CIGRE WG C4.305 . PRACTICES IN INSULATION COORDINATION OF MODERN ELECTRIC POWER SYSTEMS AIMED AT THE REDUCTION OF INSULATION LEVELS WG Composition: WG.

Slides:



Advertisements
Similar presentations
European COoperation in the Field of Scientific and Technical Research Role and rules of procedure for Management Committee Carine Petit Science Officer.
Advertisements

Bank Group Engagement in Extractive Industries (EI) Presentation by Tove STRAUSS Governance Division (OSGE.1) African Development Bank Tunis, TUNISIA.
1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
Study Committee Representatives Annual Report December, 2012
JWG A2/B4-28 HVDC Converter Transformers Progress Report Convener: Milan Saravolac IEC SYMPOSIUM DELHI, January 2009.
AG.03: CIGRE SC A3 Green Book planning
What makes Elevation successful? ESA Consultation Survey 2001 ESA Consultation Survey Percent of administrative units reporting: Percent of administrative.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.28 AR Page No. 1 Activity Report WG A3.28 Switching phenomena.
International Symposium on Standards for UHV Transmission System Impacts on UHV Substation Equipment On behalf of CIGRE WG A January 2009,
Second IEC-CIGRE UHV Symposium, January 2009, New Delhi
Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC A3 meeting in Paris, August 26, 2014 Page No. 1 Working Group Activity Report 2014 JWG A3/B5/C4.37 System.
Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC AG1 meeting in Berlin, March 4, 2015 Page No. 1 Working Group Activity Report 2015 JWG A3/B5/C4.37 System.
1 AG.03: CIGRE SC A3 Green Book proposal (based on experience of Brazilian NC to publish CIGRE textbooks) CIGRE SC A3 Green Book Project Team Paulo Fernandez.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.26 AR 2014Page No.: 1 Activity Report 2014 WG A3.26 Influence of shunt capacitor.
Standardization Aspects in UHV Networks New Delhi, January 2009 Denis Dufournet Chairman IEC TC17 Member CIGRE WG A3-22.
Report on Technical Board (Sept. 2014) Taketo Uomoto Chairman of TB.
1 OECD’s work on setting FDI standards and definitions By: Ayse Bertrand Investment Division, OECD
SC-A3 (High Voltage Equipment) SCA3 meeting, Delft (Neetherlands), March 12, 2014 A. Mercier (Convener) WG: A3.35 report Guidelines and Best Practices.
1 CONSEIL INTERNATIONAL DES GRANDS RESEAUX ELECTRIQUES INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS STUDY COMMITTEE A2 TRANSFORMERS Presentation of.
System of Environmental- Economic Accounting for Material Flows (SEEA-MFA): Drafting Process Fourth Meeting of the UN Committee of Experts on Environmental-Economic.
REVIEW OF THE RCA AGREEMENT 2013 RCARO Workshop on Strengthening the RCA/RCARO Activities and its Efficiency, 7-9 August 2013, Seoul, South Korea Alumanda.
TERM LOANS PROCEDURAL REQUIREMENTS. Obligations of assistance.
Session 1: Towards international recommendations for energy statistics Vladimir Markhonko International Workshop on Energy Statistics, Aguascalientes,
“Beyond 2008” A Briefing 11th European Conference on Rehabilitation and Drug Policy Working together – Partners for Change Ljubljana, 6 June,
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods.
20th AIAA Advanced Measurement and Ground Testing Technology Conference Lessons Learned in AIAA Working Group Development E. Allen Arrington Dynacs/NASA.
Association of Sport Performance Centers, ASPC August, 2013 Rio de Janeiro Brazil Overview.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.24 AR 2014Page No.: 1 Activity Report 2014 WG A3.24 Tools for Simulating Internal.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A Page No.: 1 Activity Report 2014 WG A3.33 Experience with equipment.
STATUS REPORT SWG SO by PLN HAPUA MEETING WORKING GROUP 2 – TRANSMISSION SUB WORKING GROUP– SYSTEM OPERATION 6th Oct 2010, Kuala Lumpur - Malaysia.
Deputy Assistant Secretary for International Affairs for Fossil Energy Justin “Judd” Swift – U.S. Department of Energy.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
Session 2, III - Voltage dips and disturbances in customers installations Barcelona May 2003 Activities of Joint Cigré/CIRED/UIE Power Quality Working.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 1 Activity Report 2013 WG A3.27 The Impact of the Application.
IRES: an update on the revision process Vladimir Markhonko United Nations Statistics Division The 4 th meeting of the Oslo Group on energy statistics Ottawa,
BY: G.P. MBUGUA AG. DEPUTY REGISTRAR, R&T. MEETINGS Definition: A meeting may be defined as the coming together of at least two persons for any lawful.
Rolling Resistance Standards Work at ISO (TC31 WG6) Prepared for GRB Review 19 Sep 2011 Angela Wolynski WG6 Convenor Informal document GRB (54th.
MedLiHer Contribution to Implementing the Convention for Safeguarding of the ICH in Mediterranean Countries Phase II Evaluation Meeting Cairo – Egypt 28-30/11/2010.
Cigre / IEC UHV Symposium, New Delhi Strategic Agenda for CIGRE‘s Technical Activities Klaus Fröhlich.
Session 2 (System Aspects) Rapporteur: Hiroshi Okamoto (JP) 2 nd International Symposium on International Standards for Ultra High Voltage, New Delhi,
1 SUMMARY OF ISSUES EMERGING SINCE 2005 STESEG MEETING SUMMARY OF ISSUES EMERGING SINCE 2005 STESEG MEETING SHORT-TERM ECONOMIC STATISTICS WORKING PARTY.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
CIGRE TF C5-2-1: Classification of Electricity Markets Worldwide
CIGRE WG C4.503 – Numerical techniques for the computation of power systems, from steady- state to switching transients WG Composition:  Jean Mahseredjian.
August 22nd/23rd 2014 WG B3.32 Saving through Optimized Maintenance in Air Insulated Substations 2014 Session – Paris, France.
Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB.
CIVL300 SUMMER PRACTICE. Gain first hand experience in construction industry.
Coordination Activities by JICCG for UHV technology standardization Hisatoshi Ikeda Co-Chairman of IEC/JICCG Toshiba Co. & Kyushu Institute o f Technology.
Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB.
CIGRE JWG A2/C4.52 – High-Frequency Transformer and Reactor Models for Network Studies WG Composition:  WG Convener: Bjørn Gustavsen  WG Secretary: Angelica.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
Professional Career Ladder System Guidelines Promotion Packet County Extension Agents Revised – April, 2017.
Senior Advisor, Environment and Development Foundation
WG Composition: WG Convener: Bjørn Gustavsen
Regional SDGs Indicator Framework Development
Study Committee Representatives Annual Meeting October 18, 2010 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
IAEA Perspectives on Implementation of the optimization principle
1st Informal Group on WLTP Palais des Nations, Geneva
REPORT OF THE ELECTRONIC WORKING GROUP UNEP(DEC)/CAR WG.29/INF.12
CIGRE WG C4.28 Extrapolation of EMF measurements
CIGRE WG C4.33 – Impact of Soil-Parameter Frequency Dependence on the Response of Grounding Electrodes and on the Lightning Performance of Electrical Systems.
WG Composition: WG Convener: W. A. Radasky
WELCOME TO TETA SDF ROADSHOW FEBRUARY 2018.
INCUBATION PROCESS AT SIIF
CNC-CIGRE Study Committee Meeting October 19, 2008 Winnipeg CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure Hydro-Québec / IREQ.
CARDS TWINNING IN CROATIA
WP2. ARIMNet2 2nd call ARIMNet2 Governing Board Meeting
STUDY COMMITTEE A1- ROTATING ELECTRICAL MACHINES
The 17th ABU Copyright Committee July 19, 2011
Presentation transcript:

CIGRE WG C4.305 . PRACTICES IN INSULATION COORDINATION OF MODERN ELECTRIC POWER SYSTEMS AIMED AT THE REDUCTION OF INSULATION LEVELS WG Composition: WG Convenor: A. S. TELENTO (Hr) WG Secretary: S. MALGAROTTI (It) Total number of Members (Reg.+ Corr.) 20 Number of Regular members: 12 Number of Corresponding members: 8 Number of members from industry (utilities): 8 Number of members from industry’s institutes: 6 Number of members from universities (Edu., R&D): 2 Number of members from consulting companies: 4

Technical Committee meeting, September 1st, 2012 - Paris CIGRE WG C4.305 Number of countries represented: Total number: 12 Number of countries from various continents: Europe: 9, South America: 2, North America: 1 Asia, Africa, Australia: 0 (no participants) Conclusion: Countries from non-included continents are expected to be included in WG Survey and WG work (e.g. Japan, China, India, RSA…) Members of SC C4 are kindly requested to act in that direction. . WG Title matters: Original Title proposed in 2008 was: Insulation Coordination Practices and Tendencies in Modern EPS Changed Title (made by former SC Chairman C.A. Nucci in 2009): As in Title of this presentation – Consequences: Scope is focused to Ins. Level reduction – it changes to some extent the Scope of WG New slight change: Insulation Coordination Practices in Modern EPS aimed at the reduction of Ins. Levels (change in sequence of first three words) – that gives more stress in title on IC discipline Technical Committee meeting, September 1st, 2012 - Paris

Technical Committee meeting, September 1st, 2012 - Paris CIGRE WG C4.305 WG Timeline (1): Proposal of new WG given at the beginning of 2008 Date of approval: Signed by TC Chairman at the end of Nov. 2009 Information received by WG Convenor at the end of 2009 Beginning of WG work in the middle of 2010 (no sufficient answers received before spring 2010 from experts interested to work as WG members) Starting Dates: First informal meeting in Zagreb, Croatia, April 2010 First official WG Meeting in Paris, August 26, 2010 (14 participants) Second official WG Meeting, Rio de Janeiro, April 12, 2011, hosted by ONS and Mr. Dalton Brasil (7 participants) Third official WG Meeting: Paris August 28, 2012 (8 participants) Fourth official WG Meeting: Paris, August 27, 2014 Totally: 4 WG Meetings and additional 3 informal meetings in Zagreb have been held Number of Internal Working Documents (IWD) discussed and dispatched among WG Members: 22 (IWD 1 – IWD 22). Technical Committee meeting, September 1st, 2012 - Paris

CIGRE WG C4.305 WG Timeline (2): In 2013 WG Meeting was planned in Zuerich, but was not held due to unexpected infeasibilness of WG Convener. Details have been given to current SC C4 leadership. Due to same reason activity of WG 305 was slowed down or stopped for about 18 months (up to middle of 2014). Low-level intensity work in mentioned period (2013 to middle of 2014) was limited to the following: - exchange of some new IWDs among WG Members - inclusion of few new WG Members (e.g. A. Xemard, V. Larin etc.) - preparations for quick finishing of WG work in period after Paris Session 2014, etc. Expected date of submitting Final Report to SC Chairman: Final report will be submitted about half a year after Paris Session 2014, i.e. in spring 2015, after processing WG Survey on IC Practice .

CIGRE WG C4.305 WG Timeline (3): Graphical presentation of events in WG formation and work: . First idea The first Approval of on new informal new WG by First part of work o WG C4.305 Period of Second part of WG given Meeting TC Chairman forced break of WG 305 work on CIGRE on new WG at the end of WG C4.305 work and Final Report Symposium in Cavtat, year and after submission to in Zagreb, Croatia 18 months of SC Chairman Croatia submitting WG request _↑__₀____↑_₀_____↑₀____↑₀↑₀↑₀₀↑₀ 2008 2009 2010 2011 2012 2013 2014 2015 LEGEND: Thin line __ : Development of idea of new WG, Long period of WG approval by TC Red arrow  : Period of active work of WG with regular WG Meetings White arrow  : Period of inactivity or low intensity work Vertical arrow ↑: WG Meetings

TABLE OF CONTENTS 0F NEW CIGRE BROCHURE - TB WG C4.305 CIGRE WG C4.305 TABLE OF CONTENTS 0F NEW CIGRE BROCHURE - TB WG C4.305 Technical Committee meeting, September 1st, 2012 - Paris

CIGRE WG C4.305 Highlights of Recent Activity (1) Survey forms for gathering world-wide practice in IC consist of: I System parameters: IV Withstand voltages: Operating voltages  Transformers Neutral earthings  Switching equipment Design altitudes  Substation insulation II Overvoltage determining parameters:  Line insulators Lightning activity (GFD) V Pollution parameters: Transmission towers configuration  Class (ESDD, NSDD) Substation size and configuration  Creepage distances Capacitor banks and circuit breakers VI Insulation failure rates: Maximum overvoltages in system  Experienced data III Surge arrester application:  Acceptable levels Ratings VII Insulation level tendency Locations  Reductions

CIGRE WG C4.305 Highlights of Recent Activity (2): Example of diagram in textual part of Brochure:

CIGRE WG C4.305 Future activities: Despatch of survey forms to power utilities and countries: through WG C4.305, through SC C4 Members, NCs Cigre etc. Term: September 2014 Filling of survey, with possible help of WG or SC Members Term: till end of 2014 Gathering and processing data from world’s survey Term: the first quarter of 2015 Despatch of TB C4.305 Report to SC Chairman till June 2015 Inclusion of SC C4 in work of this WG, generic to part of SC C4: Letter of recommendation of SC C4 Chairman, approval of proposal of Letter: in September 2014 RM and OM of SC C4 are expected to help in interactive work with utilities and countries (such duty arises from SC Rules) SC Rule 5.5 “… processing of questionnaires issued by SC”

Thanks for your Attention! Special Thanks for your very kind Assistance to this Project! CIGRE WG C4.305 Technical Committee meeting, September 1st, 2012 - Paris