Heather Bell GMFIR Vancouver November 9, 2010 NAV CANADA.

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

Federal Aviation Administration 1 Collaborative Decision Making Module 2 Developing A Collaborative Framework.
October 31, Metron Aviation, Inc. Dan Rosman Assessing System Impacts: Miles-in-Trail and Ground Delays.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Airside Capacity Enhancement
Air Traffic Management
RUNWAY 28 EXTENSION Stakeholders Meeting April 17, 2013.
The pilot and airline operator’s perspective on runway incursion hazards and mitigation options Session 3 Presentation 1.
NY/NJ/PHL Metropolitan Area Airspace Redesign Implementation Update Presentation to: Eastern Region Aviation Weather Conference By: Don Castonguay Air.
1 Alberta Airspace & Services Project (AASP) AOCM Presentation Nov 30, 2011 Jim Strukalo – NAV CANADA Project Manager
Continuous Climb Operations (CCO) Saulo Da Silva
By: Steve Lang Date: September 2007 Federal Aviation Administration Wake Vortex R&D Status Briefing NBAA Convention.
PBN Plan Development Aviation Industry Forum 18 November 2009.
1 Comprehensive Management Plan for East Hampton Airport  Safety, Noise and Operations Peter J. Kirsch December 1, 2011.
Instrument Ground Training Module 5
Approach Charts and Procedures
“Established on RNP” Jeff Williams – IATA
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
Welcome Air Traffic Control Procedures For: SAFECON 2015 Competition.
Delivering NextGen June 5, 2015 Maryland Airport Managers Association Presented by Carmine Gallo, Eastern Regional Administrator Federal Aviation Administration.
FAA Air Traffic Organization NAS Operational Analyses and Challenges to Modeling the Future.
1 Federal Aviation Administration Mid Term Architecture Briefing and NextGen Implementation 1 Federal Aviation Administration Mid Term Architecture Briefing.
NAV CANADA AT A GLANCE NAV CANADA is the non-share capital, private corporation which owns and operates Canada’s civil air navigation service (ANS). It.
Date: 18 February 2008 Federal Aviation Administration Collaborative Decision Making at the FAA/ATO A look at how CDM is applied in the U.S.
Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.
Federal Aviation Administration FOR OFFICIAL USE ONLY (Public availability to be determined under 5USC 552) Data Communications Program DCL Benefits Modeling.
Performance Based Navigation Industry Forum Issues Workshop Presentation to Industry Forum 18 November 2009.
Requirement for PSR Primary Surveillance Radar
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
AIR TRAFFIC CONTROL Presented by S.SUMESWAR PATRO Regd no:
1 July 18, 2011 Runway 19 Dalton Departure Procedure Flight Crews requesting the Dalton 19 Departure MUST possess the chart and adhere strictly to the.
The Professional Aspects of Mixed Mode for Runway Operations.
2010 G8/G20 Summits Aviation Security Planning Briefing Sgt. Cam Kowalski, RCMP Maj. Eric Girard, CF May 10, 2010.
Federal Aviation Administration Runway Safety Action Team 2014 Gary A. Palm ATM Teterboro ATCT.
Federal Aviation Administration 1. Presented to: By: Federal Aviation Administration Palomar Airspace 101 Plus One Flyers Kristin Grulke, Brandon Gonzales.
3 – 4 September 2015 Delhi, India Piyawut Tantimekabut (Toon)
Federal Aviation Administration Date: July 2011 Terminal Arrival Efficiency Rate (TAER) 101 Metric Explanation.
Presented to: NWS Aviation Weather Users By: Danny Sims, Manager of Traffic Flow Management Weather Programs, FAA Date: 18 November 2008 Federal Aviation.
Distributed Multi-Nodal ATFM Operational Trial
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
NAV CANADA UPDATE Presentation to the ATAC AGM November 2010 Rudy Kellar Vice President Operations.
Draft High Level Operational Concept V0.4 Mode of Operation for the Single European Sky Deployable from /11/04.
East Hampton Airport Safety, Noise and Operational Management Plan Peter J. Kirsch December 1, 2011.
F066-B © 2008 The MITRE Corporation. All rights reserved. MITRE-CAASD’s systemwideModeler State and Near-Term Plans Pete Kuzminski 10 December 2008.
ATC1 Air Traffic Control ATC2 Purpose of ATC Safety — Conflict Avoidance — Separation of aircraft Visual Flight Rules Instrument Flight Rules Efficiency.
EUROCONTROL European Organisation for the Safety of Air Navigation.
Federal Aviation Administration Newark Project Overview January 2009.
Air Transport Association of Canada Safety Advisory Committee Larry Lachance Assistant Vice President, Operational Support November 7, 2010.
Scenario on airport works Session 5 Presentation 1.
COLLABORATIVE DECISION MAKING
How do we mitigate weather impacts to the NAS?
Presented to:GMU System-Wide Modeling Workshop By: Joseph Post, ATO NextGen & Ops Planning Date: 10 December 2008 Federal Aviation Administration FAA System-Wide.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
Federal Aviation Administration 1 Collaborative Decision Making Module 5 “The Collaborative Environment”
Arrival Charts and Procedures
NY/NJ/PHL Metropolitan Area Airspace Redesign Project and Implementation Update Presentation to: Congressional Staffers By: Steve Kelley, Airspace Redesign.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
Basics of RNP. Outline  What is RNP?  Why implement RNP?  What does it mean for communities?
Port of Bellingham Briefing BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN BRIEFING April 2014.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Vertical, lateral separations based on time / distance
QUALITY OF SERVICES IMPROVEMENT PROGRAMMES
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Basics of RNP.
Pilot considerations and pilot solutions
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session
Presentation transcript:

Heather Bell GMFIR Vancouver November 9, 2010 NAV CANADA

VANCOUVER FIR UPDATE  FIR OVERVIEW  WHAT HAPPENED IN 2010  Winter Olympics  Airspace/Airport Updates  Meadows Arrival Trial  CYXX RNP 25  TMU West  Customer Forum  LOOKING FORWARD  Vancouver Airspace Improvement  Voice Recognition

Vancouver FIR

2010 Winter Games  Traffic Management  Aviation Security Requirements  Integrated Security Unit  Cross Border Security  Sea to Sky corridor-design, train, equip  Coordination, Collaboration and Communication  Operations, Technical Operations, Engineering, Finance, Legal  RCMP, Transport Canada, NORAD, CBSA FAA  Legacy Improvements  FIMS/EXCDS Kamloops FIC  EXCDS Boundary Bay  MLAT

4 Airspace-Meadows Arrival  Trial since July 5, 2010  Collaborative Decision Process-response to Customer Input  Successful and anticipate continuing with current practice  Waiting for chart publication to include change  Reduced track miles to touchdown  Profiled descent from TOD  Estimate 5% receive CANUCK ARR

5 Airspace-RNP Rwy 25 CYXX Month RNP 25Litres saved GHG (m 3 ) reduced GHG (tonnes) reduced Jan 87 21,750 Feb 76 19,000 Mar ,500 Apr ,000 May ,500 June ,000 July ,250 TOTAL , , Over $150,000 in savings

YXX Tower: Taxiway Construction

AIRSPACE/AIRPORTS  New FSS Victoria Harbour  New ILS Nanaimo  Campbell River Runway extension/Localizer replacement and Glide Path relocation

TMU West

9 TRAFFIC MANAGEMENT IN CANADA NATIONAL OPERATIONS CENTRE (Ottawa) TMU EAST (Toronto) TMU WEST (Vancouver)

10 What does TMU West do?  Coordinate and implement all regional Traffic Management Initiatives (Winnipeg and West)  Focal point for regional stakeholder Communication/Collaboration

11 Traffic Management Initiatives Tactical Options:  In-Trail Spacing or Airborne Holding  Call For Release (CFR)  during periods of short-term excess demand  Ground Delay Program (GDP)  during period of sustained excess demand

12 Collaboration  Strategic Planning  Equipment  Weather  Other Constraints  Customer Requirements and Priorities  Ground vs Airborne Delays  Managing high priority flights  Missed Departure times  Balancing safety and efficiency

History—CYYC Metering The objectives of the Calgary Metering Project : Improve Service Delivery by reducing the use of tactical airborne holding associated with CYYC arrivals Reduce Overall System Delays for CYYC Arrivals Challenges Airport Capacity Scheduled vs non-scheduled-unpredictable departure times

Vancouver Customer Forum  First Customer Forum well attended  Next Forum Spring 2011

Vancouver Airspace Review PHASE I  Completed 2007  Redesign of IFR arrival routes. PHASE II  Completed July 2009  Redesign of VFR airspace  Increase in safety for commercial floatplane operations  Increased capacity for several control zones  Protection of airspace for IFR routes

Vancouver Airspace Review WHAT IS PHASE III?  Comprehensive study of all YVR tower procedures  Identify necessary safety changes  Continue to identify efficiency gains

Vancouver Airspace Review PHASE III CHANGES ALREADY IMPLEMENTED  ASDE Virtual Stop Bars  Intersection departure rules  08R/26L ILS GP protection

YVR Tower: ASDE Virtual Stop Bars

YVR Tower: Intersection Departures  Intersection Departure Rules  All aircraft are issued threshold departures unless:  The flight is a MEDEVAC.  The flight has a flow time.  There are no other aircraft waiting at the threshold.  Improved safety  Went from third highest Runway Incursions in Canada to 13th

YVR Tower: Glide Path Protection  NAV CANADA and YVR Airport have made a significant investment to move the glide path shacks closer to the runway to improve the hold lines and still ensure the glide path is protected in all weather conditions.

GLIDE PATH PROTECTION Glide Path Shacks Old Hold Lines New Hold Lines Before Glide Path Relocation New Hold Lines Due to Glide Slope Shack Rearrangement

New Simulation Technology  AT COACH  Simulator Engine  AT VOICE  Voice Recognition and Response Engine  Resource Efficiency  Correct Phraseology enforcement  Immediacy  Ability to practice  First Generic Enroute Course completed in Vancouver  First Generic Terminal Course to begin in November  First Specialty Specific Terminal Course to follow

Questions?

24 / Hr 32 / Hr Excess Demand