Heather Parker D13 DRAT - Seattle, WA Wrecks of the World II 07JUN11 source: Kip Evans Photography.

Slides:



Advertisements
Similar presentations
GIS Executive Council and Advisory Committee Update November 2010.
Advertisements

The Oil Pollution Act of 1990 A National Law By: Jordan Conger.
40 CFR 300. Overview of the NCP Roles and Responsibilities National Response Priorities General Pattern of Response Relationship with the Area Contingency.
WASH Cluster – Emergency Training S WASH STRATEGY Session 3 Strategic Planning S3 1.
Local Control and Accountability Plan: Performance Based Budgeting California Association of School Business Officials.
Slide 6- 1 CERCLA Chapter 6 Comprehensive Environmental Response Compensation and Liability Act “CERCLA”
Irish Coast Guard Local Authority oil spill Contingency Plans.
October 28, 2014 Community/NGO Perspective: Deepwater Horizon Oil Spill Response University of New Hampshire NOAAAudra Melton.
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
Meeting with IESBA CPAB Update Glenn Fagan and Kam Grewal April 7, 2014.
United States Coast Guard Potentially Polluting Wrecks Significant Federal Laws CDR Ed Bock USCG Office of Incident Management & Preparedness M/V SEAWITCH,
Visual 3.1 Unified Command Unit 3: Unified Command.
Current Planning for 2017 Mid-Point Assessment Gary Shenk COG 10/4/2012 presentation credit to Katherine Antos and the WQGIT ad hoc planning team.
The Columbia River Derelict Vessel Task Force is a forum of stakeholders whose purpose is to identify and remove imminent pollution and hazard to navigation.
9.Monitoring Plan + 10.Implementation Plan + 4. LAs* 5. WLAs* 6. MOS* 7.Seasonal Variation* 8.Reasonable Assurance + TMDL Process 1 Problem Understanding.
1 Preparing Washington for a Changing Climate An Integrated Climate Change Response Strategy Department of Ecology Hedia Adelsman, Executive Policy Advisor.
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
ESPA Comprehensive Aquifer Management Plan Presentation to the Governor’s Water Summit April 17, 2007 Idaho Water Resource Board Jonathan Bartsch and Diane.
B&O Committee May 2015 iTRAK - Change Management An Agency Adapting to Change.
By Saurabh Sardesai October 2014.
Allen Berthold Texas Water Resources Institute. Review: Clean Water Act Goal of CWA is to restore and maintain water quality suitable for the “protection.
Passenger Vessel Safety Specialist Paul Culver Seventh Coast Guard District.
EASTERN MICHIGAN UNIVERSITY Continuity of Operations Planning (COOP)
IS-700.A: National Incident Management System, An Introduction
NATIONAL RESPONSE SYSTEM OPA 90. World spills by size Oil Spills Involving More Than 10 Million Gallons Gallons in millions Rank according to total volume.
Challenges Faced in Developing Audit Plans and Programs 21 st March, 2013.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Part of a Broader Strategy
Unit 8:COOP Plan and Procedures  Explain purpose of a COOP plan  Propose an outline for a COOP plan  Identify procedures that can effectively support.
Inter-Agency Contingency Planning: Concepts & Process
Oil and Hazardous Materials Incident Annex and ESF #10 Home of NCP/NRP Coordination Procedures.
RRT/NWAC Sector Puget Sound COTP/FOSC Report: COTP/ FOSC: Capt Scott Ferguson Presenter: LCDR Wade Gough, USCG June 2011.
NW Area Committee Meeting 13 February, 2013 Heather A. Parker U.S. Coast Guard 13 th District Seattle, WA.
Module IV: Implementing and Monitoring the LEA Plan Systemic Local Educational Agency (LEA) Plan Development.
Private & Confidential1 (SIA) 13 Enterprise Risk Management The Standard should be read in the conjunction with the "Preface to the Standards on Internal.
2004 Co–Chairs Meeting REGIONAL RESPONSE TEAM VII.
Restoring VA Waters the TMDL Way Jeff Corbin Senior Advisor to the Regional Administrator U.S. EPA Region 3.
Some Thoughts On Implementing The IOA Guidelines Within An OPA 90 Framework Greg Buie, National Pollution Funds Center Post- IOSC Ad Hoc IOA Meeting May.
United States Coast Guard RRT BRIEFING USCG SECTOR COLUMBIA RIVER 29 June 2011.
March 20 th, 2014 National Pollution Funds Center and the Oil Spill Liability Trust Fund Update for the Spill Control Association of America 1.
United States Coast Guard U. S. Coast Guard Wrecks and Abandoned Vessels Updates CDR Ed Bock, USCG Office of Incident Management and Preparedness (CG-533)
SOFTWARE PROJECT MANAGEMENT
2004 Co–Chairs Meeting Regional Response Team I Co–Chairs Meeting 2003 Accomplishments / Lessons Learned RRT Membership - State Representation:
UNCLASSIFIED As of W Mar 08 Mr. Scott A. Weidie, J722 1 Multinational Planning Augmentation Team (MPAT) 04 March 2008 Governments and Crises: Roles.
CALIFORNIA’S AIR TOXICS PROGRAM: IMPROVEMENTS TO ASSESS HEALTH RISK Update to the Air Resources Board July 24, 2014 California Environmental Protection.
State Perspectives on Coastal and Ocean Management A Review of A Review of Coastal States Organization’s Recommendations to the US Commission on Ocean.
Planning Ahead: NCP, RCP, Area Plans, LEPC Plans, and Homeland Security.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
Session 161 National Incident Management Systems Session 16 Slide Deck.
Authority: Who Does What?. Los Angeles – Long Beach Area Contingency Plan Marine Firefighting and Salvage Plan.
TOWARDS A COMMON GOAL Coordinating actions under the Clean Water Act (FWPCA) and the Endangered Species Act (ESA)
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Oil Spill Response Plans A History Lesson PHMSA Review and Approval.
CITIZENS ADVISORY COMMITTEE SPRING MEETING MARCH 1—2, 2012 CHARLOTTESVILLE, VA EPA’s Evaluation of Bay Jurisdictions’ Draft Phase II WIPs & Final
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PREVENTION & PREPAREDNESS May 11, 2016 REGIONAL RESPONSE TEAM.
Exercise Presentation. WELCOME AND INTRODUCTIONS.
OPRC Level 3 Spill Management Roles & Responsibilities.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
OPRC Level 3 The Contingency Planning Process. OPRC Level 3.
IS-810: ESF #10 – Oil and Hazardous Materials Response
Coast Guard Sector Lake Michigan Area Committee (SLMAC)
Marine safety Unit Savannah
USCG Roles & Responsibilities During a Ship Fire
Updates from the NRT RRT IV Monica Rusk USCG NRT Coordinator.
Vessel Destruction/TUTAHACA
Continuity Guidance Circular Webinar
IS-700.A: National Incident Management System, An Introduction
Cost Documentation Training
Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Purpose To address the hazards to human health and the environment presented.
Unit 3 Overview This unit introduces you to the Incident Command System (ICS) Functional Areas and roles of the Incident Commander and Command Staff.
Louisiana School Emergency Management Program
Presentation transcript:

Heather Parker D13 DRAT - Seattle, WA Wrecks of the World II 07JUN11 source: Kip Evans Photography

 Systems Approach to Addressing Wrecks and Derelicts under FWPCA/OPA Framework  Defining the Problem – Complexity  What are Wrecks and Derelict Vessels?  Who’s in Charge? Who Pays? When Should/Must Action Be Taken?  Challenges:  Costs, Personnel Issues, Prioritization  Bounding the Problem:  Area Committees  Stakeholder Involvement and Expectations  Phased Approach – Through Area Committees 1.AWARENESS PHASE – Inventory your Area 2.RANKING PHASE – Prioritize (G-A-R) 3.ACTION PHASE  INITIAL ASSESSMENT – DECISION TRIGGERS  REMOVAL OPERATIONS – UNIFIED COMMAND 4.REVIEW AND REVISE  NRT GUIDANCE 2

 This approach, under authorities of CWA, as amended by OPA90, are under the direction of the Federal On-Scene Coordinator (FOSC). CAVEAT: FOSC Involvement will end when threat of oil pollution ends. 3 source: CA DFG source :

 WRECK (for this discussion) is a vessel:  SUNKEN  BEACHED  BURIED  DERELICT (for this discussion) is a vessel:  FLOATING  MOORED  ANCHORED  BEACHED  PARTIALLY SUNK  Usually more accessible 4 Source: Greg Buie, NPFC

5 Vessel TypeWreck (sunken, beached, buried)Derelict (floating, moored, anchored, beached, partially sunk ThreatActively leaking oil Substantial Threat of a Discharge of oil Concern for eventual discharge No concern (e.g. no oil on-board) LocationOffshoreNearshoreInshore River/Lake/Upland DepthDeepShallowAfloatIntertidal Vessel SizeLarge (greater than 200’ LOA) Small (less than 200’ LOA) Source: Greg Buie, NPFC

M/V KALAKALA

ALERT LST LCI -713 RIVER QUEEN EL CONQUISTADOR JEAN SASANOA DAVY CROCKETT MANZANILLO BRETT SCOTT BARGE

 FOSC Decision and Authority to REMOVE OIL from Wrecks and Derelicts  Within the bounds of the NCP, however is somewhere between Prevention and Emergency Response  Must be polluting or pose a threat of pollution to use OSLTF/CERCLA  “SUBSTANTIAL THREAT OF DISCHARGE”  OSLTF funds used primarily for oil removal, NOT salvage.  Under FWPCA, as amended by OPA90, FOSC is authorized response and removal action authority  Salvage/removal only if best method to mitigate pollution threat. 9

10 PREVENTION WRECK/DERELICT OIL REMOVAL RESPONSE TO DISCHARGE source :

 In most cases, there are a limited number of options: 1.Defuel/ DeCargo the Wreck or Derelict 2.Seal/Encapsulate and Monitor 3.Vessel Destruction, Removal, Dumping  Some cases may involve a combination, but often the preferred option will be Defueling or Wreck Oil Removal. 11 source :

 FOSCs will make ultimate decisions, but will want/need input from their Area Committees.  Through a TRANSPARENT, COMPREHENSIVE, DEFENSIBLE Process  Preferably Consensus- Based 12 source :

 COSTS - Oil Removal Ops from sunken or derelict vessels can cost MILLIONS of dollars  PERSONNEL BURDEN - Oil Removal Ops from sunken or derelict vessels can take MONTHS – heavy burden on Sector personnel and other agencies to sustain the response  PRIORITIZATION – How choose which one(s) to work on first? When is the right time to start threat assessment or removal ? What are the triggers? 13

14 GAP: ESTABLISHED NATIONAL GUIDANCE ON FUNDING RESPONSE PLANNING, AND CONTRACTING PROCESSES Adapted from: LTJG Chris Kimrey, IOSC 2011 Presentation

 Defueling a Wreck is a very technically focused operation  Differs significantly from a “classic” spill response to an accidental release  Where we keep responding to yesterday’s bad news  Oil Mitigation Operations on a wreck or derelict is a Prophylactic Response  Typically don’t have many “classic” spill response actions/operations  Shoreline Assessment and Cleanup, Oiled Wildlife Recovery, etc 15

 Stakeholder involvement during a defueling or oil mitigation operation may look and feel different from a more “traditional” oil spill response  May not have as robust staffing throughout all the units 16

1.AWARENESS PHASE – Inventory your Area 2.RANKING PHASE – Prioritize (G-A-R) 3.ACTION PHASE  INITIAL ASSESSMENT – DECISION TRIGGERS  REMOVAL OPERATIONS – UNIFIED COMMAND  Adjust Operations as necessary, utilizing deliberate contingency planning  Public/Political Messaging – early, aggressive, often 4.REVIEW/REVISE PHASE – Comprehensive review of removal op, capture lessons learned, revise protocols/triggers/rankings/ACP as necessary 17

18RANKING ACTION REVIEW/REVISE AWARENESS Incorporate into Annual Area Contingency Plan Updates

 Area Committees need to work together to help determine a COMPREHENSIVE INVENTORY of the wrecks and derelict vessels in their Area.  This is required under OPA90 for Area Contingency Plans  Title IV, section 4202, amended subsection 311(j) of the Federal Water Pollution Control Act with respect to the National Planning and Response System.  Defines Area Committees and Area Contingency Plans, and requirements.  COMMANDANT INSTRUCTION (2000)  AREA CONTINGENCY PLAN ORGANIZATION, CONTENT, REVISION CYCLE, AND DISTRIBUTION  94XX - Risk Assessment  94XX - Planning Assumptions - Background Information  94XX - Planning Scenarios 19

 Area Committees need to work together to help PRIORITIZE INVENTORY of the wrecks and derelict vessels in their Area.  Area Committees must also help determine a set of TRIGGERS FOR ACTION or KEY DRIVERS to aid the FOSC to make a decision to act on a wreck or derelict.  These prioritizations should take into account RESOURCES AT RISK, as well as the VESSEL CONDITION, among other factors. 20

Two primary phases: 1.INITIAL ASSESSMENT – DECISION TRIGGERS  We’ve been triggered to conduct a threat assessment (by drivers/recommendations from Area Committee)  FOSC likely establish limited Unified Command  Set Objectives, Priorities and Endpoints for the Assessment  Typically includes ROV and/or diver surveys, etc.  Might also include real time natural/cultural resource assessment 2.REMOVAL OPERATIONS – UNIFIED COMMAND 1.This is active removal and includes establishing a full UC, daily planning cycles, IAPs, etc. 2.FOSC/UC may want to consider several options for management of these longer-term removal cases:  SECTOR run/managed  Hiring private SMT and Salvors  NST/Strike Team managed  Combination ALSO Consider: 3.MONITOR ING PHASE 21

 After the completion of an Oil Removal Operation, review our progress  Capture Lessons Learned and ensure we are improving our process  Do we need to adjust our Priority Rankings or Triggers for Action for other Area Wrecks/Derelicts?  Area Contingency Plans –  Include a section on Strategies for Wreck/Derelicts  Include FOSC Decision Memo examples:  Funding for Initial Threat Assessment  Reaching Endpoints for an Oil Removal Operation  Tie in to Annual Update Cycle 22 BEST RESPONSE = Includes continual improvement

 Area Committees are “programmed” to respond to accidental releases of oil  Where we are responding to yesterday’s bad news.  Plan for Average Most Probable Discharges, Worst Case Discharges, etc.  Challenge will be to adopt this traditional Area Committee Response Planning Model to Pro-Active mode.  Bound the problem: must be very clear about goals/objectives for wreck oil removal  Endpoints and Objectives of an Operation should be clear and socialized  Stakeholder Engagement and Effective Public and Political Messaging is key. 23 NATIONAL RESPONSE TEAM (NRT) GUIDANCE WILL BE KEY

 Area Committees need to support FOSCs in making informed decisions.  Permitting, Consultations for Sect 7 and Sect 106, EPA- Ocean Dumping, etc  NRT should develop overall consistent National guidance to Area Committees to guide the development of:  Awareness  Ranking and Triggers for Action  Action  Review/Revise  Needs to be keyed to Area Contingency Plans  And Annual Update Cycles  Area Contingency Plans – need to capture these Wrecks and Derelicts as a specific class of issue and include strategies, systems approach, etc. 24

 Wreck/Derelict Oil Removal, under the OPA90 Regime has specific limits and bounds  Once the threat of pollution is gone, FOSC authorities end  Wreck/Derelict Oil Mitigation is “Prophylactic”  Still under NCP and Emergency Response, but not a “classic” response to large oil discharge event  FOSCs need support from Area Committees  Develop TRANSPARENT, COMPREHENSIVE approach to address these sources of potential pollution  This will provide a defensible, repeatable process that will continue on through the 2-3 year change over of Active Duty CG personnel, and help maintain consistency.  Oil Removal Ops – Heavy Personnel Burdens  Can Sectors, Agencies sustain multi-month responses?  NRT – Needs to develop National Guidelines 25

26