H2 Layout for EMU a brief report of a couple of visits by Darin A., Jay R., and FG.

Slides:



Advertisements
Similar presentations
P u t y o u r h e a d o n m y s h o u l d e r.
Advertisements

CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
HIE-ISOLDE HEBT: characteristics Beamline diameter: 40 mm (REX: 100 mm) Beamline height: 1.75 m Beamline vacuum: low 1e-7- high 1e-8 mbar Connection of.
LCLS SUT Layout Undulator Magnet and Support Motion Vacuum SystemMotion DiagnosticsMotion Thermocouple New Renderings, Add Thermocouple Labels
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
US Test Beam Results Of Front End Timing T. Ferguson, N. Terentiev* (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25.
1 Daya Bay Muon system Installation Workshop, IHEP, July 14, Updated RPC Gas System Installation Plan Changguo Lu Princeton University.
DAQ&CM Infrastructure Paul Drumm. Issue Space is running out! Power supplies, RF system –Big kit, legislation dictates space requirements (not a clear.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
1 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Daya Bay RPC Gas System Installation Plan Changguo Lu Princeton University.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
T1 hardware Detector Control System, OK several automates have been added, LV and HV sequences. FSM manages transition between Busy, ON and OFF states.
Spencer High School – School Network The Muscogee County School District utilizes a wide area network (WAN) with all school connecting to a data center.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
LABELING PRESENTATION BY WES WILDCAT WILDCAT PRODUCTION.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
AS- CCR Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be added Magnet/infra coordination : Andrea Gaddi Magnet.
Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Ckov status David Lange, Doug Wright LLNL May 4, 2004.
K.Gadow CALICE technical review 1 Move to FNL ECAL/HCAL-Movable Table Setup test beam integration to Fermilab MT6-B3/B4.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Annual Workshop on Crystal Collimation H8 Layout and infrastructure 1October 2010J.LENDARO EN/STI/ECE.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
WG7 summary 5 th RD51 Collaboration Meeting in Freiburg WG7 summary M. Alfonsi (CERN)
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
Layout and conventional facility N.Terunuma KEK. Conventional facility 1 Layout of beam line should be fixed until end of June We have to start.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM June 2008 Electronics WG Report TOTEM Electronics’ Status.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
GSI Test Preparation Visit to GSI october 12 Installation plan agreed
Rack Design Proposal as of 01/03/2013
Integration – preliminary ideas on routing and tests
EMU Slice Test Run Plan a working document.
IT Set-up Plan Corporate Process Innovation Dept. Date: June 2014
Triple-GEM setup at the GIF++
Regional Cal. Trigger Milestone: Major Production Complete
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production & Testing Complete
TileCal ROD Commissioning Counting Room Installation
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
B904 Status Report by Fred B.
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Equipment Management DB Rack Wizard USC55 Underground Counting Room
Prepared for CSC by Fred Borcherding FNAL
CSC Electronics Installation and Commissioning Oct ‘06
CSC Electronics Installation and Commissioning CSCE I&C
PCMB Address Assignments per Station/Rack/Crate
Presentation transcript:

H2 Layout for EMU a brief report of a couple of visits by Darin A., Jay R., and FG

July 2, 2004H2 Layout for EMU2 H2 Layout Available rack space in Bats. HNA360, 363 and possibly 370 (TTC) Desk space available in Bat. HNA363 fast cables between H2 TTCmi/ex rack (HNA370) and available rack space in HNA360. Fast and wireless networks available Gas lines and hook-ups available need to add multiple concrete blocks for the CSC constellation TTCmi/ex PC#1 plus add’l rack space more rack space + room for desks gas pad preferred location of CSCs H2 beam dump magnet HCAL ME1/ 1 beam

July 2, 2004H2 Layout for EMU3 main CSC location concrete block need more of those … cable tray an artist’s impression …

July 2, 2004H2 Layout for EMU4 Gas hook-ups Available space on the mezzanine gas pad Available (and labeled) gas lines Patch panels in the beam area gas padpatch panel

July 2, 2004H2 Layout for EMU5 Open Issues ME1/1 location –directly behind HCAL quantify punch through, but at higher rates? timing issue? PC location likely to be inside the beam area. –in conjunction with the other 3 chambers similar set-up as previous EMU Slice Test compact set-up beneficial for timing TTC setup –install 6U crate close to TTCmi (HN370) use fast cables –split fiber signal and install TTC crate in HN360 Safety requirements regarding the “CSC floor” –too many concrete blocks may block access to a search box behind the beam dump