Software and configuration data Costin Caramarcu on behalf of ATLAS TDAQ SysAdmins.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
Latest News & Other Issues
Monitoring of L1Calo EM Efficiencies
v4-18-Release: really the last revision!
Level 1 (Calo) Databases
MuonGeoModel status of progress on main items
Presentation transcript:

Releases & validation Simon George & Ricardo Goncalo Royal Holloway University of London HLT UK – RAL – 13 July 2009

13 July 2009HLT UK - Rel, val & core2 Point 1 schedule 15.2.X.Y15.4.X.Y TDAQ

13 July 2009HLT UK - Rel, val & core3 Release schedule Wed 24 June – For MC09 digitization and reconstruction – Tag submission deadline Thu 18 Jun 21:00 – Critical item for trigger: menus and bug fixes – Bug fixes go to AtlasProduction cache Wed 22 July – For ATLAS turn-on (Sept) – tag submission deadline Thu 16 Jul 21:00 – Must have trigger deliverables for online use in this release – LCG externals change so sync with new TDAQ release (end July) – Bug fixes go to AtlaP1HLT and AtlasTier0 caches Post ? – Series of caches and bug fix releases – Expect new features for analysis, detectors and monitoring – Plan to limit trigger to real bug fixes in cache, plus valuable enhancements via bugfix rels (to be discussed) – Rel & val work will switch focus to cache & bugfix rels – Mid to long term plans for dev releases during data taking not yet formulated.

13 July 2009HLT UK - Rel, val & core status MC09 trigger menu being finalised for – Sample A and enhanced bias runs to validate Slice performance validation to be done Open bugs affecting ‘re-run hypotheses’ and ‘HLTResult slimming’ functionality AOD size issue – see Fabrizio’s report

13 July 2009HLT UK - Rel, val & core status - selected outstanding deliverables T2 MC Menus uploaded to DB and distributed with release (core) B1 P. Bell T3b Timeout handling inside algorithms (calo,id,muon) B1 calo,id,muon T8b Algorithms able to modify response to missing data modified based on DetMask? (i.e. which detectors are being read out in a run) (all slices) B1 Slices ? T10a Monitoring tailored for Cosmic running (histogram ranges, ref. histos, DQ checks) (monitoring+all slices) B1 slices T10b Monitoring tailored for Single Beam (monitoring+all slices) B2 slices T10c Monitoring tailored for Early collisions & Stable running (monitoring+all slices) B3 slices T11 Tier0 monitoring comparing offline and HLT quantities (all slices) B2 slices T12 CAF monitoring in place (all slices) B3 slices T13b Algorithms automatically configured for Solenoid and Torroid field settings (ID done, Muon) B2 Oh T14 Completed definition of Trigger content in DPD (EDM) B3 Salvatore T15 Changes to follow Muon Review recommendations (muon) B2 Oh T16a Minor EDM changes (ID) [Cat. B] B1 Emeliyanov (done pending tests) T16c Minor EDM changes (Electron) [Cat. B] B1 Goncalo (done pending tests) T21d Migration of all TrigDecisionTool trigger clients B3 Slices T22 Serializer extended to handle top level persistent class evolution (EDM) B1 Masik (done pending tests) T23 ntuples can be written to single or multiple files configured by TriggerJobOpts? & tested with tier0 production script B3 Slices ? Based on

13 July 2009HLT UK - Rel, val & core6 Memory usage per domain (PMB)

13 July 2009HLT UK - Rel, val & core7 Memory and CPU in MC_lumi1E31_no_prescale RTT test Virtual Memory is in MB Time/100 events is in seconds

13 July 2009HLT UK - Rel, val & core8 Bug closing campaign

13 July 2009HLT UK - Rel, val & core9 Bug closing campaign by slice

13 July 2009HLT UK - Rel, val & core10 Core, rel & val – op & service tasks Operational tasks: – Release coordination (Simon, Dmitry) – Validation coordination (Ricardo, Monika) – Validation daily report shifts (several UK people) – Other contributions welcome Service tasks, e.g. for author qualification: erviceTasks erviceTasks