SCOPE India Post IT 2012 is a Rs 4909 Cr Project

Slides:



Advertisements
Similar presentations
Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
Advertisements

New initiatives in India Post An overview.2.1. The way ahead IT modernization project – India Post 2012 which is aimed at providing robust IT solution.
How to commence the IT Modernization Process?
Course: e-Governance Project Lifecycle Day 1
JAIPUR 16 DEC 08 TECHNOLOGY FOR FINANCIAL INCLUSION Indian Institute of Banking & Finance N D RAO.
EForms and Service Delivery through State Portal & SSDG Kavita Bhatia.
Presentation on IT Modernisation Project
DEPARTMENT OBJECTIVES 1. To Identify and deploy information technology to meet business objective at CKPL. 2.To Provide support to users for systems usage.
Core Banking Project. What is Core Banking Solution? Core Banking Solution (CBS) is networking of branches, which enables Customers to operate their accounts,
By Vinod Kumar IAS Commissioner Land Records & Settlement, Madhya Pradesh December 15-17, 2009, New Delhi Enterprise WebGIS Solution for Managing Land.
Principles and Learning Objectives
Active Directory Production Pilot Project Department of Administration Enterprise Technology Services (ETS) ETS is a customer based team that provides.
Fundamentals of Information Systems, Second Edition 1 Electronic Commerce and Transaction Processing Systems.
Discovering Computers Fundamentals, 2011 Edition Living in a Digital World.
Managing the Information Technology Resource Jerry N. Luftman
Electronic Commerce and Transaction Processing Systems
MIS and interpreting data. What is MIS?- A management information system (MIS) provides information that is needed to manage an organization efficiently.
D I G I T A L I N D I A Digital India INDIA POST - Shimoga Division A programme to transform India into a digitally empowered society and knowledge economy.
School Solutions.  History & Organization Structure.  AKADEMIKA Team.  Our Strengths.  Modernization of Schools & Role of AKADEMIKA?  Our Services.
Data Centers and IP PBXs LAN Structures Private Clouds IP PBX Architecture IP PBX Hosting.
Understanding IndiaPost INDIA POST – VISION & MISSION Our Vision “India Post’s Products and Services will be the customer’s first choice”
India Post 2012 Vision How Vision 2012 Helps ?
New initiatives in India Post An overview.1.1. The way ahead Project Arrow – Making Post Office the window to the world for the common man Mail Network.
Enterprise Architecture
Department of Posts Overview of IT Modernisation Project
ERP Raghunath M D BSNL Mobile Services, Ernakulam, Ph:
EPayment ePayment Introduction It is the process of electronic transfer of bill data between booking and payment office Department of Post collects.
IT Modernisation Project (India Post 2012)
1 IT Governance 2006 Strategy/Business Case Presentation Department of Human Services.
Corporate Profile Contact Arvind Verma
MIS reports An introduction 1.1. Introduction Department of Post provides access to transaction MIS on various products This helps operations to track.
Facilitator Notes: Explanation: NA More Information: NA Facilitation Tips: Discuss the general rules to be followed during the classroom session and explain.
National Electronic Health Records (e-Health) Dr Fawzi A Amin MBBch, FPC, MPH, PhD. Consultant Family Physician Kingdom of BAHRAIN.
ENAM ENAM - INFRA Project 2013.
21 – 22 September 2006, Kuala Lumpur Savings Banks and Foundations, contribution for a sustainable society Mr. Santosh Khanolkar, Platform Strategy Advisor.
New roles in Technology Migration issues – Rule of PO 2.7(b)1.
" Ensuring Services, Empowering People “ Bihar Right To Public Services Act, Sandip Shekhar Priadarshi Admimistrative Officer BPSM General Administrative.
GENERAL BANK MANAGEMENT Technology Management
Department of Posts Presentation to Unions Dak Bhavan 23 rd November 2010.
India Post India Post's products and services will be the customer's first choice.
Agenda 08:00 - Guests Arrive / Breakfast 08:30 - Paul Masterton: Objectives for the day 08:40 - Ian Gorst: The incentive to reform 08:55 - Mike King:
India Post. April 2010 Slide 2 Recent E-Governance Projects  MCA 21  Income Tax Department  Passport Department  State FMS - Treasury  Other Large.
Roadmap to successful ECM implementation Kateřina Divišová British Chamber of Commerce
Corporate Presentation 1.  Incorporated in the year 2000  Primary focus on Networking /IT Solutions & Services  One of the respected System Integration.
7-1 Management Information Systems for the Information Age Copyright 2004 The McGraw-Hill Companies, Inc. All rights reserved Chapter 7 IT Infrastructures.
Disbursements Through Post Offices. Departmental Employees 2,09,047 Gramin Dak Sevaks 2,57,856 Area per PO sq Km Population per PO 7184 Postal Network.
Hosted Voice & Hosted Contact Center
ECOTRADE AN ECOWAS ICT INITIATIVE TOWARDS GREATER TRADE FACILITATION A Presentation Of : The ECOWAS Computer Centre, Abuja, NIGERIA.
1 TEMENOS HOME Global Conference on Access to Finance Washington DC 30 th and 31 st May 2006 Murray Gardiner.
© Xplore Solutions. All rights reserved
Technology Services Division Rebecca Stilling Deputy Director.
C1 India Leader in e-Procurement. About us Industry Leader in e-Procurement since 2000 Pioneer in providing e-Procurement as SaaS Implemented some of.
Transition from Phase I to Phase II : The resource requirement estimation for Phase II of the Project should be so done that all the pending tasks of the.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Copyright © 2013 OneNeck IT Services Corporation. All Rights Reserved. 1 Cloud Enablement For Microsoft Dynamics Cloud Enablement for Dynamics AX and Use.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
BMS Solutions Co. focused in Education domain with a mission of Implementing Transformational Educational Program worldwide BMS represents various products.
Design and Implementation of Financial Management Information Systems (FMIS) Cem Dener June 14, 2011 Washington, DC Design and Implementation of Financial.
Scales Technology FZCO
CSI - SMART Business NUF Thursday 17th November 2016.
TECHNOLOGY FOR FINANCIAL INCLUSION
Digital public procurement
Discovering Computers 2010: Living in a Digital World Chapter 14
UCL’s Information Strategy & implementation plans
IOT Critical Impact on DC Design
Information Technology (IT) Department
Procurement Management Information System (PMIS)
By Jeff Burklo, Director
Cloud Consulting Services and Solutions
Presentation transcript:

Department of Posts Overview of IT Modernisation Project (Indiapost 2012)

SCOPE India Post IT 2012 is a Rs 4909 Cr Project This includes Operating expenses for 5 years Project will be implemented through eight RFPs FSI----POSB, PLI & Enterprise Content Mgmt System (is a Mgmt Tool, Integrates silos & Info Content in silos to give a unified picture) CSI---POS, Daily Account, Call Center, Help Desk, HR & A/c, Mail & Logistics, Business Process Mgmt & Workflow, Business Intelligence, Brain of the Postal System which integrates all SIs RSI—MGNREGA, POSB, eMO , application for rural device Rural Hardware ------1,30,000, Laptop, HH Device, Smart Card Reader, Solar Panel, Battery with Backup, Thermal Printer, Biometric Reader Data Center & Disaster Recovery Center NSP-----Primary & Secondary Mail Office Hardware Including 15,000 Postman Handheld Device Change Management

COMPUTERISATION STATUS All Departmental Post Offices provided with computers 24,969 Total no. of GDS POs to be computerized in the IT Project------1,30,000

India Post 2012 Vision How Vision 2012 Helps ? Offer New Products and Services Empower Rural Infrastructure Increase Market Share and Revenues Deliver Improved & Consistent Customer Service Drive high Employee satisfaction To Be A Technology Enabled, Self Reliant Market Leader 100% post offices computerised / networked IT based products are more attractive to today’s customers Scope for business expansion & revenue growth Multitude of new/improved products/ facilities (e.g. eGovernance, Rural ICT, Cash Ttransfer, SS Payments, eCommerce, NEFT, RTGS, ATMs, CBS, Anytime-Anywhere Banking, Net Banking, Mobile Banking etc ) Rural customer transactions will be more transparent, secure and less cumbersome India Post Employees proud to be part of tech driven organisation at par with the best in industry, banking and financial services 4

Overview of IT Solution Customer Interaction Channels Rural ICT* Solution Setting up IT Infrastructure – Data Centre / Connectivity Web Portal (e-Commerce) Mobile Banking ATMs Call Centre Mail & Retail Operations Postal Banking Postal Life Insurance HRMS & Payroll Finance & Accounts MIS Reporting / Business Intelligence / IT Security India Post Data Warehouse *Information & Communication Technology

Project Overview Network connectivity to all Departmental Post Offices Shared Data Centre for hosting applications Mail Office Hardware Data Centre Facility RFP Network Integrator RFP MoH RFP Infrastructure Postal banking and insurance services Mail Operations & Logistics Enterprise Resource Planning solutions for F&A, HR & Payroll. Customer Interface- ATM, Call Center, Portal Reporting and Analysis to assist in decision making FSI RFP Core SI RFP Applications RICT –SI RFP RICT-RH- RFP Rural Systems Rural handheld devices MGNREGS, eMO /iMO applications All the other Postal, Financial and e-Commerce services on the rural device Enabling change and stakeholder engagement Training, re-skilling, Capacity building to facilitate new processes and process changes Change Management RFP People Management

Benefits to Government Impact Areas Countrywide financial inclusion particularly in rural areas Effective delivery of MGNREGS DBT, & Social Security Schemes Faster , transparent and more reliable postal services Faster and Transparent financial services Multiple channels of access for customer like ATM, mobile banking, net banking, NEFT, RTGS Last Mile IT network connecting more than 1,55,000 post offices Improved delivery of Govt. schemes in Rural Areas Improved quality of service Reduction in operations cost New products and services based on IT enablement Faster and better decision making based on on-line data availability Benefits to Citizens Benefits to Government Benefits to DoP

Current RFP Status RFP Name Status Remarks Financial System Integrator Project Kicked off on 28th Sep’12 and Vendors On-board FSI – Infosys NI – Sify CM - TCS Cbs is rolled out in 540 offices McCamish rolled out in 2156 office Sify rolled out in 23000 offices Network Integrator Change Management Data Center Facility Data Center completed & handed over on 3. 4.13 DC - Reliance Rural System Integrator (RSI) Contract signed but T to be synchronized with RH RSI - Infosys Rural Hardware (RH) Evaluation Core System Integrator (CSI) Project kicked off on 15.4.13. CSI – TCS Mail Operations Hardware (MOH) Contract under finalization stage Update the figure whenever new change management vendor updates are received

Project Timelines Implementation Phase O&M Phase 2012 2013 2014 2015 RFP Completion Date 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Q1 Q2 Q3 Q4 H1 H2 CM Jul’   RSI May’ FSI Feb ’ 2019  CSI May’ 2019  RH Apr’ 2019  NI Jul’ 2019  DCF  Mar’ 2018 MoH Nov’ 2018  Implementation Phase Implementation Phase O & M Implementation Phase O & M Implementation Phase O & M Implementation Phase O & M Implementation Phase O & M Implementation Phase O & M O & M Implementation Phase O&M Phase

Implementation Phases & Roll out plan Project phases: The entire project to be implemented in three phases in the following manner: Pilot Phase Phase 1 Phase II Pilot Phase: 8 Pilot circles identified for the roll out of Pilot phase, namely- Assam UP Rajasthan Maharashtra Karnataka Tamil Nadu Delhi AP Circles The Pilot stage would be rolled out in identified Post Offices in the 8 Pilot Circles. After which the solution will be modified / improved based user feedback. Roll out Phase : Thereafter Phase I roll out would commence in the Pilot Circles For CBS, Phase I will include all the HOs in the country . Phase II will involve the roll out in all the 22 Circles in 18-20 Months from commencement.

1. Data Centre Facility The overall scope includes: Data Center Providing Data Centre for hosting Department’s Primary Data Centre . The Vendor will provide the space, services and facilities Servers will be installed by the concerned SIs Connectivity & related Hardware will be provided by the NI vendor The Primary DC will also house the Department’s Network Operating Centre (NOC), which will be manage by NI The Data Center located at the M/s Reliance’s facility at Navi Mumbai Disaster Recovery Center (DRC) To be housed in Department’s own building at CEPT Mysore The Vendor will provide Services and Facilities & manage the DRC Servers will be installed by concerned SIs Connectivity & related Hardware will be provided by the NI vendor The DC vendor will build, operate and transfer Disaster Recovery Centre ( at PTC Mysore) to meet DoP requirements Operations and maintenance of DCF (Data Centre Facility) and DR Site for a period of 5 years 24x7 onsite support as per SLAs

2. Core System Integrator The Core System Integrator will implement the solutions for Mail Operation, Retail, Logistics Post, Philately, Finance & Accounts & Human Resources The overall scope includes: Installation of central hardware at DC & DR locations Software applications for Mail, HR , F&A solutions Multiple customer interaction channels i.e. Point of Sale Counters, Portals, Mobiles, Call centre Rural ICT Client application for Point of Sale, Mail Operations and F & A Integration of solutions brought by other SIs with the overall solution architecture Set-up and operation of Call Centres for customers covering all aspects of DoP’s business. Centralized help desk for employees for managing issues related to operations. Help Desks First Level Help Desk (L1) will be provided by the respective SIs for an initial period of one year. Thereafter CSI will takeover the Helpdesk operations. Level 2 & Level 3 Help desks, which will provide detailed technical help will be provided by the respective SIs.

3. Financial Services Integrator The FSI vendor will implement the solutions for Core Banking and PLI in all Post Offices and provide Multiple delivery channels- internet, IVR, Mobile, ATM & SMS. The overall scope includes: Installation of central hardware at DC & DR locations Software applications for Core Banking & PLI solutions Data migration from Sanchay Post & NIC PLI application to new system Installation & Management of Department’s ATMs at 1000 locations. Setting up of Central Processing Centers (CPCs)- One each for 22 Circles in the case of Core Banking Setting up of CPCs for PLI – 1000 Nos. Rural ICT Client application for Core Banking & PLI Training DoP resources on the new solution Operations & maintenance for 5 years RTGS- real Time Gross Settlement min – 2lakhs amax no limit- through RBI bet 9 to 16 30 on working days and sat upto 2 pm . IFSC code is mandatory Individual transmission NEFT national electronic fund transfer- work in batches. That is the basic difference

Postal Banking Solution(CBS) clearing Savings Accounts Deposits Charges CBS Rural ICT Devices Enterprise GL Enterprise General Ledger – Comprehensive financial management solution mobile IVR internet ATM NEFT CRM POS others

4. Network Integrator The Network Integrator will link all Departmental Post Offices, Administrative office, Account offices, Sub Divisions etc. (~ 30,000 locations) though one single WAN. The overall scope of NI includes: Planning and design of the entire Network . Connectivity for each location from 2 different network service providers in order to ensure uninterrupted network connectivity. Installation of Network Hardware, i.e. Switches & Routers at each location including the Data Center & DRC. NI will bring a secure network having all security features; application integration requirements; & intermediate transition needs Program Management of entire Network Integration implementation and Operations and maintenance of entire DoP Network environment for 5 years Network Management Tool and process will be setup by NI for managing the entire network including setting up a Network Operations Centre, (NOC) at the Primary Data Centre site, which will be operational 24 x 7

5. Rural ICT Solution: Rural SI and Rural Hardware The Rural ICT Solution is being implemented through two distinct sub-projects- Rural ICT System Integrator (RSI); Rural ICT Hardware (RH); Rural ICT Hardware: The vendor will supply the hardware, network connectivity & solar panels to ~ 1,30,000 Branch Offices. Depending on Workload, BOs will be supplied with either Handheld Mobile Devices or Netbooks Each Device will have standard peripherals like Biometric Identification device, Camera, Thermal printers, 2D Scanner along with Solar Panel The Devices will be mobile and the vendor will also provide a box/bag for carrying the devices and peripherals. A spare battery will be provided to ensure that at least one charged battery is available. RH Vendor will also provide Connectivity for the Devices. Operations and maintenance support for 5 years 10% Critical reserves of inventory will be maintained at Divisional Levels to ensure immediate replacements in case of faults in hardware.

6. Rural ICT Solution: Rural SI and Rural Hardware RFP Rural ICT System Integrator: Rural System Integrator (RSI) will provide the software solutions relating to MGNREGS, eMO & Integration of EDOs for Rural ICT devices. Installation of central hardware at DC & DR locations Software applications for MGNREGS & eMO , for Rural ICT Devices (client applications) Development of a SDP (Service Delivery Platform)which acts as a gateway to rendering the client applications on Rural ICT devices. This will ensure device neutral client application development. Data migration from Sanchay Post to new system Training through “Train the Trainer approach” - where 4000+ employees of DoP will be trained by RSI who will in turn train 130000+ GDS Operations & maintenance during the contract period Client application in multiple languages Support for the application is expected to be available in atleast 11 languages

Rural ICT Solution Overview Handheld Computers Biometric Scanner Thermal Printer 2D Imager Devices Smartcard / Mag Stripe Reader and Writer

7. Mail Operations Hardware The overall scope includes: Supply of procurement of Mail Operations Hardware for all Mail Offices & TMOs The Hardware will include desktop computers, printers, barcode scanners, weighing scales, tag printers, Power back up devices Supply of 15,000 departmental postman with handheld devices including maintenance and operations of the hardware Maintenance and operations of the hardware during the tenure of the contract Hardware to be supplied to the different offices, located in different parts of India on demand basis MOH vendor will also provide the hardware with latest software / operating system and coordinate with the other System Integrators viz. CSI, FSI, Network Integrator to provide the necessary assistance for successful installation, integration and functioning of all applications

8. Change Management Change Management: The scope includes an integrated CM approach encompassing: Stakeholder Management to align all stakeholders to the program objectives & understanding their concerns at the Directorate, C O, Region, Division, H P O & GPO Change Readiness Survey for assessing readiness to accept change. The survey is planned in 4 cycles with atleast at least 20000 responses in each cycle Developing Change Network leaders in the Circle/Region offices and will comprise of 5 to 10 senior stakeholders from each Circle and Region office of DoP Conducting Change Management workshops – 2 workshop at each Circle HQ/ Regional HQ Communication and Awareness for engaging and informing employees about the changes Capacity Building Plan etc. Training: Preparation of training plan for all solutions and Training coordination with all vendors in respect of their training components. In order to ensure that the training is targeted and received by the right recipients high level coordination with circles/ regional authorities is required.

Access to Change Management web site www.indiapost.gov.in  employee corner Indiapost Project Recent developments about Indiapost 2012 will be upated

Change Management web site

Assignment Divide the class into four groups Group-1 -- Discuss the impact of mail solution on the functioning of HO’s, So’s, BO’s , RMS and mail processing centres in the department after the implementation of the project

Group 2: discuss the impact of HRM solution on the functioning of HO/SO, administrative units and F and A in the department.

Group 3 Discuss the impact of Postal banking in the operations of HO/SO/BO . What are the benefits envisaged for the customers

Group 4 Discuss the change in the operations in field after implementation of the IT 2012 project. What are the benefits expected out of the project for the department and for the public. How the project will help to achieve the vision and mission of the department.

Thank You