Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date: 09.26.2012.

Slides:



Advertisements
Similar presentations
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
Advertisements

Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #26 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
Federal Aviation Administration Data Communications Implementation Team (DCIT) Trials Activities/DTAP Update Schedule Timelines Matt Maki.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 07/11/12.
Federal Aviation Administration Data Communications Program Data Comm Trials and Production Requirements: High Level Impact Presented To: DCIT #23 Plenary.
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT Processes Timeline Tracey Gibson CGH Technologies, Inc.
Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Data Link Communications
Data Communications Implementation Team (DCIT)
Document Tracking and the Related Process Andria Roney Rob Mead Andy Fry Andrew Onken.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT23 Update To:DCIT23 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig & Pete Muraca.
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT25 Update To:DCIT25 Plenary From: Matt Maki Date:
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #33 Agenda 6/4/2014 Harris – Washington, DC.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 Agenda 06/12-06/13/2013 Boeing – Arlington, VA.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #21 Plenary 02/01/2013 To: DCIT By: Gregg Anderson.
EWR DCL Trial Update Capt Gregg Kastman MD-11 Flt Trng Sup.
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
NOAA Aviation Safety Board Meeting May 16, 2006 Lieutenant Commander Debora Barr NOAA Aviation Safety Program.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT Meeting 08/24/2011.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #23 Plenary 05/09/2013 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT Update To:DCIT Plenary From: Matt Maki Date:
Request for Service (RFS) Process and Metrics Update June 24, 2008.
Presented to: DCIT By: Andy Fry, Thane Inc. Date: September 26, 2013 Federal Aviation Administration Data Communications DCIT FDWG Climb Via Discussion.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #27 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT 37 Plenary Agenda December 10, 2014 Harris Corp Washington, DC.
GROUND-GROUND STRINGAIR-GROUND STRING AVIONICS CSP AOC DTAP NESG HADDS.
| 1 harris.com Matt Maki DCL Trials Lead DCL Trials Decommissioning Plan 29 Sep 2015.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #31 PLENARY DCL Trials.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status Updates To:DCIT21 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Program Final Investment Decision (FID) – Update on May 30, 2012 Presented to:SC-214/WG-78 Plenary.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #9 Meeting 09/21/2011 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
EDS 1 Early Delivery Systems EDS 1 Update for Workshop Jonathan Pulcini - Project Manager August 17, 2007.
Federal Aviation Administration System Wide Information Management SWIM Implementing Programs (SIPs) Status Presented to: Demonstrations and Prototypes.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #22 Plenary 03/14/2013 To: DCIT By: Gregg Anderson.
P. Muraca v0.4 Data Comm DCL Trials end to end system test.
P. Muraca v0.2 Data Comm DCL Trials end to end system test.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #16 Plenary 05/31/2011 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT24 Update To:DCIT24 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Standard Design Process Overview
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #32 PLENARY DCL Trials.
DCIT Document Hierarchy End-to-End Procedures and operational system features effecting multiple organizations Systems Integration Document Detailed system.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #12 Plenary 01/12/2011 To: DCIT By: Gregg Anderson.
Power of Choice (PoC) Program Overview
19 October 2017 Overview The Management Board, at its December 2015 meeting, has endorsed the timeframe for the implementation of the EU clinical trial.
International Civil Aviation Organization
Data Communications Implementation Team (DCIT)
Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)
Data Communications Implementation Team (DCIT)
Data Communications Program
15-19 Nov 2010 Rockville, MD – Lockheed Martin
LAT Environmental Test Pathfinder F2F NRL-SLAC Networking Update
Presentation transcript:

Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:

Federal Aviation Administration Agenda DTAP Development Status: -DTAP Development/Milestone Deliveries -Trials OT&E Results -DTAP PTR Status MEM DTAP Equipment Installation Status On-going/Completed Trials Activities Status: -Trials FTI/ISSM Provisioning -DTAP Certification -Trials FDIO Test NCP -MEM Training and Procedures

Federal Aviation Administration DTAP Development Status

Federal Aviation Administration DTAP Milestone Deliveries SE2020 Contract Deliverables/DTAP Development On-going: -B2 DTAP currently undergoing Functional Testing in FAATC Data Comm lab -Boeing/Airbus and WJHTC bench avionics being utilized for the testing -B1 Regression testing part of current B2 testing -B3 (UM80, Domestic DB) scheduled for 10/1 delivery -Current B2 HIGH level PTRs fixed -B4 (FDIO) scheduled for 10/23 delivery -B5 (UM83, **UM79 Initial) scheduled for Nov. delivery -Working on Thales to provide this delivery sooner -Actual Baseline/functionality deliveries being finalized with the FAA CO and ITT

Federal Aviation Administration OT&E Testing – PTR Status OT&E Testing Successfully Completed (Sept 11-13): -Very positive feedback from participating MEM/EWR controllers (3 from each site) -ATL controllers did not attend (human resource constrained) -Multiple hands on test scenarios provided to each controller -Test Data/feedback documented for review and action -CHI change request coming out of the testing -MITRE Report created DTAP Functional PTR Documentation: -PTRs categorized as High, Medium, Low status -Weekly review of open PTRs with Thales -Current B2 High Level PTRs planning for fix in B3

Federal Aviation Administration DTAP Test and MEM Trials Timeline

DCL Trials – MEM Timeline (updated: 9/14/2012) pDTAP and Update pDTAP / HADDS vin box test pDTAP / HADDS via FNTB Failover / Rev # test pDTAP / HADDS / CSP Interface via FNTB + bench Avionics pDTAP (applicable reqs/VRTM) testing with bench avionics pDTAP testing via Boeing + Airbus air labs PTR fixes / regression Test Cases document final pDTAP Quick Look Report Sept 17 OT&E Sept SAT at MEM Nov 12 Trials Start MEM Training Tech Center DTAP E-E Functional Testing DTAP 1&2 setup/prep Dry Run & Prep Conduct Controller OT (Prep / Dry Run & Conduct) System test case / bench avionics + TC aircraft System test case / Boeing air lab System test case / Airbus air lab System test case / DCIT aircraft Error conditions / failover PTR fixes / regression 8/23/1012: Security Assessment Regression with B2 (in lab) Regression with B3 (Oct 1 in lab) Regression with B4 (Oct 23 in lab) DTAP Test Report Install & checkout MEM / FDX Training SAT sub_test cases final SAT sub_test cases functional testing/ FedEx aircraft E-E Operational scenarios based on DCIT doc / Live aircraft Error conditions / failover in field 9/27/1012: Security Assessment Regression with B4 (in lab & in field) SAT Test Report May 10 (B1) Aug 17 Aug 22Sept 7Sept 14 DCL & AFN attempt with DCIT aircraft pre-arranged event # 1 (Aug 28, 29 & 30) AFN and CPDLC connect with Boeing event (July 31, Aug 3, 7, 11) Video Tech Center event (Sept. 13) (B2) Sept 3 (B3) Oct 1 (B5) Nov 30 (B1) = CAF, Revised DCLs other than route, CHI, AFN (B2) = Adds UM79, AOC DC (no ack) (B3) = Adds UM80, AOC DC ACK (B5) = Adds UM83 AFN and CPDLC connect with Airbus event (Aug 6-8) Oct 29 – Nov 10 Video MEM event (Sept. 24) Controllers early look & feel (Aug. 29) Func. Regression & Operational OT&E SAT Oct (B4) Oct 23 DTAP 2 setup/install&ch MEM (B4) = Adds FIDO AFN, DCL, Revisions with DCIT aircraft event # 2 (Sept. 25, 26 & 27)

Federal Aviation Administration MEM DTAP Installation Results

Federal Aviation Administration DTAP 17” Display Installed at MEM

Federal Aviation Administration DTAP Pre-Installation Work – Conducted Week of 8/28 150’ Conduit for FDIO FiberBasement and 12 th Fl Fiber Converters

Federal Aviation Administration DTAP Installed in 12 th Fl Rack (9/17) UPS UNITS DTAP Servers DTAP PCs CWP/Maint Display/Keyboard DTAP FDIO Serial Converters DTAP[ Switches CAT5 cables to be replaced with shorter cables

Federal Aviation Administration On-Going/Completed Trials Activities

Federal Aviation Administration Trials FTI/ISSM Provisioning Update Two physical circuits installed at MEM (9/6 – see next slide): -Trials team installed all Fiber/CAT6 to FTI demarc (8/28) Circuits cannot be Activated until ISSM Trials Authorization package approved and FTI paperwork complete: -ISSM to MEM for testing 9/27 -Final authorization completion planned in early October -Circuit activation challenge date mid-Oct -All ISSM requested documentation sent for review 9/17 FTI Operations paperwork/approvals being worked on parallel ISSM track: -DC PO/NEMC MOA (Data Comm PM signing pending) -IP SUP form processing – network configuration work -CSP coordination for connectivity

Federal Aviation Administration Dual FTI 128k Trials Telco Installed

Federal Aviation Administration DTAP Certification DTAP requires Tech Ops certification: -FTI activation approval can’t proceed until certification parameters documented -Tech Ops officials to meet with DC PO and Thales on 9/26 to review DTAP functionality and certification of service procedures -Draft Operator Manual/Cert Procedure complete for review -Final documentation challenge completion date early Oct

Federal Aviation Administration Trials FDIO Test NCP Additional Test NCP submitted : -Create a MEM FDIO/PCRCU Echo Port for DTAP to filter out Rev # data -CMRT baselined – NAS CCB assignment pending

Federal Aviation Administration MEM Training and Procedures MEM Training and Procedures complete: -Basis for OT&E last week -MEM DTAP Training scheduled Oct 29–Nov 10, 2012 SAT scenario/procedures development on-going: -MEM SAT on track for mid/late-Oct -SAT dependent on FTI activation

Federal Aviation Administration Questions ? KMEM