HIGHWAY BOUNDARY CONCEPTS Part 1 - Center Line Recovery.

Slides:



Advertisements
Similar presentations
Horizontal Curves
Advertisements

Final Exam Review 1 1.
Licensed to Define Land Boundaries. Boundary Definition Surveyors of good repute Surveyors understand errors Licensed Surveyors make/mark boundaries.
Introduction to Transportation Engineering
CE 515 Railroad Engineering
Road Design Basic Road Design
Geometric Design Session Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Standards of Practice Route Surveys Title 46 Professional and Occupational Standards Part LXI. Professional Engineers and Land Surveyors 1.
Plot Plans & Legal Descriptions. Site or Plot Plans  A plot or site is an area of land generally one lot or construction site in size  The term plot.
Role of the County Surveyor, Land Records and Interface with Zoning Department Bryan Meyer – La Crosse County Surveyor WCCA Presentation March 30, 2012.
Quiz Answers What can be done to improve the safety of a horizontal curve? Make it less sharp Widen lanes and shoulders on curve Add spiral transitions.
S U R V E Y R E P O S I T O R Y F I L I N G I N F O R M A T I O N Survey Filing Information Quick Reference N E B R A S K A S U R V E Y R E C O R D R E.
SECTION 2 ELEMENTS OF DESIGN Horizontal Alignment and Superelevation
Geometric Design CEE 320 Steve Muench.
BASICS OF SURVEYING Ivy Tech Community College. Surveying Definition DEFINITION The art and science of making such measurements as are necessary to determine.
Chapter 13 Site Plan Layout.
Dr. Dan Trent Mississippi Valley State University January 28, 2013.
Land Actions Boundary Dispute Processioning action (NCGS 38-1 et seq) Pattern instruction Action to quiet title (NCGS et seq) Adverse Possession.
Geometric Design of Highways
Geometric Design of Highways Highway Alignment is a three-dimensional problem –Design & Construction would be difficult in 3-D so highway alignment is.
Course Introduction and Two- Lane Highway Horizontal Alignment Lecture 1: CE 578 Highway Traffic Operations.
Geometric Design of Highways
Lec 23, Ch.16, pp : Horizontal alignment (objectives)
Basic Surveying Tim Howell.
Surveying & Project Services1 LAND USE ORIENTATION Surveying – Mapping – Legal Descriptions TVA Web Site – Map Store –1-800-MAPS-TVA or
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
Legal Description Comprehension Topics in Land Surveying: TREC #7223Tim Howell, RLS TREC Instructor #1556.
Property Surveys  Legal Description  Definite boundaries  Must be clear – only one point  Must not change with time  Courts assume:  First in time.
Kentucky GIS Conference September 30,  Context  Definitions  Retracement  Surveyor as “Detective”  History  Ancient Development  Common Law.
Highway Engineering Code No. (CM 304) Lec. 7& 8. Horizontal Alignment.
1.8 INTRODUCTION TO EQUATIONS I can solve equations using tables and mental math.
Horizontal Alignment See: (Chapter 5 from FHWA’s Flexibility in Highway Design)
Welcome to the International Right of Way Association’s
History and Concept of Boundaries January 20, 2015.
Horizontal Alignment.
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
Horizontal Curves Circular Curves Transition Spirals
Horizontal Alignment – Circular Curves
Design of Highway Horizontal Alignment Chapter 16
By Clayton J. Hogston, PE / PS. Land Ordinance of 1785 Established the Public Land Survey System (PLSS) as a way to sell land in the Northwest Territories.
Horizontal Alignment CE 453 Lecture 16.
Horizontal Curves Chapter 24.
Quiz 2. Quiz 2 Answers 1.In the following alignment description, find 3 reasons why this is a poor alignment.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
Cadastral Principles Grenville Barnes TCI Workshop 17 October 2007.
Understanding Legal Descriptions and the Public Land Survey System for the GIS Environment IGIC – March 7, 2006.
COURSE 900 Day 2 - Property Descriptions Welcome to the International Right of Way Association’s R3.PPT
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
CE303: Introduction to Construction Blueprint Lab.
Kinematics in Two Dimensions. Section 1: Adding Vectors Graphically.
Chapter 5 Circular Motion. MFMcGraw-PHY 1401Ch5b-Circular Motion-Revised 6/21/ Circular Motion Uniform Circular Motion Radial Acceleration Banked.
Understanding Land Measurement and Legal Descriptions.
GEOMETRIC DESIGN: HORIZONTAL ALIGNMENT
Geopak for MoDOT Right of Way & Location Survey Plans.
Land Surveying as it Relates to Forestry Wisconsin Society of Land Surveyors-Central Chapter UWSP Treehaven Facility Tomahawk, WI July 9th, 2013.
Subdivision Design CE 111 Design Graphics.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
The What and Where of Boundaries in a GIS AIC and IACT Greenfield, Indiana August 1, 2012 Presented by Gary R. Kent, L.S The Schneider Corporation.
SHREE S’AD VIDHYA MANDAL INSTITUTE OF TECHNLOGY
Presented by Lance Hummel. Survey of Irrigation Canals.
Recording.
Introduction to Transportation Engineering
How boundaries are created
Horizontal Alignment – Circular Curves
Chapter 15 Site Plan Layout.
Road curve.
Land 123, practice for first quiz. Click to begin.
Surveying With Construction Applications, 7th Edition
Presentation transcript:

HIGHWAY BOUNDARY CONCEPTS Part 1 - Center Line Recovery

Introduction Recovery of the Existing Right of Way Center Line is needed on every project Recovery of the Existing Right of Way Center Line is needed on every project The existing right of way is dependent on the location of the existing center line. The existing right of way is dependent on the location of the existing center line. When no new right of way is needed: When no new right of way is needed:  You need to know what are your limits. When new right of way is to be acquired: When new right of way is to be acquired:  You want to know how much land is acquired.

The Primary Element of the Highway is the Tangent The purpose of the highway is to provide a transportation route. The purpose of the highway is to provide a transportation route. Considerations: Considerations: Cost Cost Safety Safety Travel Time Travel Time Traveler Comfort Traveler Comfort For each of these, the tangent is preferred. For each of these, the tangent is preferred.

Boundary Control and Legal Principles Boundary Control and Legal Principles - Curtis M. Brown - Curtis M. Brown Order of importance for conflicting elements of land location Order of importance for conflicting elements of land location A. Right of possession (unwritten conveyance) B. Senior right (in the event of an overlap) C. Written intentions of Parties 1. Call for a survey 2. Call for monuments a. Natural b. Artificial 3. Direction and Distance 4. Direction or Distance 5. Area 6. Coordinates

That which is the most obvious is of higher importance. That which is the most obvious is of higher importance. Monuments over distances Monuments over distances Distances over bearings Distances over bearings Bearings over areas Bearings over areas Tangents being less complex than curves, have higher importance. Tangents being less complex than curves, have higher importance. If there is a conflict between tangents and curves, tangents should prevail. If there is a conflict between tangents and curves, tangents should prevail. Curve definitions yield to the resolved tangents. Curve definitions yield to the resolved tangents.

Research County Surveys County Surveys

County Surveys

Research County Surveys County Surveys Prior Right of Way Drawings Prior Right of Way Drawings

Prior Right of Way Drawings

Research County Surveys County Surveys Prior Right of Way Drawings Prior Right of Way Drawings Assessor Maps Assessor Maps

Assessor Maps

Research County Surveys County Surveys Prior Right of Way Drawings Prior Right of Way Drawings Assessor Maps Assessor Maps Vesting Deeds Vesting Deeds

Vesting Deeds

Research County Surveys County Surveys Prior Right of Way Drawings Prior Right of Way Drawings Assessor Maps Assessor Maps Vesting Deeds Vesting Deeds Court Judgments Court Judgments

Court Judgments

Research County Surveys County Surveys Prior Right of Way Drawings Prior Right of Way Drawings Assessor Maps Assessor Maps Vesting Deeds Vesting Deeds Court Judgments Court Judgments Field Notes Field Notes

Field Notes

Research County Surveys County Surveys Prior Right of Way Drawings Prior Right of Way Drawings Assessor Maps Assessor Maps Vesting Deeds Vesting Deeds Court Judgments Court Judgments Field Notes Field Notes County Road Resolutions County Road Resolutions

County Road Resolutions

Research County Surveys County Surveys Prior Right of Way Drawings Prior Right of Way Drawings Assessor Maps Assessor Maps Vesting Deeds Vesting Deeds Court Judgments Court Judgments Field Notes Field Notes County Resolutions County Resolutions Government Land Office (GLO) Plats Government Land Office (GLO) Plats

Government Land Office Plats

Public Agencies are Exempt from Adverse Possession The Statue of limitations for adverse possession does not operate against the United States; and, unless there is a state statue to the contrary, the same is true for the states. The Statue of limitations for adverse possession does not operate against the United States; and, unless there is a state statue to the contrary, the same is true for the states. - Evidence and Procedures for Boundary Location 2nd Ed., Brown, Robillard and Wilson pg Evidence and Procedures for Boundary Location 2nd Ed., Brown, Robillard and Wilson pg. 101

ODOT Monuments are a Reference to the Center Line Yesterday’s Project Yesterday’s Project Monuments were set to monument the center line. Monuments were set to monument the center line.

ODOT Monuments are a Reference to the Center Line Today's Project Today's Project Monuments are an aid to recover the existing center line. Monuments are an aid to recover the existing center line.

30’

ODOT Monuments are a Reference to the Center Line Do not try to connect the dots. Do not try to connect the dots. You will not end up with a straight line.

The Center Line is a Mathematical Model It is not an exact match. It is not an exact match. but but

Where we had a single tangent, we should recover a single tangent

Curves should be tangent to the tangents Semi Tangent has the same bearing as the tangent

Spirals should be brought forward

Other elements of the center line model Station equations are perpetuated. Station equations are perpetuated. If angle points existed, they are perpetuated. If angle points existed, they are perpetuated. Offsets from two or more different center lines are maintained. Offsets from two or more different center lines are maintained.

Monuments Control the Tangents Searching for monuments. Searching for monuments. Presume the right of way is fully monumented Presume the right of way is fully monumented Search every PC, PS, PSC, PCS and PT Search every PC, PS, PSC, PCS and PT Search for any PI that falls in the right of way Search for any PI that falls in the right of way Search the 500 and 1000 foot stations Search the 500 and 1000 foot stations Decide which monuments to use. Decide which monuments to use. Preference is given to ODOT monuments. Preference is given to ODOT monuments.

Existing Conditions

Using monuments to find the existing center line

The Highway is a Monument In the absence of Iron Rods, etc. In the absence of Iron Rods, etc. Other monuments can be used to establish the center line Other monuments can be used to establish the center line Bridges are monuments. Bridges are monuments. The pavement is a monument. The pavement is a monument. Fences are monuments. Fences are monuments.

Tangents Control the Curves The tangent is the primary element of the highway. The tangent is the primary element of the highway. Curves connect the tangents together. Curves connect the tangents together.

Slight change in delta angle

More common – a simple curve

Or a curve with spirals

Establishing the tangents, forces the definition for two key elements of any curve: Establishing the tangents, forces the definition for two key elements of any curve: The location of the PI. The location of the PI. And the delta angle. And the delta angle. You can either use the You can either use the Record degree of curve with a different semi- tangent distance. Record degree of curve with a different semi- tangent distance.or Use the record semi-tangent distance with a different degree of curve. Use the record semi-tangent distance with a different degree of curve.

If the curve contains spirals, there is no need to prorate the curve and the spirals. If the curve contains spirals, there is no need to prorate the curve and the spirals. Maintain the record length of the spiral. Maintain the record length of the spiral. All the adjustment may go into the curve radius. All the adjustment may go into the curve radius.

Use of InRoads to Place Curves Hold record spirals. Hold record spirals. Start with the record curve radius. Start with the record curve radius. Adjust the radius if needed. Adjust the radius if needed.

More Than One Center Line May be Needed Only the right of way on one side of the highway may be affected by a past project. Only the right of way on one side of the highway may be affected by a past project. More than one center line may need to be recovered. More than one center line may need to be recovered. Their relationship to each other will need to be determined. Their relationship to each other will need to be determined.

An Example 1945 Center Line 1932 Center Line

Another Example

Center lines may also be different end to end

Stationing Center lines from different projects are independent of each other. Center lines from different projects are independent of each other. Stationed as created – tied together with offsets. Stationed as created – tied together with offsets. Equations are brought forward. Equations are brought forward.

Center lines from different projects are independent of each other.

They are not connected together

Tied together with an offset