Project 2010-17 Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization/Mitigation Proposal
Advertisements

Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Questions about AVR & PSS
Bulk Electric System Definition Task Force Update Joint Standing Committee Meeting October 21, 2010 Brian Theaker, BESDTF Chair.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2010 Brian Theaker BESDTF Chair.
NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee July 2014.
Kenneth Wilson WECC Staff
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Revised Event Analysis Process Event Analysis Subcommittee (EAS) Process Update Team (EUT) Hassan Hamdar – FRCC Reliability Engineer, EAS Vice-Chair FRCC.
PER
FRCC Fall Compliance Workshop October , 2013
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
RFC Webinar June 17, 2009 Presented By: Mark Kuras Chair, UFLS SDT.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
Generator Governor Frequency Response Alert
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
1 FRCC Compliance Organization and Entity Registration 2008 FRCC Compliance Workshop.
Critical Infrastructure Protection Update Christine Hasha CIP Compliance Lead Advisor, ERCOT TAC March 27, 2014.
Topics to Cover Interconnection Process Overview
Ontario Overview Dave Short Senior Regulatory Analyst, Regulatory Affairs IESO’s ERO Workshop – June 28, 2006.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Summary Overview: MADRI Model Small Generator Interconnection Procedures Prepared by Brad Johnson* June 15, 2006 ACN Energy Ventures
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
NAESB MEASUREMENT AND VERIFICATION MODEL BUSINESS PRACTICE RETAIL ELECTRIC DEMAND RESPONSE NARUC update 9/14/09.
Project Definition of Bulk Electric System Presenter: Peter Heidrich – Drafting Team Chair Date: March 1, 2011.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Status Report for Critical Infrastructure Protection Advisory Group
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Project Real-time Monitoring and Analysis Capabilities Mark Olson, Senior Standards Developer Texas RE NSRS October 5, 2015.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
Project – Alignment of Terms WECC Joint Meeting July 15, 2015.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
IEEE Activities in Smart Grid & Green Technologies Dr. Bilel Jamoussi South Africa 26 October 2009.
Standards Review Subcommittee Update August 17, 2010.
COMPLIANCE UPDATE ERCOT ROS Meeting April 9, 2002.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
Distributed Generation Registration June 30, 2008.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com MOD GENERATOR TESTING REQUIREMENTS RESOURCE PLANNERS LeeAnne Uhler, Regulatory.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
Reliability Standards Development Plan David Taylor Manager Standards Development Standards Committee Meeting June 12-13, 2008.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Reliability Subcommittee Report Vishal C. Patel (RS Chair) PCC Meeting La Jolla, CA- March 22, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
Real Property Policy Update Planning and Development Committee August 4, 2015.
Retail Metering Working Group Progress Report 08/15/07.
NERC Reliability Readiness The Next Steps
August ICA Agenda Time Topic 8:00 – 8:15
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
Rachel Coyne Manager, Reliability Standards Program
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Reliability Standards Development Plan
Integration of Variable Generation Task Force (IVGTF): Status
Coordinate Operations Standard
Project Definition of Bulk Electric System
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
Presentation transcript:

Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair

Topics  Standard Drafting Team (SDT) Accomplishments  1 st Posting for Formal Comments  Bulk Electric System (BES) Definition Significant Revisions  Technical Principles Concepts  Bulk Electric System Rules of Procedure (BESROP) Update  Short-term Project Milestones 2

SDT Accomplishments/Planned Activities  Industry-Wide Joint BES/ROP Webinar (May, 2011)  SDT Activities Meetings Conference Calls Future Meetings  Industry-Wide Joint BES/ROP Webinar (Concurrent Posting) 3

4 1 st Posting for Formal Comments  BES Definition Comments from 279 different people from 213 companies representing 10 of the 10 Industry Segments

BES Definition Significant Revisions 5  Exclusion of Local Distribution Facilities  Generation Threshold Values  Local Networks (High Voltage Limit)  Reactive Resources

Exclusion of Local Distribution Facilities 6 Bulk Electric System (BES): Unless modified by the lists shown below, all Transmission Elements operated at 100 kV or higher and Real Power and Reactive Power resources connected at 100 kV or higher. This does not include facilities used in the local distribution of electric energy as established by applicable regulatory authorities. Core Definition

Generation Threshold Values BES Designation Criteria Inclusions: I2 - Generating resource(s) located at a single site with aggregate capacity greater than 75 MVA (gross aggregate nameplate rating) including the generator terminals through the high-side of the generator step-up transformer(s) connected at a voltage of 100 kV or above. 7 BES Designation Criteria

Local Networks (High Voltage Limit) BES Designation Criteria Exclusions: E3 - Local Networks (LN): A group of contiguous Elements operated at or above 100 kV but less than 300 kV that distribute power to Load rather than transfer bulk power across the Interconnected System. LN’s emanate from multiple points of connection at 100 kV or higher to improve the level of service to retail customer Load and not to accommodate bulk transfer across the interconnected system. 8 BES Designation Criteria

Reactive Resources BES Designation Criteria Inclusion: I5 –Static or dynamic devices dedicated to supplying or absorbing Reactive Power that are connected at 100 kV or higher, or through a dedicated transformer with a high-side voltage of 100 kV or higher, or through a transformer that is designated in Inclusion I1. 9 BES Designation Criteria

Reactive Resources BES Designation Criteria Exclusion: E4 – Reactive Power devices owned and operated by the retail customer solely for their own use. 10 BES Designation Criteria

11  Exception Process Technical Principles Comments from 75 different people from 45 companies representing 8 of the 10 Industry Segments 1 st Posting for Formal Comments

12  Reliability benefits of an Element cannot be determined by a single study or analysis of a single parameter.  Not feasible to establish continent-wide values and/or limits. Exception Process Technical Principles

13  The SDT has adopted a new approach: Targeted questions for Transmission and Generation addressing the Facility characteristics with guidance on the type of supporting evidence to accompany request. No hard numbers to guide the evaluation of the request. Engineering judgment will be utilized by common Regional panels to perform the evaluation of the evidence in an open, repeatable and transparent process. Exception Process Technical Principles

DRAFT BES Rules of Procedure Process Objectives  ROP Process spells out: Who to file a request with When to file a request and expect a response How to file a request and what to include Who decides based on technical justification How consistency is assured 14 BES Exceptions (linked to BES Definition Designation Criteria)

BES Rules of Procedure Team Update  The Rules of Procedure Team produced a draft procedure document that would be incorporated as an appendix to the Rules of Procedure  This procedure document was posted for an informal 30-day comment period to obtain industry input ending June 10 th. 15

Industry Input  The posted Rules of Procedure exceptions process received comments from 176 different people from 131 companies across all 10 industry segments in Canada and the US.  There is strong support for a bright-line definition with an associated exception process. 16

Industry Input  There is a strong desire for a process that is more efficient than the one presented in the draft in two aspects: 1) greater clarity in the process and timelines for process steps, and 2) help in determining the status of an element by application of the definition.  The ROP team is considering the comments received and will produce a proposed amendment to the Rules of Procedure for a 45-day formal comment period concurrent with the posting of the BES definition in early September. 17

Near-term Project Milestones  Concurrent Posting Periods (Sept./Oct. 2011) Revised BES definition with exception criteria (inclusions and exclusions) BES Definition Exception Process Technical Principles to support request for BES Definition Exception  Industry Webinar 18

Question & Answer Website: 19