BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District SARASOTA COUNTY – LIDO KEY HURRICANE & STORM DAMAGE REDUCTION PROJECT City of Sarasota.

Slides:



Advertisements
Similar presentations
1 Dennis Daughters, P.E. City Engineer / Director of Engineering, City of Sarasota Lido Key Beach Renourishment Program & New Pass Dredging.
Advertisements

Coastal Processes.
Megan Kaun San Francisco District (415) US Army Corps of Engineers BUILDING STRONG ® San Francisco District Sediment.
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
Post-Hurricane Ivan Emergency Habitat Restoration Larry E. Parson – U.S. Army Corps of Engineers, Mobile District Linda S. Lillycrop - U.S. Army Corps.
US Army Corps of Engineers BUILDING STRONG ® JACKSONVILLE DISTRICT COASTAL DAMAGE REDUCTION FLOOD DAMAGE REDUCTION NAVIGATION ECOSYSTEM RESTORATIONREGULATORYINTERAGENCY.
OCEN 201 Introduction to Ocean & Coastal Engineering Coastal Processes & Structures Jun Zhang
1 The Grain Drain Boston New York Washington, DC Miami Dune areas on the continental shelf caused by breaking waves are called sand bars. Waves pile up.
US Army Corps of Engineers BUILDING STRONG ® Vertical Team Roles & Responsibilities Planning Principles & Procedures – FY11.
Restoring and protecting Louisiana’s coast Barrier Plan June 16, 2010 Kyle Graham Deputy Director of Planning and Programs Office of the Governor – Coastal.
JACKSONVILLE DISTRICT 5 Year NEW WORK DREDGING PROGRAM JACKSONVILLE DISTRICT 5 Year NEW WORK DREDGING PROGRAM NAD/SAD REGIONAL DREDGING MEETING/WEDA NAD/SAD.
People Pressure on Shorelines Shorelines – The Human Factor.
Flood Avoidance and Mitigation
Corps Regional Sediment Management and Habitat Restoration: Cape May, NJ J. Bailey Smith National Planning Center of Expertise for Coastal Storm Damage.
Q AVG US Army Corps of Engineers BUILDING STRONG ® Q AVG US Army Corps of Engineers BUILDING STRONG ® USACE Regional Sediment Management Program Linda.
NAD/SAD REGIONAL DREDGING MEETING/WEDA WILMINGTON DISTRICT
Shorelines 1.
CHARLESTONMOBILE WILMINGTON SAVANNAH JACKSONVILLE US Army Corps of Engineers BUILDING STRONG ® NC Water Resources Congress Christine Brayman Deputy For.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
Coastal Process Chapter 9:. Wave Dynamics Wave length (L)= Distance between crests, Wave height (H) = Vertical distance between the crest and the trough.
Coastal erosion is the wearing away of land or the removal of beach or dune sediments by wave action, tidal currents, wave currents. Costal erosion is.
City of Satellite Beach. Satellite Beach Total area of 4.3 square miles Just over 10,000 residents 98% built out.
San Francisco District San Francisco District Coastal Activities Frank Wu CERB Meeting June 4, 2009.
Mouth of the Columbia River Jetties Major Rehabilitation.
Coastal Processes Analysis for Vilano Beach, St. Johns County, FL Taylor Engineering, Inc. Hande Caliskan, M.Sc. Christopher Bender, Ph.D., P.E., D.CE.
Blind Pass Project Update Bayous Preservation Assoc. February 9, 2011.
USACE Post-Hurricane Monitoring requirements Post-storm assessments of Corps Projects Damage estimates (economic & engineering) Extreme event data – forensic.
US Army Corps of Engineers BUILDING STRONG ® The Nature Conservancy’s Climate, Risk & Resilience 2013 Learning Exchange Col. Richard Hansen U.S. Army Corps.
Folly Beach 1-yr Post-Construction Monitoring Report Nicole Elko, Ph.D. September 8, 2015.
US Army Corps NOAA CSC ERG. The primary focus areas of NSMS are: Erosion and accretion and its causes Environmental implications of shoreline change Economic.
Of An Evaluation of Performance Measures for Prefabricated Submerged Concrete Breakwaters: Section 227 Cape May Point, New Jersey Demonstration Project.
Tracking No Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master.
Erosion on the Great Lakes By: Samantha Lee. The Coast of the Great Lakes Can be in the form of a low laying coastal marsh (which is subject to flooding)
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
World Association for Waterborne Transport Infrastructure (PIANC) and the International Environmental Commission Technical Seminar October 28, 2009 Westin.
Harbors Module NH1: Authorities and Policies. NH1 - 2 BU ILDING STRONG SM Student Learning Objectives Student will be able to:  Describe the Federal.
1 Dark Background Body Slide This background is best for on-screen presentations only—the background shows up best on-screen but uses excessive toner if.
1 RSM through CAP Sec 204/ Implementation issues and opportunities Lynn Martin Institute for Water Resources, USACE
Argus at North Head, WA USA Science for Decision Making Joan Oltman-Shay Chad Budworth Sponsored by: USACE Portland District.
Argus at North Head, WA USA Science for Decision Making Joan Oltman-Shay Chad Budworth Sponsored by: USACE Portland District.
US Army Corps of Engineers BUILDING STRONG ® Dunes Mike Wutkowski Coastal Engineer.
A World of Solutions North Topsail Beach Shoreline Protection Project Phase 1 – New River Inlet Channel Realignment & Beach Restoration NC Water Resources.
Dredging and New Technology for Shoreline Restoration at TOF, Chayvo Beach Sakhalin October 07, 2010 XXIII Международная Береговая Конференция в честь.
The Coast 1. The Sea 2 Wind Waves The Sea 3 TidesCurrents 1.Long-Shore 2.Cross-Shore.
Planning for Non-Routine Activities
US Army Corps of Engineers BUILDING STRONG ® USACE-IOOS Missions, Priorities, Recommendations Linda Lillycrop IOOC Member USACE Liaison, U.S. IOOS US Army.
LESSON 1: INTRODUCTION Approach to Problem. BEACH PROFILE Coastal Processes with Engineering Applications (Dean and Dalrymple)
San Francisco Ocean Beach-Great Highway Erosion Control Project.
Physical Modeling of Nearshore Placed Dredged Material Rusty Permenter, Ernie Smith, Michael C. Mohr, Shanon Chader Research Hydraulic Engineer ERDC-Coastal.
Sc.912.e.6.4 Analyze how specific geologic processes and features are expressed in Florida and elsewhere.
TOPSAIL BEACH 30 Yr Beach Management Plan June 8, 2011.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
C HARLOTTE C OUNTY B EACHES & S HORES A DVISORY C OMMITTEE J ANUARY 7, 2016 C HARLOTTE C OUNTY E ROSION C ONTROL P ROJECT U PDATE.
US Army Corps of Engineers BUILDING STRONG ® And Taking Care Of People! Josephine Axt, Ph.D. Chief, Planning Division Los Angeles District July 10, 2013.
Ch.8 How Waves Move Sediments. Longshore Drift  Longshore drift has a very powerful influence on the shape and composition of the coastline. It changes.
Jessica Respondek Suncoast Chapter Surfrider Foundation.
Sand Dollars Federal Shore Protection Appropriations
11 October 2011 JANE MOON IMPACT OF THE TERMINAL GROYNE ON SEDIMENT TRANSPORT IN MINEHEAD BAY SENIOR GEOMORPHOLOGIST.
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
Inlet Barrier Island OCEAN SHORE ZONE Estuary Beach.
Overview Setback (Ref Point/Erosion Rate/Planning Horizon)
Hunting Island State Park Beach Restoration Project
Continuing Authorities Program
Strategic shoreline placement from coast to coast
Inlet Barrier Island OCEAN SHORE ZONE Estuary Beach.
The Grain Drain ME Dune areas on the continental shelf caused by breaking waves are called sand bars. Boston Waves pile up large deposits of ocean sand.
The Coast: Shoreline Processes
Sacramento Environmental Commission January 2019.
FLAGLER COUNTY, FLORIDA
Presentation transcript:

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District SARASOTA COUNTY – LIDO KEY HURRICANE & STORM DAMAGE REDUCTION PROJECT City of Sarasota Sarasota County US Army Corps of Engineers 22 October 2013 Sarasota, Florida Presented by: Milan A. Mora, P.E. Jason Engle, P.E. James LaGrone Kathleen McConnell BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | JACKSONVILLE DISTRICT Information Presentation BOCC Joint Meeting

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District OVERVIEW – PROJECT SCOPE  Authorized WRDA 1999 Authority was contingent on a feasibility assessment of the project Feasibility Study with Environmental Assessment (amended April 2004) determined that project was technically sound, environmentally acceptable and economically justified. BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District OVERVIEW – PROJECT FEATURES BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District 3 D2 C B Project Scope  Project Length (ft) = 8,280 (R-35 to R43)  Design berm elevation (ft) = +5 NGVD  Approximately 460,000 cy of design and 615,000 cy of advance material (1,075,000 cy for Initial Const)  Three groins along the southern portion  Borrow Areas: Big Sarasota Pass (BSP) & New Pass  5-year nourishment interval over 50-year life  615,000 cy required for each re-nourishment

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District PROJECT PLAN BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District 4  1) Placement: Place approximately 1.1M CY of sand on Lido Key  2) Source: Obtain Sediment for Nourishment of Lido Key Egmont Key (Tampa Bay) Offshore of Longboat Key Ebb Shoal at Big Sarasota Pass (BSP) New Pass – Future  3) Retain: Construct Three (3) groins at the south end of Lido Key

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District PLACEMENT – LIDO KEY BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District 5 MHW Line - Design Berm 2013 MHW Line MHW Line - Advanced Berm FDEP Monument R-39 (Lime Tree Resort/Condos) 150’ 80’ Design 5’ Advanced Berm

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District SOURCE – BSP BORROW AREAS BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District 6 D2 C B

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District RETAIN – SOUTHERN GROINS BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District 7 Retain Beach Nourishment

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District PROJECT PLAN – BORROW AREA QUESTIONS? PROJECT PLAN – BORROW AREA QUESTIONS?

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District BORROW AREAS?  What are the proposed borrow area footprints?  How will this affect Big Sarasota Pass morphology?  How will this affect Siesta Key?  What are the effects on the navigation channel?

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District BORROW AREA FOOTPRINTS D2 C B

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District Flood Marginal Channel Relic Channel Updrift Shoal Main Ebb Channel Distal Lobe Downdrift Attachment Flood Marginal Channel In the long term: These areas will be deeper Existing Conditions

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District % Increase in wave energy here and here % Decrease in wave energy here and here Results from the CMS morphologic model yields No indication of increased erosion over the Existing Condition at Siesta Key HOW WILL THIS AFFECT SIESTA KEY?

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District Navigable water greater than 6m depth without project Navigable water greater than 6m depth with project No significant difference in navigable water depths without and with project EFFECT ON CURRENT NAVIGATION?

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District PROJECT PLAN – SOUTHERN GROINS GENERAL QUESTIONS? PROJECT PLAN – SOUTHERN GROINS GENERAL QUESTIONS?

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District SOUTH LIDO KEY GROINS  What are the plans for the groins? How long are they? How much space is between them? How big are they? Can I walk along the beach? Can I swim in the surf zone? Can I navigate past them?

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District 350’ 500’ 460’ 600’ 800’ 2004 Present Day HOW LONG? HOW MUCH SPACE IN BETWEEN ?

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District HOW BIG ARE THEY?

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District CAN I WALK ALONG THE BEACH?

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District CAN I SWIM IN THE SURF ZONE? CAN I NAVIGATE PAST THEM?

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District PROJECT PLAN – SOUTHERN GROINS HYPOTHETICAL QUESTIONS? PROJECT PLAN – SOUTHERN GROINS HYPOTHETICAL QUESTIONS?

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District What if the groins do not work?  What is the effect on Lido Beach?  What is the effect on Siesta Key?  How will the groins affect the ebb shoal in BSP?  Why nourish the beach if we are installing structures?

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District Downdrift Effects Sediment Bypassing to BSP Ebb Shoal Groins are constructed to anchor the nourishment template – not to intercept Sediment at the expense of downdrift beaches or ebb shoal morphology! WHAT IS THE EFFECT ON LIDO KEY? WHAT IS THE EFFECT ON SIESTA KEY?

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District How will the groins affect the ebb shoal in BSP? Downdrift Effects Sediment Bypassing to BSP Ebb Shoal Adequate sediment bypassing at the seaward end of the groin structures will deter the growth of a crescentic shoreline. Adequate bypassing to the Ebb Shoal ensures that BSP will maintain its morphology – seen by lack of erosion in the shoal itself

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District Why nourish the beach if we are installing structures? Groins are constructed to anchor the nourishment template – not to intercept sediment at the expense of downdrift beaches or ebb shoal morphology! Groin construction without an associated nourishment project can lead to downdrift erosion and a lack of sediment supply to downdrift systems The groins are designed to work with the nourishment design template – should the beach erode shoreward of the design template, Emergency measures are implemented

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District Groins – Anchor the Nourishment Beach Nourishment Retain

BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District BUILDING STRONG ® US ARMY CORPS OF ENGINEERS | Jacksonville District Questions/Discussions Milan A. Mora, P.E. Project Manager Jacksonville District Water Resources Branch 701 San Marco Boulevard Jacksonville, FL LIDO KEY SPP