Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC AG1 meeting in Berlin, March 4, 2015 Page No. 1 Working Group Activity Report 2015 JWG A3/B5/C4.37 System.

Slides:



Advertisements
Similar presentations
International Aid Transparency Initiative (IATI) First Annual Conference 20 / 21 October 2009 Session 5 The work of the Technical Advisory Group and Proposal.
Advertisements

1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
Study Committee Representatives Annual Report December, 2012
JWG A2/B4-28 HVDC Converter Transformers Progress Report Convener: Milan Saravolac IEC SYMPOSIUM DELHI, January 2009.
WG B4.62 Connection of Wind Farms to Weak AC Networks Working Group Meeting – June 2013, ERCOT Office, Taylor, Texas.
CIGRE Paris Session Sunday 24 th – Friday 29 th August, 2014 Monday 25 th … General Assembly Tuesday 26 th … SC A3 meeting Wednesday 27 th AM …
B1 Discussion Group Meeting – 31/08/ Paris Palais des Congrès 2012 SESSION SC xx Name SC PS1/Q1: F. LESUR (France) Guidelines for prepared contributions.
Winnipeg, Manitoba, Cigre Canada Annual Membership meeting, October 19, 2008 CIGRÉ – 2008 Update for SC C6 David Jacobson (C6) Manitoba Hydro.
O.Gjerde WG C2/C5.05 Development and Changes in the Business of System Operators Status report from WG C2/C5.05 Ole Gjerde, Statnett Convenor September.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.28 AR Page No. 1 Activity Report WG A3.28 Switching phenomena.
Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC A3 meeting in Paris, August 26, 2014 Page No. 1 Working Group Activity Report 2014 JWG A3/B5/C4.37 System.
CIGRE WG C PRACTICES IN INSULATION COORDINATION OF MODERN ELECTRIC POWER SYSTEMS AIMED AT THE REDUCTION OF INSULATION LEVELS WG Composition: WG.
1 AG.03: CIGRE SC A3 Green Book proposal (based on experience of Brazilian NC to publish CIGRE textbooks) CIGRE SC A3 Green Book Project Team Paulo Fernandez.
1 60 th CIGRE Technical Committee meeting Paris France, 1 September th informal CIGRE Technical Committee meeting Montreal Canada, 3-4 October 2012.
1 Study Committee Representatives Annual Meeting October 4, 2009 Toronto SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2010 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
ISO activity for Motorcycle OBD connector
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.26 AR 2014Page No.: 1 Activity Report 2014 WG A3.26 Influence of shunt capacitor.
Amantegui Javier (SP) CIGRE Study Committee B5 1 CIGRE STUDY COMMITTEE B5: MISSION AND CHALLENGES Javier Amantegui (Spain) Chairman of CIGRE-SC-B5 “Protection.
Template For Building Project Schedule Jazz Presentation.
SC-A3 (High Voltage Equipment) SCA3 meeting, Delft (Neetherlands), March 12, 2014 A. Mercier (Convener) WG: A3.35 report Guidelines and Best Practices.
1 CONSEIL INTERNATIONAL DES GRANDS RESEAUX ELECTRIQUES INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS STUDY COMMITTEE A2 TRANSFORMERS Presentation of.
9/4/20151 Cigre WG B1.41 Meeting Long term performance of soil and backfill of cable systems Milan, Italy Mar , 2013 Walter Zenger, USA Convener.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B2 “Overhead Lines” Activity Report Presented by: Zibby Kieloch (Manitoba.
1 Cigre Study Committee C5- Brazilia workshop Market Structures and Institutions RISK MANAGEMENT Svein Storstein Pedersen Convenor of TF C
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods.
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009 CIGRÉ – 2009 Activity Report for SC C6 DISTRIBUTION SYSTEMS AND DISPERSED GENERATION.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.24 AR 2014Page No.: 1 Activity Report 2014 WG A3.24 Tools for Simulating Internal.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A Page No.: 1 Activity Report 2014 WG A3.33 Experience with equipment.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
SC B5 - Protection and Automation Report to the Canadian National Committee of Cigré 2007 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 1 Activity Report 2013 WG A3.27 The Impact of the Application.
SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2009 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
Land Code Update M’Chigeeng First Nation July 14, 2015.
Page © ASME 2015 Module B – Process B4.Initiating and Terminating Standards Projects Standards and Certification Training.
CIGRE TF C5-2-1: Classification of Electricity Markets Worldwide
CIGRE WG C4.503 – Numerical techniques for the computation of power systems, from steady- state to switching transients WG Composition:  Jean Mahseredjian.
August 22nd/23rd 2014 WG B3.32 Saving through Optimized Maintenance in Air Insulated Substations 2014 Session – Paris, France.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
1 IFAD consideration of a Code of Conduct for Executive Board Representatives Historical Background Presentation to an Informal Seminar of the Executive.
Coordination Activities by JICCG for UHV technology standardization Hisatoshi Ikeda Co-Chairman of IEC/JICCG Toshiba Co. & Kyushu Institute o f Technology.
CIGRE JWG A2/C4.52 – High-Frequency Transformer and Reactor Models for Network Studies WG Composition:  WG Convener: Bjørn Gustavsen  WG Secretary: Angelica.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
2016/6/11 1 Liaison Report on ISO/TC215 Hidenori Shinoda 6/29/2007 Berlin.
WG Composition: WG Convener: Bjørn Gustavsen
Study Committee Representatives Annual Meeting October 18, 2010 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
Implementation of Connection Network Codes The French process
ISO TC268 SC1 - Smart Community Infrastructures -
CIGRE WG C4.28 Extrapolation of EMF measurements
WG Composition: WG Convener: W. A. Radasky
Report Task Force UNR46 5th Meeting OICA Paris, 26-27th September 2016
Frances Cleveland Convenor WG15
New JWG 16 – formats for visualization and other derived forms of product data at ISO/TC 184/SC 4 Industrial Data Christophe MOUTON, EDF AFNOR/CP IDMI.
Implementation of Connection Network Codes The French process
Report and explanation document of SBR-TF
CNC-CIGRE Study Committee Meeting October 19, 2008 Winnipeg CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure Hydro-Québec / IREQ.
Behaviour of M2 & M3 general construction in case of Fire Event
Transmitted by the IWVTA Informal Group
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
ANSI REFRESHER COURSE 2018 CHANGES TO THE ISO DIRECTIVES
Create a Plan - Next 90 Days
Steering Committee, Eurostat, Luxembourg, 4 February 2011
Item 4.2 – Towards the 2016 AES Philippe Lombardo Eurostat-F5
Adult Education Survey mandate of the TF AES
Create a Plan - Next 90 Days
802.11F Meeting Report March 2002 Month 1998 doc.: IEEE /xxx
STUDY COMMITTEE A1- ROTATING ELECTRICAL MACHINES
Calendar Overview – Phase I – REVISED April 2019
Presentation transcript:

Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC AG1 meeting in Berlin, March 4, 2015 Page No. 1 Working Group Activity Report 2015 JWG A3/B5/C4.37 System conditions for and probability of Out-of-Phase Convener: Anton Janssen (Netherlands), Secretary: Anton Janssen (The Netherlands) Year of Kick-off: 2014 Number of Members: 18 (To be approved at the next SC meeting (To be approved at the next SC meeting Regular Members: 6Corresponding Members:12 Retiring Members: New Members: Proposed for approval by SC A3, B5, C4 1.Mirko Palazzo (CH), RM 2.Manie van der Staden (RSA), cM 3.Dyke Monyane (RSA), cM 4.Sean McGuinness (IRL), RM 5.Helio Pessao (BR), cM

Study Committee A3 HIGH VOLTAGE EQUIPMENT Technical activities & discussion items First meeting in Arnhem, October 2014: 5 members present but an inspiring meeting with main focus on system and (generator) protection behavior. Exchange of much literature, standards, instructions, tutorials, grid-codes, etc. Note: many corresponding members and many young members, but 8 utility members and 3 from university/research (6 manufacturers). Still asking for members from Canada (HQ, Hydro-One). Maybe a new member from Sweden. Special attention for large disturbances, where systems fell apart with afterwards a number of mis-synchronization events. Also for small disturbances that happen quite often, but here nomenclature still forms a problem. Further the requirements for generator protection (and the generator itself), where a balance has to be found between saving the power system and saving the power plant (is pole slip allowed for and how many?). This is a preferential subject for the SC B5 Session in CIGRE SC A3 meeting in Paris, August 26, 2014 Page No. 2 JWG A3/B5/C4.37

Study Committee A3 HIGH VOLTAGE EQUIPMENT WG Meeting schedule WG meeting: 1st meeting, Arnhem, the Netherlands, 6 and 7 October nd meeting, Dortmund, Germany, April 15 and 16, rd meeting to be decided. Also to be decided on a special meeting during the SC A3 & B3 Colloquium for the corresponding members from Japan First step will be to write a scoping document. CIGRE SC A3 meeting in Paris, August 26, 2014 Page No. 3 JWG A3/B5/C4.37

Study Committee A3 HIGH VOLTAGE EQUIPMENT Publications none CIGRE SC A3 meeting in Paris, August 26, 2014 Page No. 4 JWG A3/B5/C4.37

Study Committee A3 HIGH VOLTAGE EQUIPMENT Membership to be approved at the next A3, B5, C4 meetings Last NameFirst NameCompanyCountryStatus JanssenAntonLianderThe NetherlandsRM (Convenor) KubisAndreasTU DortmundGermanycM JonesKevinSouth-Western Public Service CompanyUSAcM WillièmeJean-MarcAlstomFranceRM PatelAmitGE EnergyUSAcM WeiskerJanSiemensGermanycM WangZhenhuaAEPUSAcM AprosinKonstantinProsoft-Systems Ltd.RussiaRM De VilliersFrancoEskomRSAcM KitauchiYoshihiroCRIEPIJapancM PoggiGiorgioEdFFranceRM SuganumaShinichiTEPCOJapancM YoshimotoSaoriToshibaJapancM PalazzoMirkoABBSwitzerlandRM Van StadenManieEskomRSAcM MonyaneDykeEskomRSAcM McGuinnessSeanEPRI InternationalIrelandRM PessaoHelioONSBrazilcM CIGRE SC A3 meeting in Paris, August 26, 2014 Page No. 5 JWG A3/B5/C4.37