1 Objective  Extend NEWater transmission mains to Jurong Island to meet increasing NEWater demand by industries Scope  6 Contracts - 11.4km of 2.2m,

Slides:



Advertisements
Similar presentations
Jubail Industrial City A $45 Billion Super Project
Advertisements

1 Interstate Pipeline Gas Quality Primer Business Practices Subcommittee June 15-16, 2004 PIPELINE SEGMENT Wholesale Gas Quadrant North American Energy.
Dublin Port Tunnel Xiaowei Jin, Xinni Wang, Mingqiu Mao.
GTI’s Composite Materials (CM) Program
1 Scope 1.18km of sewers (500mm to 3000mm dia) 2.2 lift stations 3.Demolition of 4 pumping stations – Jurong West, Jalan Bahar, Corporation and International.
GulfSafe Notification System GULF
 Prepared for  City of Palm Coast, Florida  April 28, 2015 Stormwater Detention Facilities for City-Wide Stormwater Management Master Plan.
Colorado Springs’ ASR Program Presented by Cortney Brand Western Water Workshop, Gunnison, CO July 28, 2005.
Nunavut Water Board Public Meeting Water Licence Amendment Rankin Inlet 3AM-GRA-1015 January
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Water Resource Activity The idea is that the students are split into smaller groups, 5-8 in each group. Each group is given a copy of all the images (cut)
Nexans experience in deployment of sensors in subsea cable systems
PUB, Singapore’s national water agency
TRENCHLESS TECHNOLOGY
 Definition  Be open to new ideas and never be trapped in the past  While we cannot forecast change in an increasingly volatile environment, we can.
Imagine the result European Infrastructure Friedrich Schneider, Executive Board Member August 4, 2010.
Nord Stream: a Major European Infrastructure Project – Status and the Way Forward > Henning Kothe, Project Director Nord Stream AG Moscow, 27 th of June.
Singapore at 50: Oil and Water – Inextricably Mixed Ron Oxburgh.
Doing Business in India NABC 2006 Houston By Ankur Gupta 29 th June, 2006.
PRESENTER’S NAME DATE Using Smartphone to carry out Risk Assessment HY/2012/07 – Tuen Mun Chek Lap Kok Link – Southern Connection.
1 OM, Ch. 9 Supply Chain Design ©2009 South-Western, a part of Cengage Learning SUPPLY CHAIN DESIGN CHAPTER 9 DAVID A. COLLIER AND JAMES R. EVANS OM.
CE 3372 WATER SYSTEMS DESIGN LECTURE 004. OUTLINE Branched Systems Looped Systems Network Analysis Hydraulic modeling.
GAUTRANS DEPARTMENT OF PUBLIC TRANSPORT, ROADS & WORKS Job Creation, Skills Development and Empowerment in Road Construction Rehabilitation and Maintenance.
IDENTIFYING COMPETITIVE ADVANTAGES Three common tools used in industry to analyze and develop competitive advantages include: – Porter’s Five Forces Model.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Quo Vadis? Issues and Opportunities for Australian Infrastructure Marko Misko Partner, Construction and Major Projects, Clayton Utz 20 September 2012.
25 th September, 2008 Gas Infrastructure & Allied Issues 7th Petro India 2008 conference Gas In India- Issues, Opportunities & Challenges.
1 Natural Gas Transmission Pipelines Brisbane City Council Meeting June 6, 2011.
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
Economic Development Incentive Agreement Project Modern.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
SINGAPORE +21 %.
Downtown Tunnel Midtown Tunnel MLK Extension Downtown Tunnel Midtown Tunnel MLK Extension Virginia Maritime Association U.S. Army Corps of Engineers Hampton.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
1 Maribor Wastewater Treatment Plant Presentation of PPP Model in Maribor - Slovenia Conference Danilo ŠALAMON – Chief of the Infrastructure projects Department.
Ordinance No XX Application LU-MIN Small-Scale Future Land Use Map Amendment Twenty Fingers Property June 5, 2007 City Council Meeting.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Offshore Notification System www.GulfSafe.org.
David Jurd – Managing Director, Abigroup Ian Luck – Managing Director, Baulderstone David Marchant – Managing Director, Conneq Core Competencies and Growth.
A proposed route for a walking trail between Trapelo Road and Beaver Street in Waltham, Massachusetts Based on field inventory and reporting by the Mass.
CFS-ADI Joint Meeting University of Tokyo April 8-10, 2014 Session 8 - Power Usage and Site Requirements V Kuchler, A Enomoto.
Terra group DESIGN & ENGINEERING DESIGN & ENGINEERING FOR THE ELECTRO-MECHANICAL AND CONTROL SYSTEMS OF TUNNELS.
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
Oil and Gas Pipeline Sector : Upcoming Opportunities and Forecasts.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Public – Private Partnership in Vietnam: A new approach Ho Chi Minh City – June 2010.
Transport Europe's road safety priorities: your role and ours EuroRAP 14 th General Assembly 23 June 2016, Ljubljana Szabolcs SCHMIDT Head of Road Safety.
Rigaku Rotary Assembly Top View shows “Inlet” side. This couples with 4-ea ¾“ bolts to “Offset” flange. This flange has central hole 1” offset from center.
“A Contractor’s Perspective” John Kilgour - CEO 21 April 2016.
Water Resource Activity
Singapore’s Water Scarcity
Find the exact value of the expression in the interval {image} {image}
Global Concrete Pipe Market : Trends, Forecast, and Opportunity Analysis 1.
Section 7.1 – Rational Expressions
Major and Minor Losses in Pipes
Global Metal Pipe Market Report : Trends, Forecast and Competitive Analysis 1.
Research program 1 Program 1c:
Kvesheti – Kobi Tunnel Section
Dr. C. Solomonidis Civil and Harbour Engineer Managing Director
Section P.5 – Rational Expressions
City of Sunrise Wastewater Reuse Program
Kvesheti – Kobi Tunnel Section
Harbour Island Force Main Replacement
The Name Game Creative Writing Dias.
Steel Pipe Market Report : Trends, Forecast and Competitive Analysis 1.
Steel Pipe Market Report: :Trends, Forecast, and Opportunity Analysis.
Outputs Estimated Tendering Process Timeline (16 – 31 weeks)
© 2019 Global Market Insights, Inc. USA. All Rights Reserved Structural Steel Market Growth Outlook with Industry Review and Forecast.
Presentation transcript:

1 Objective  Extend NEWater transmission mains to Jurong Island to meet increasing NEWater demand by industries Scope  6 Contracts km of 2.2m, 11.2km of 1.6m, & 7.2km of 1.2m dia pipelines ContractScheduleRemarks 1, 2 & 3Tenders calledTenders under evaluation 5 & 6May km of 2.2m dia pipeline along Pioneer Road by pipe jacking 4June km of 6m dia segmental tunnel with twin 2.2m and 1.2m dia pipelines NEWater Infrastructure Plan Extension to Jurong Island (NIPE)

2 C5 & 6 C4 C1, 2 & 3

3 6 M ID Tunnel 2.2m dia Potable Water Pipeline 2.2m dia NEWater Pipeline Support 1.2m dia Potable Water Pipeline Support 1.2m dia NEWater Pipeline 6m dia Tunnel NEWater Infrastructure Plan Extension to Jurong Island (NIPE) TYPICAL SECTIONAL VIEW OF PIPELINES FOR NIPE CONTRACT 4