TP WPM 13.1 D emo environment update TP WPM 13.1 Source: Laurent Velez, ETSI, Meeting Date: 2014-10-08.

Slides:



Advertisements
Similar presentations
TP WPM 14 Showcases D emos TP WPM 14 Source: Laurent Velez, ETSI, Meeting Date:
Advertisements

Technical Plenary From: oneM2M TP leadership Source: Meeting Date: Agenda Item:
AB 11 22 33 44 55 66 77 88 99 10  20  19  18  17  16  15  14  13  12  11  21  22  23  24  25  26  27  28.
C h e m i c a l R e a c t i o n s. C h e m i c a l R e a c t i o n A p r o c e s s i n w h i c h o n e s u b s t a n c e i s c h a n g e d i n t o a n.
A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
3a. Pursue funding for the program plan to effect a transformation that is almost complete…Information Commons.
Document Number Here © 2006 The MITRE Corporation. All rights reserved. Holds and Diversions June 22, 2004.
Testing Framework TST 15 Source: Laurent Velez, ETSI, Meeting Date: TST Testing_framework.PPT.
Step 1: Draw line AB AB Step 2: Draw line AC C Bisecting An Angle Step 3: Draw an arc from point B Step 4: Draw an arc from point C Intersecting the first.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
TST WG Progress Report at TP 18 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18,
TP#1 Meeting Logistics Group Name: TP Source: Victoria Gray, ETSI, Meeting Date: Agenda Item: 4.
too.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP12 Source: Convenor WPM Joachim Koss, Gemalto M2M,
Type your question here. Type Answer Type your question here. Type Answer.
TP#13 oneM2M testing discussion TP#13 Source: Laurent Velez, ETSI, Meeting Date:
Presentation Title OPTIONAL SPACE FOR MEETING NAME -- USE ONLY IF ADDITIONAL SPACE IS NEEDED Meeting or Presenter Name Meeting Data and Time or Presenter’s.
Interoperability event Sept 2015 Group Name: WG TST Source: Sookhyun Jeon, TTA, Laurent Velez, ETSI, Meeting Date:
MORENO VALLEY CAMPUS BUILDING PROJECTS Option 1 Available ASF and Load Ratios on Completion of Projects Project Year CompletionLecLabOfficeLibAVTVOther.
PowerPoint presentation title Presenter’s name and date Put a visual here.
Christmas in ______ Your name Class Period Today’s Date.
Double click here to add event title Double click here to add event date Double click here to add event time Double click here to add event location.
Title Here (Arial, bold, 36 pts.) Presented to Date (Arial, 20 pts.)
An Airlines and Tour management application Sang-Hua Chang Jigar Shreeti Sheshank.
TP#1 Meeting Logistics Group Name: TP Source: Victoria Gray, ETSI, Meeting Date: Agenda Item: 4.
TST WG Status Report to TP #21 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP21, Item.
How to book hotel on line IMWA2014 secretariat May 28, 2014.
Trainers name(s) here.
Welcome to the library reservation system!
Journal of Vision. 2015;15(10):5. doi: / Figure Legend:
Your name Class Period Today’s Date
Presentation Title Here
Enter your , phone, etc Enter your , phone, etc
Your name Class Period Today’s Date
Title of Presentation Presenter Date Etc.
Insert the title of your presentation here
Type the name of your first concept here
This is an ending page..
IRIS CALL BOOKING SCREEN
[type text here] [type text here] [type text here] [type text here]
Scottish Power Station Ferrybridge
Your text here Your text here Your text here Your text here Your text here Pooky.Pandas.
TITLE - TITLE - TITLE Subtitle – Subtitle - Subtitle
Scott's engineering in Ferrybridge
Enter your name, , phone number etc.
Place all the time and date information for all your events
Your text here Your text here Your text here Your text here
TOP project – status update for mts#72
This month's School Name Here cafeteria update
Basic Study Skills Student Name
Your name Class Period Today’s Date
[type text here] [type text here] [type text here] [type text here]
Update on LIBSIP and TTCN-3.org
1st Floor Spaces Layout Latrine Latrine TTF Office TTF Office SQ SQ SQ
KUMC Core Area Map 2016.
Around the room Orders of operations.
Update on LIBSIP and TTCN-3.org
Type your presentation title here
Copyright © 2013 Elsevier Inc. All rights reserved.
UPDATE on PICS GUIDE (EG ) REVIEW
The New Electronic Distribution Form
If your time was: Your wpm are: Your wpm are: 1: 3: 1: 3: 1: 3: 3: 1:
© 2011 Microsoft Corporation. All rights reserved
Thing / Person:____________________ Dates:_________________
[Event Title Here] [Event Title Here] [Event Title Here]
Diabetes in Primary Care
Dinosaur Research Report
X ⦁ X = 64 ±8 ±14 X ⦁ X ⦁ X =
Presentation transcript:

TP WPM 13.1 D emo environment update TP WPM 13.1 Source: Laurent Velez, ETSI, Meeting Date:

oneM2M Demo Following discussion at TP WPM 13, it has been asked to extent the size of the demos space. The only possibility is to use B1AB + Iris Amphi, in addition to B2 and B3 rooms.

Iris Basement 3 B4 B1AB B1B B1A B3 B2

Room capacity © ETSI All rights reserved 4 U BoardclassBoardclassm² Iris B1A ,48 Iris B1B ,72 Iris B ,67 Iris B ,83 Iris B419NA19NA 49, ,04

B1AB Demo room

Iris Amphi room

B2B3 room

B2B3 room ( Here B2 zone)

B2B3 room (here B3 zone)