San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake
San Francisco – Oakland Bay Bridge Yerba Buena Island San Francisco Oakland
Cantilever Truss Spans (E1-E4) 504 Feet Span Steel Trusses (E4-E9) 288 Feet Span Steel Trusses (E9-23) Main Sections of Existing SFOBB for Dismantling YBI Detour (E1-Tunnel)
The Cantilever
Quality Schedule Cost
Leadership is Present and Strong
Cantilever Truss Spans (E1-E4) 504 Feet Span Steel Trusses (E4-E9) 288 Feet Span Steel Trusses (E9-23) Main Sections of Existing SFOBB for Dismantling YBI Detour (E1-Tunnel)