1 H2 Cost Driver Map and Analysi s Table of Contents Cost Driver Map and Analysis 1. Context 2. Cost Driver Map 3. Cost Driver Analysis Appendix A - Replica.

Slides:



Advertisements
Similar presentations
An Evaluation of MC/DC Coverage for Pair-wise Test Cases By David Anderson Software Testing Research Group (STRG)
Advertisements

1 Requirements and the Software Lifecycle The traditional software process models Waterfall model Spiral model The iterative approach Chapter 3.
©2002 First Consulting Group F I R S T C O N S U L T I N G G R O U P Security HIPAA Tool Training.
OFFICE CHOUM AHMED Microsoft Excel Lesson 04.
Enhancing Data Quality of Distributive Trade Statistics Workshop for African countries on the Implementation of International Recommendations for Distributive.
Chapter 2.
Job Analysis and Rewards
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
1 IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2005.
© 2007 by Prentice Hall 1 Chapter 1: The Database Environment Modern Database Management 8 th Edition Jeffrey A. Hoffer, Mary B. Prescott, Fred R. McFadden.
Information Systems Development and Acquisition Chapter 8 Jessup & Valacich Instructor: Ramesh Sankaranarayanan.
Purpose of the Standards
The Agile vs. Waterfall Methodologies Systems Development:  the activity of creating new or modifying / enhancing existing business systems.  Objectives.
000000_1 Confidential and proprietary information of Ingram Micro Inc. — Do not distribute or duplicate without Ingram Micro's express written permission.
XP New Perspectives on Microsoft Access 2002 Tutorial 71 Microsoft Access 2002 Tutorial 7 – Integrating Access With the Web and With Other Programs.
Standard Costs and Balanced Scorecard
Systems Analysis and Design: The Big Picture
Training Course 2 User Module Training Course 3 Data Administration Module Session 1 Orientation Session 2 User Interface Session 3 Database Administration.
1 Our Expertise and Commitment – Driving your Success An Introduction to Transformation Offering November 18, 2013 Offices in Boston, New York and Northern.
Term 2, 2011 Week 1. CONTENTS Types and purposes of graphic representations Spreadsheet software – Producing graphs from numerical data Mathematical functions.
Module 4: Systems Development Chapter 13: Investigation and Analysis.
The Systems Analysis Toolkit
ITEC224 Database Programming
2 Systems Architecture, Fifth Edition Chapter Goals Describe the activities of information systems professionals Describe the technical knowledge of computer.
StAR web server tutorial for ROC Analysis. ROC Analysis ROC Analysis: This module allows the user to input data for several classifiers to be tested.
SCSC 311 Information Systems: hardware and software.
Examples of different formulas and their uses....
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
This chapter is extracted from Sommerville’s slides. Text book chapter
Markland J. Benson, Computer Systems Manager, White Sands Complex, (575) , Technology Infusion of CodeSonar into the Space.
UT-Reports.
Decision Support Tools. Decision Support: About This Presentation Employee engagement in benefit enrollment decisions is an important part of our enrollment.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
I Power Higher Computing Software Development The Software Development Process.
Chapter 1 Chapter 1: The Database Environment Modern Database Management 8 th Edition Jeffrey A. Hoffer, Mary B. Prescott, Fred R. McFadden © 2007 by Prentice.
 2001 Prentice Hall Business Publishing, Accounting Information Systems, 8/E, Bodnar/Hopwood Systems Implementation, Operation, and Control Chapter.
Systems Analysis and Design in a Changing World, Fourth Edition
Chapter 3: Software Project Management Metrics
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 6-1 Chapter 6 CHAPTER 6 INTERNAL CONTROL IN A FINANCIAL STATEMENT AUDIT.
Module 4: Systems Development Chapter 14: Design And Implementation.
INDIANA STATE LIBRARY 2010 LSTA Grants The Project Budget Worksheet.
BSBCMN205A Use Business Technology Introduction 1 Select and Use Technology.
The techniques involved in systems analysis Explanation of a feasibility study:Explanation of a feasibility study: –economic, –legal, –technical, –time.
1 Database Systems Instructor: Nasir Minhas Assistant Professor UIIT PMAS-AAUR
0 eCPIC User Training: Portfolios Module These training materials are owned by the Federal Government. They can be used or modified only by FESCOM member.
On 15 October The Social Network, a film telling the story of Facebook, is released in the UK.
CASE (Computer-Aided Software Engineering) Tools Software that is used to support software process activities. Provides software process support by:- –
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
City of Dayton Dayton Open Data Fiscal & Budget Transparency Tool User Guide Powered by.
0 eCPIC User Training: A-11 Funding Information These training materials are owned by the Federal Government. They can be used or modified only by FESCOM.
© Prentice Hall, 2007 Excellence in Business Communication, 7eChapter Writing Reports and Proposals.
Library Online Resource Analysis (LORA) System Introduction Electronic information resources and databases have become an essential part of library collections.
+ Lec#1: Planning, Designing, and Operating Local Area Networks 1 st semester CT.
Performance Management and Evaluation 8. Performance Measurement OBJECTIVE 1: Define a performance management and evaluation system, and describe how.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Chapter 1 Computer Technology: Your Need to Know
Application Outsourcing: Achieving Success & Avoiding Risk
System Design, Implementation and Review
The Five Secrets of Project Scheduling A PMO Approach
COST ANALYSIS FOR CONTROL
Software Quality Assurance Software Quality Factor
CLINICAL INFORMATION SYSTEM
Systems Analysis and Design
Project Management Process Groups
Job Analysis CHAPTER FOUR Screen graphics created by:
Tutorial 7 – Integrating Access With the Web and With Other Programs
Management Information Systems: Classic Models and New Approaches
Agenda The current Windows XP and Windows XP Desktop situation
Internal Control Internal control is the process designed and affected by owners, management, and other personnel. It is implemented to address business.
Presentation transcript:

1 H2 Cost Driver Map and Analysi s Table of Contents Cost Driver Map and Analysis 1. Context 2. Cost Driver Map 3. Cost Driver Analysis Appendix A - Replica of Cost Driver Map Appendix B - Collection, Classification, Industry Comparatives

2 1. Context This tool was created as part of a telecommunications Analysis, with no red issue and a client of questionable enthusiasm. The intention was to capture overall cost information in one easily reviewed presentation format. With 46 systems in 9 major families, tended by organizationally and geographically dispersed groups, the complexity of the situation lent itself to a full-size wall display, described below. The cost collection and analysis required to develop the display is also discussed.

3 2. Cost Driver Map The purpose of the Cost Driver Map was to: - visually display overall spending by activity for each major system family - aggregate costs by system and activity - estimate "hidden" systems costs - show the major organizational units that spend system dollars - identify areas of opportunity by system and activity Major features of the Map include: - showing the level of spending for each system and each activity for the three major organizational units - indicated by colored squares within the matrix - providing total spending by system and activity- something that the client was not aware of - providing a framework for how $ are spend - indicated by the rows and columns as well as by summary pie charts placed next to the matrix - a list of assumptions for cost allocations made -highlighting areas to investigate for improvement - indicated by eyeglasses placed within the body of the map The Cost Driver Map was a visual matrix representation of the spending by activity (development, maintenance, support, processing), for each of the relevant system families. A Cost Driver Map can be created when cost information is either available or collectable by system (the major determinant of collectability is whether individual system data is available from the data center). The Cost Driver Map (shown in Appendix A) was used during presentations to frame the total cost bucket as well as lead into the opportunities for improvement.

4 3. Cost Driver Analysis The cost driver analysis provided the basis for the development of the Cost Driver Map. The analysis, required to develop a system support business case, was driven from the financial framework. Costs were determined for each category on a system-by-system basis through project manager/lead interviews and client documents Once costs were collected and classified, comparative percentages were applied to determine a range of cost savings possible. This range provided an overall framework for the benefits included in the business case.

Appendix: A Replica of Cost Driver Map

6 How are we spending our dollars? Who is paying for systems? What are the toal cost? Requires further investigation Cost Driver Map Example

Appendix B:

8 Appendix B contains a description of the aspects of collecting and classifying costs, as well as the use of industry comparatives to develop cost saving opportunities. –Appendix A: See attached file called Sample Cost Driver Map –Appendix B –Systems Cost Analysis –Collection and Classification The two most important aspects of the cost driver analysis are completeness and classification.

9 Appendix B: Completeness Completeness is the art of collecting all the costs associated with systems. In most environments, less than 1/2 the costs of systems is accounted for directly. The other 1/2 represents hidden costs - a major source of opportunity. If possible, costs should be collected for at least two previous years plus the current year's budget. In this analysis, only data for the prior year could be analyzed because data came from a variety of sources and organizational changes made year-to-year comparison difficult.

10 Appendix B: Spending Census The Spending Census, an IT discipline document, is being constructed to ensure that all systems costs are considered in the financial framework. A key completeness check for systems costs is that technology, personnel, and outside service charges have been considered for each category of costs (see below).

11 Appendix B: Classification Classification is the art of grouping I/S costs into categories that foster comparative analysis and recommendations. Presently, the key classifications are IT Planning and Support, Systems Development, Maintenance & Enhancements, Production, User Support and End User Computing. Every systems cost should be separable into one or more of these categories. Depending on the engagement, Maintenance and Enhancement may need to be separated into Adaptive, Perfective and Corrective Maintenance, defined as follows:

12 Appendix B: Definitions - I/T Planning and Support - All costs associated with I/T strategic planning, administration and support - Development - All costs associated with creating a system that allows the capture of new data (see Adaptive Maintenance) - Maintenance & Enhancements - All costs associated with modifying and/or enhancing existing systems - Adaptive Maintenance - All costs associated with adding/changing system functionality. The major difference between new development and adaptive maintenance is the amount of new data the system is capturing. If the amount of new data is significant, then the system is new development; if not, the system and associated costs should be classified as adaptive maintenance. Clients will often categorize projects as new development simply because they have a dedicated development team for the project. - Perfective Maintenance - All costs associated with upgrading versions of hardware/software based on vendor releases - Corrective Maintenance - All costs associated with fixing bugs in existing systems - Production - All costs associated with operating or processing systems. Primarily data center costs plus hardware purchases for minicomputers and peripheral hardware outside the data center. It is often difficult to separate production costs from end user computing costs. The most important differentiator is the percentage of the cost dedicated to accessing shared and structured data versus accessing either personal or unstructured data. - Systems Support - All costs associated with assisting and/or training system users. This number is often difficult to obtain since support can occur almost anywhere in the organization. - End User Computing - All costs associated with the installation and support of tools that allow users to increase their personal productivity. This includes the network costs that enable users to exchange data and electronic mail messages. This number is also difficult to collect.

13 Appendix B: Industry Comparatives Industry Comparatives can then be used to develop cost saving opportunities. The first comparative, M&E/P, expresses Maintenance and Enhancement spending as a percentage of Production. The cross industry average is 38%. Therefore systems (or systems organizations) with M&E/P > 38% should be investigated to determine the extent of cost saving possible.

14 Appendix B: percentage of Production spending The second comparative is Support as a percentage of Production spending. The cross industry average is 14%. Again, if S/P > 14%, further investigation is required.

15 Appendix B: dropdown percentage The third comparative is the development dropdown percentage. This compares development in year n with the increase in production from year n to year n+1. The cross industry average is 45%, which means the total production costs in year n+1 should increase by 45% of the development cost in year n. Again, if >45% the difference should be investigated.

16 Appendix B: project future system support spending It is possible to project future system support spending if reasonable estimates for future development plus growth in planning and end-user computing spending can be derived. The cost saving opportunity can be determined by showing the future cost of maintaining current percentages vs. migrating current percentages to cross industry average.