D2 Roadway Discussion Sound Transit Board September 22, 2011.

Slides:



Advertisements
Similar presentations
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Advertisements

Consultation on key routes which run parallel to Oxford Road corridor September 2012 Bus priority package.
The Downtown Seattle Bus Monitoring System Collecting and Analyzing Transit Travel Time Data Owen Kehoe, PE, PTOE King County Metro Transit : Seattle,
2007 Intermodal Operations Planning Workshop Bus Stop & Bus Lane Capacity: Planning Bus Routes in Downtown Seattle Owen Kehoe, PE, PTOE Transportation.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
APTA BRT Conference Seattle, Washington WHAT IN THE WORLD? AUSTRALIAN BUS RAPID TRANSIT – THE BRISBANE BUSWAYS Stephen Lucas Immediate Past Chairman Bus.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Carter Danne, PE, PTOE Parametrix, Inc. Assessment of Point Defiance Bypass for High-Speed Intercity Passenger Rail.
Jan. 16, 208 CoW1 - Light Rail Transit Improving mobility Easing congestion Strengthening our communities Central Corridor Committee of the Whole January.
Transit Improvements on East-West Routes in Downtown Minneapolis Michael Mechtenberg Planner Metro Transit Minneapolis-St. Paul, MN.
Working with State DOTs WSDOT-Sound Transit Landbank Overview
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING April 16, 2014|3:00PM -5:00PM | ROOM 1E-108.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Land Use Impacts of Bus Rapid Transit: The Boston Silver Line Victoria Perk, Senior Research Associate National Bus Rapid Transit Institute Center for.
Lec 31, Handout: Public passenger transport (objectives) Be familiar with mass transit classifications and characteristics Know how urban transport demands.
East Link Operating Plan for Initiating Service on the East Side November 2014.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Roads & Transit 2007 A Smart Joint Program? Financial Considerations As of April 15, 2007.
King County Metro Long Range Public Transportation Plan Kirkland Transportation Commission_ April 10, 2015.
Center City Access Strategy A Transportation Vision for Growth and Access.
Rapid Transit System Steering Committee Meeting December 4, 2012.
Rapid Transit Investment Plan David Armijo, CEO March 19, 2010.
Bus Rapid Transit: Chicago’s New Route to Opportunity Josh Ellis, BRT Project Manager Metropolitan Planning Council.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
Urban Partnership Agreement Summary August 27, 2007.
NESTS Transit Planning Project Facilities and Technology Briefing with CAST of Cornell University and Creighton Manning Engineering, LLP.
Transit Service Detours during Confederation Line Construction Transit Commission December 9, 2013.
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Los Angeles County Metropolitan Transportation Authority Overview of Metro’s Transportation Program Pam O’Connor Metro Chair July 25, 2007.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
MATRIX ADJUSTMENT MACRO (DEMADJ.MAC AND DEMADJT.MAC) APPLICATIONS: SEATTLE EXPERIENCE Murli K. Adury Youssef Dehghani Sujay Davuluri Parsons Brinckerhoff.
The Purple Line Transit Connecting Bethesda, New Carrolton, and the Washington Metro Presented by- Nick Flanders Rose Ryan Anupam Srivastava.
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
1. Variety of modes (types) of transport (public and private) 2. Density of transport networks more nodes and.
ITS PCB T3 Webinar October 21, 2008 Montgomery County, Maryland Advanced Transportation Management System Automated Parking Information System Operational.
South Bellevue Operational Noise Mitigation Types of barriersTypes of barriers Heights and locations Heights and locations City of Bellevue Light Rail.
Airport Systems Planning & Design / RdN Airport and Airline Access Dr. Richard de Neufville Professor of Systems Engineering and Civil and Environmental.
Mercer Corridor Stakeholder Committee November 4, 2015 Sound Transit.
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
Overview of King County Transit Signal Priority Program T3 Webinar January 22, 2008.
Transit Signal Priority: The Importance of AVL Data David T. Crout Tri-County Metropolitan Transportation District of Oregon (TriMet) Presented at Transportation.
Real-time Bus Information on Mobile Devices Stuart D. Maclean, Daniel J. Dailey ITS Research Program University of Washington, Seattle, WA.
Fairview Avenue North Bridge Replacement Project Seattle Bicycle Advisory Board MariLyn J. Yim, P.E. October 7, 2015.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
Pioneer ICM site in Seattle – SoDo Corridor Vinh Q. Dang, WSDOT.
Lecture 2: Improving Transit Service Through Planning, Design, and Operations This lecture was originally prepared by Dr. Kari Watkins, Georgia Institute.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Proposed Additions to MUTCD. Chapter 8E. Busway Grade Crossings Proposed revision submitted to FHWA in June Intended for next edition of MUTCD.
Solving the SR-520 Problem © 2005 Chaisy, Hurvitz, Jiang, Jun, ShinnersSlide 1 (of 31) Solving the SR-520 Problem prepared for UTRAN prepared by INSTEP.
The Downtown Seattle Bus Monitoring System A New Way of Collecting and Analyzing Transit Travel Time Data Owen Kehoe, PE, PTOE King County Metro Transit.
Operations and Service Concept
Free MetroRide Travel Time and Reliability Improvements
Transportation Management Plan Modernization Project
Slugging in the I-395 Corridor
D Line Station Plan Overview
D Line Station Plan Overview
ST CURRENT & FUTURE SERVICE MAPS
Transportation Management Plan Modernization Project
West Cervantes Traffic Feasibility Study Jill Lavender, Transportation Planner Cory Wilkinson, AICP CEP, Project Manager Mary Morgan, PE, Engineer.
Presentation transcript:

D2 Roadway Discussion Sound Transit Board September 22, 2011

Today’s Presentation Up-date on the D2 Analysis Discussion next steps 2

D2 Transitway Operations 3 EIS evaluates joint bus-rail operations and rail only operation Both options are feasible During the East Link construction the D2 will be closed to all traffic Experience with Downtown Seattle Transit Tunnel (DSTT) indicates joint operations impacts transit reliability

Future Light Rail Network 4 Kent / Des Moines Lynnwood Overlake Northgate Two operating lines in the future The peak load point for the system is in the DSTT Assumes 8 min. headways and 4-car trains Critical that NB trains from the south and east arrive at the merge point on schedule Potential to operate 6-min. headways with 3-car trains D2 Transitway Area 8-min. Headways/ 4-car trains 4-min. Headways

Status of Analysis 5 Operations and Administration Committee was briefed on the D2 Roadway operations at the July 21 st meeting Since July ST has been working closely with Metro, WSDOT, and the City of Seattle to refine options which include: –Modifications to joint operations –Adding a bus only lane on the D2 –Surface options if buses do not use the D2 –Possible bus/rail integration options at S. Bellevue Park & Ride and Mercer Island

D2 Busway Joint Use ROW 6 D2 covers 1.4 miles Several tight curves and grades EB and WB lanes separated by barrier

Rail Operations on the D2 (Under Joint Operations) 7 With joint operations trains will not be able to use Automatic Train Protection (ATP) mode which potentially affects safety and reliability Instead trains will operate in line of sight mode: –“Operate at a speed that would allow the operator to identify, react and stop the train within ½ of the distance of the obstruction ahead.” Train speeds under joint operations are estimated to be 1 minute slower WB and 1.5 minutes slower EB

Bus Only Lane on the D2 8 Light rail tracks would be constructed to one side An 11ft wide bus lane would be added to the D2 Bus lane evaluated as reversible or outbound only Bus travel times are faster than with joint use Light rail vehicle would be able to run in ATP mode Additional engineering is required, as is approval from WSDOT and FHWA

Surface Street Options 9 D2 would be rail only Buses would use either I-90 mainline to 4 th Ave or Rainier Ave and Dearborn St. to and from downtown Results in longer bus travel times, especially in the PM peak period Affects bus reliability

Bus Integration Option Route Current Headway (minutes)AM Peak Origin 21210Eastgate P&R 21420Issaquah 21530North Bend 21630Sammamish 21812Issaquah Highlands Bus travel times are longer to the south end of downtown due to transfer Bus hours savings could be redeployed

Conclusions 11 Joint Operations:Delays both buses and trains Bus Only Lane:Improves travel times for bus and trains but additional design is needed Surface Streets:Buses delayed by congestion, especially in the PM and during events Bus Integration:Increases transfers for bus passenger but significant operating hours saved

Next Steps 12 With Board concurrence, ST will recommend to FTA that the ROD specify rail only on the D2 Roadway ST and King County will enter into an agreement and develop a work plan to evaluate the busway option and other options including bus/rail integration If the busway option proves to be unfeasible, ST and KCM will jointly reconsider other alternatives

Summary of Options Considered 13