May 22, 2012 Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan ASFPM 2012 Annual Conference Timothy J. Trautman, P.E., CFM Flood Mitigation.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Understanding Active and Passive Floodproofing Options for Non-Residential Buildings in a Special Flood Hazard Area Course Number: SV003 Learning Units:
List of Nominations Connecting User Needs with Weather Research and Forecasts Rebecca E. Morss National Center for Atmospheric Research Boulder, Colorado,
Local Policy I Session Name: Local Policy I Coastal Hazards Management Course I. Introduction What Do We Mean By “Local Policy” General Police Power Session.
Sandy: Building Back Stronger, Safer & More Resilient Tim Crowley, Director, Mitigation Division, FEMA Region II December 2012.
Charlotte-Mecklenburg Flood Risk Assessment & Risk Reduction Plan Timothy J. Trautman, P.E., CFM Flood Mitigation Program Manager Charlotte-Mecklenburg.
Guidebook for Risk Analysis Tools and Management Practices to Control Transportation Project Costs Keith R. Molenaar, PhD Stuart D. Anderson, PhD, PE Transportation.
Risk MAP Discovery Matanuska-Susitna Borough Information Exchange Sessions March 2013.
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
F EDERAL I NSURANCE AND M ITIGATION A DMINISTRATION Hazard Mitigation Overview Franki Coons Chief, Grants Implementation Branch Risk Reduction Division.
The Risk is Real… Be PREPARED! Robert Billings, PE, PH, CFM Flood Mitigation Project Manager Charlotte-Mecklenburg Storm Water Services May 18, 2011 Briar.
Update Training Meeting
FEMA’s Role in National Water Policy Supporting National Water Resource Policy Introduction Sandra K. Knight National Waterways Conference September 22-24,
Flood Avoidance and Mitigation
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Session 301 Factors in Assessing Risk Mitigation Actions Impact reducing the identified risks and vulnerabilities in the community Probability that each.
Hazard Mitigation Planning IV Session Name: Hazard Mitigation Planning IV Coastal Hazards Management Course Based on analyses conducted during previous.
Hydraulic Screening and Analysis Needed for USACE Review
Hazard Mitigation Planning V Session Name: Hazard Mitigation Planning V Coastal Hazards Management Course Task 6.1 Prioritize the Geographic Planning Areas.
Mitigation and Community Sustainability Virginia Mitigation Summit, 2004.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Flood Risk Review Meeting: [Watershed Name] [LOCATION] [DATE]
Flood Risk Management Program Rolf Olsen Institute for Water Resources U.S. Army Corps of Engineers.
Sapient Insurance Partners. Overview & Services We have almost four decades of combined experience in the property & casualty insurance and reinsurance.
Unit 1 Community Capabilities
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Mitigation. Hazard Mitigation is any sustained action taken to reduce or eliminate long-term risk to people and their property from hazards and their.
N AVIGATING THE T URN : F LOOD R ISK A SSOCIATED WITH L EVEES Sam Riley Medlock, J.D., CFM Association of State Floodplain Managers May 2011.
Session 4Slide 4-1 Hazards Risk Management In the United States Session 4 Slide Deck.
Dam Hazard Consequences Assessment
Louisiana’s 2012 Comprehensive Master Plan for a Sustainable Coast Path Forward on Nonstructural Program Implementation CPRA Meeting - October 17, 2012.
Summit #1 San Juan County Shoreline Master Program Update March 1 st, 2 nd, and 3 rd
An Overview of the Community Rating System (CRS)
Relevant, Ready, Responsive, Reliable 1 Addressing the Flood Risk Challenge.
Hazard Mitigation Planning and Project Funding. Agenda Objectives Overview of Hazard Mitigation Hazard Mitigation Planning Mitigation Project Funding.
Crossing Methodological Borders to Develop and Implement an Approach for Determining the Value of Energy Efficiency R&D Programs Presented at the American.
Growth Management Legislative Discussion March 20, 2012.
ASFPM 2011 FEMA’s National Flood Mitigation Data Collection Tool (NT) Errol Garren May 19, 2011 H-4A 4:
Mitigation Plan for Four New Jersey Counties Municipal Mitigation Measures prepared for: Camden, Cumberland, Gloucester, and Salem Counties prepared by:
Risk MAP Early Demonstration Projects in Region II 2011 Association of State Floodplain Managers May 17, 2011 Louisville, KY.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Our Mission MITIGATIONS. MEANING OF MITIGATION MITIGATION IS THE PERMANENT REDUCTION OF THE RISK OF DISASTER MITIGATION IS THE PERMANENT REDUCTION OF.
The Status of NFIP Reform and Floodplain Mapping Mayors’ Water Summit December 8, 2010.
Session 17Slide 17-1 Financing Risk Reduction Session 17 Slide Deck.
Central Connecticut Region Multi-Jurisdictional Hazard Mitigation Plan Advisory Committee Meeting November 17, 2014.
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES The Disaster Mitigation Act of 2000.
Hazard Mitigation Funding Programs. Current Florida Mitigation Programs 1.Hazard Mitigation Grant Program* (HMGP) Hazard Mitigation 3.Pre-Disaster.
Community Rating System (CRS) Program Overview & Services SRPEDD BriefingNovember 9, Darrin Punchard, AICP, CFM Principal – Risk & Resilience.
Monmouth County Multi-Jurisdictional Hazard Mitigation Plan Update.
FEMA’s Federal Insurance and Mitigation Administration -- Leading the Nation to Build a Stronger, Smarter, Safer America MITIGATION WORKS Sandra K. Knight,
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
Sally McConkey, P.E., D.WRE., CFM Illinois State Water Survey ASFPM Chair USACE Silver Jackets Workshop – August 2012.
ASFPM Conference – May Shifting Our Focus from Maps to Risk William L. Coulbourne, P.E. Applied Technology Council (ATC)
Draft Recommendations from the NH Coastal Risks and Hazards Commission Sherry Godlewski Department of Environmental Services Coastal Adaptation Workgroup.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
Growing Smarter Pennsylvania’s Land Use Agenda. Percent of Land Developed in Pennsylvania Source: Natural Resources Conservation Service, U.S. Department.
Hazard Mitigation Plan Update Lancaster County Final Public Meeting April 26, 2013.
Preliminary Engineering Analysis and Design Foxcroft Colony and Mosby Woods Condominiums Prepared for: City Council Work Session November 3, 2015.
City Council Workshop March 27, 2014 Debbie Vascik, CFM Cahoon Consulting.
AHWATUKEE-FOOTHILLS ADMS MANDAN STREET DESIGN CHARRETTE Valerie Swick, Project Manager Flood Control District of Maricopa County.
Draft Central Valley Flood Protection Plan Investment Strategy
2017 HAMPTON ROADS HAZARD MITIGATION PLAN UPDATE BRIEFING
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES
COSO and ERM Committee of Sponsoring Organizations (COSO) is an organization dedicated to providing thought leadership and guidance on internal control,
Ryan Cox, Mitigation Planning Supervisor, NC Risk Management
City of Kingfisher: Using Historic Flooding to Quantify Damages
MANAGING YOUR FLOOD RISK All stakeholders contribute to risk reduction
Local Hazard Mitigation Planning & Disaster Preparedness
Agency Logos. Hazard Mitigation Grant Program Summer 2018 California Wildfires and High Winds DR-4382.
Presentation to Sacramento Environmental Commission May 21, 2018
Presentation transcript:

May 22, 2012 Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan ASFPM 2012 Annual Conference Timothy J. Trautman, P.E., CFM Flood Mitigation Program Manager Charlotte-Mecklenburg Storm Water Services Darrin R. Punchard, AICP, CFM Senior Project Manager AECOM

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Agenda Overview Flood Risk Scoring System Risk Reduction Recommendations Flood Mitigation Priority Scores Pilot Study Process Keys to Success 2

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Purpose of the Plan 3 Recommend specific flood mitigation techniques at a building or parcel level Assist in planning, prioritizing and funding future flood mitigation projects Use a new, comprehensive and holistic approach Create a broader and more inclusive risk-based strategy

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan What’s Unique About This Plan 4 Determine Individualized Flood Risk Develop Public & Private Risk Reduction Actions Prioritize Flood Mitigation Projects Implement Balanced Flood Mitigation Capital Program

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan The Need for This Plan 5 Under the Previous Plan –Successfully implemented the acquisition and demolition of 200+ flood-prone structures –Very few properties remain that are deemed cost-effective under FEMA grant requirements –Several significant flood events in recent years –SRL properties and non-compliant buildings Next phase of Capital Improvement Projects

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Overview of the Plan 6 Fully developed plan document, but also very dynamic in nature Fueled by spatial datasets, databases and automated tools –Executive Summary & Introduction –Flood Risk Assessment –Risk Reduction Recommendations –Flood Mitigation Priority Scores –Planning Process & Plan Maintenance Citizen Review Committee (CRC)

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Concept 7 Flood Risk Property Score Flood Property Damage (Impacts) Storm Probability (Frequency) Structure Location Risk Reduction Recommendations Evaluate all flood mitigation techniques Four recommendation categories Mitigation Priority Scores Accounts for other community benefits & factors not included in flood risk Combined with Risk Score to prioritize: Properties Projects (groups) Risk Assessment & Risk Reduction Plan

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Flood Risk Property Score 8 Part of a larger Flood Risk Scoring System Relative indicator of a property’s risk Analyzes factors related to flood impacts, storm frequency and structure location

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Flood Risk Factors 9 –Finished Floor Elevation (living space) –Frequency of flooding –Location within the floodplain (including velocity zones) –Crawl space –Mechanical and electrical systems –Vehicles –Ingress/egress from the building and property –Exterior improvements (detached garages, sheds, pools, etc.) –Number of dwelling units impacted

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Flood Risk Example 10

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan What This Looks Like 11 Detached Garage Velocity ZoneCommunity Encroachment Area Line Parking Area Source of Flooding

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Risk Reduction 12 Guide for public and private flood mitigation activities Analyzes the effectiveness and appropriateness of flood mitigation techniques for each property

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan13

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan 19 Mitigation Techniques 14 1.Property Acquisition and Structure Demolition 2.Structure Demolition and Rebuild 3.Property Acquisition and Structure Relocation 4.Property Acquisition, Demolition or Relocation, and Re-sale 5.Structure Elevation 6.Abandon Basement and Fill 7.Dry Floodproofing of Structures 8.Wet Floodproofing of Structures 9.Audible Flood Warning System for Individual Property 10.Storm Water Detention Facilities 11.Storm Water System Control 12.Automated Flood Notifications 13.Public Education 14.Flood Insurance 15.Levee/Floodwall Protection for Multiple Structures 16.Protecting Service Equipment 17.Partial Dry Floodproofing 18.Partial Wet Floodproofing 19.Levee/Wall/Berm for a Single Structure

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Recommendation Categories 15 Each mitigation technique is evaluated and placed into one of four categories: Highly Effective, Recommended The mitigation technique was determined to be highly effective by exceeding the criteria for the effective category and meeting all of the requirements for this category. This category was developed to identify techniques that were highly effective in reducing risk or provided an additional community benefit. Effective The mitigation technique was determined to be feasible and effective by exceeding the minimum criteria and meeting all of the criteria for this category. Further Evaluation Needed The minimum criteria for the mitigation technique is met but further evaluation or additional data is needed to determine if the technique is a viable option. Not Recommended The minimum criteria for the mitigation technique is not met. Therefore, the technique is likely not feasible, effective, or may be cost prohibitive.

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Evaluation Process 16

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan17 Evaluation Process

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan18 “Dashboard” Results

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Analyzing Results 19

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Flood Mitigation Priority Score 20 Used to prioritize flood mitigation efforts across the county Individual properties as well as grouped projects –Community-based benefits –Other factors not included in the Flood Risk Property Score

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Priority Score Factors 21 –Life and human safety –Cost effectiveness –Proximity to other mitigation projects –Property added to flood zone –Repetitive Loss (RL) structure –Property adjacent to publicly owned land –Property located on five-year planned greenway trail –Property located on five-year planned sanitary sewer route –Property intersects with water quality buffer –Property located in an Environmental Focus Area –Property covered by NFIP policy –Historic preservation and cultural asset protection –Other

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Priority Score Example 22

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Pilot Study Process 23 Two areas were used to manually test and refine proposed scoring methods –126 properties –Mix of residential/commercial Results were used to identify and address potential items of concern –Scoring methodology –Data accuracy –Compare with actual flood event data

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Automation 24 Buildings (ECs) Parcels Flood Hazards

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Automation ArcGIS extension 25

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Automation 26

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Automation 27

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Keys to Success 28 Quality data Active involvement from stakeholders Holistic approach to mitigation –Prioritization based heavily on flood risk, but also mitigation feasibility and other important community factors –Capture opportunities to group properties –Capitalize on multi-objective projects to achieve other public benefits

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan29 Questions?

Charlotte-Mecklenburg Flood Risk Assessment and Risk Reduction Plan Communicating Plan Results