CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.

Slides:



Advertisements
Similar presentations
1 Accelerator R&D for Future Large Colliders at IFIC Scientific Staff: A. Faus-Golfe, C. Alabau, J.J. García, S. Verdu, J. Alabau Technical Staff: J.V.
Advertisements

September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
CLIC Kickers: Status and activities for 2013 in view of the budget discussions for 2013 CTC #65 M.J. Barnes CLIC Technical Committee, November M.J.
Applied superconductivity group L. García-Tabarés, F. Toral, I. RodriguezCIEMAT, I/2008.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
CIEMAT ACTIVITIES ON STRIPLINE KICKERS I. Rodríguez.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Review of CIEMAT contributions to linear accelerators L. García-Tabarés, F. ToralCIEMAT, 7/9/2006.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
Key Design Issues and Recent Reviews Tom Peterson, Fermilab DFBX PRR, October 23, 2002 US LHC ACCELERATOR PROJECT brookhaven - fermilab - berkeley.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
Compressor status AWAKE Technical Board meeting 19 August 2015.
Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
TBTS Test Program & Schedule G. Riddone
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
SC Quadrupole Discussion Chris Adolphsen. Comments from Fernando Toral on SC Development for XFEL and ILC.
CTF3 MEETING AT CERN 17/July/ PRESENT STATUS OF THE CIEMAT CONTRIBUTION TO CTF3 Luis García-Tabarés, on behalf of the Accelerators Group at CIEMAT.
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
PACMAN : technical objectives Hélène Mainaud Durand.
First Q4 cold mass engineering follow up meeting 16/03/2016 Q4 Status update H. Felice, M. Segreti, D. Simon and JM. Rifflet.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
ELENA installation progress F. Butin / ELENA collaboration.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
CLIC Parameter Working Group Two Beam Module Design
Status of CIEMAT contribution to CLIC
Oleksiy Dolinskyy December 1st, 2014
PANAGIOTIS FARANTATOS(TE/MSC-MNC)* WP3, ESR 4: New Magnet
STATUS OF CIEMAT CONTRIBUTION TO CTF3 ( )
CSP 25th November 2010 Technical agreement number 3: overview
LARP Phase II Secondary Collimator RC1
Complementary ISTC Projects #3888, 3889p
CLIC-Spain collaboration report
TBL, Status, Plans, Experiments
CTF3 kicker activities at CIEMAT
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
ILC Accelerator Activities at Spain
the MDP High Field Dipole Demonstrator
TBL quadrupole mover prototype development
Conceptual design of superconducting correctors for Hi-Lumi Project
ELENA Magnet Installation Planning
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
ILC Main Linac Superconducting Splittable Quadrupole
Summary of Washington DOE Review
Teleconference ACS – FREIA 19th June 2017
ESS MEBT Quadrupole magnets
2015 January February March April May June July August September
Presentation transcript:

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005

Fernando Toral - Gandía, 3/12/20052 Outline Accelerator capabilities TESLA500 XFEL ILC CLIC Conclusions

Fernando Toral - Gandía, 3/12/20053 Accelerator capabilities Particle superconducting magnets: Magnetic and mechanical design. Prototype fabrication. Testing of magnets up to 400 mm long. Associated components: current leads, power supplies. Conduction-cooled superconducting magnets. High frequency electromagnetic devices: Kicker magnets: design and fabrication of prototypes. RF cavities (PETS for CLIC): design and fabrication of prototypes. Other CIEMAT capabilities: Detectors. Electronics & instrumentation IFMIF

Fernando Toral - Gandía, 3/12/20054 TESLA500 contribution (I)  Design and cost estimation of the superconducting magnet package for the TESLA 500 Technical Design Report (2000).  Design and fabrication of a pair of 100 A HTS current leads (2001).  Design and fabrication of a machine to glue ribbons of superconducting wires (2001): thickness accuracy better than 5 microns for a 130 m long ribbon of 8 wires (0.46 mm x 0.69 mm).

Fernando Toral - Gandía, 3/12/20055 TESLA500 contribution (II)  Calculation and detailed design of a combined superconducting prototype magnet for TESLA500: a quadrupole and two dipoles. ( ) 3- D magnetic calculation for XFEL ** Reference radius is 30 mm.

Fernando Toral - Gandía, 3/12/20056 TESLA500 contribution (III) Calculations Quad coil X-section Double-pancake winding Vacuum impregnation mould

Fernando Toral - Gandía, 3/12/20057 TESLA500 contribution (IV) Assembly mandrel Vacuum impregnation Connection plate Finished magnet

Fernando Toral - Gandía, 3/12/20058 TESLA500 contribution (V) 3- D magnetic calculation for XFEL Training tests (2005)

Fernando Toral - Gandía, 3/12/20059 TESLA500 contribution (VI) 3- D magnetic calculation for XFEL Field quality (2005)

Fernando Toral - Gandía, 3/12/ XFEL contribution  Design of a combined superferric magnet (2005).  Fabrication of four prototypes (2006).  Series production (120 units, ). 3- D magnetic calculation for XFEL

Fernando Toral - Gandía, 3/12/ ILC contribution The TESLA500 prototype magnet will be tested in SLAC (2006) to carefully measure:  The stability of the magnetic axis (better than 5 microns).  The field quality at low currents (persistent currents effect). 3- D magnetic calculation for XFEL

Fernando Toral - Gandía, 3/12/ CLIC contribution 3- D magnetic calculation for XFEL Spanish Contribution as stated in the 2004 Coll. Meeting

Fernando Toral - Gandía, 3/12/ CLIC CONTRIBUTION: 1. Orbit Corrector Magnets (I) MAIN ACTIVITIES DURING THE PAST YEAR: Placement of the Order (December 04) Drawings Approved by CERN (April 05) Tooling development (May 05) Laminations fabrication (June 05) Pre-Series delivery to CERN (2 Magnets) (September 05) Final Approval by CERN (Magnetic Measurements) ( Pending) PRESENT STATUS: All the magnet components are under fabrication Pole fabrication is almost finished (100% stacked & cured, 100% machined, 25% wound & tested) SHORT TERM ACTIVITIES: All the coils will be wound in 3 weeks Magnets will be mounted 4 weeks later : All the units should be finished by the end of the year CONCLUSION: An overall delay of 5 months, but still on time for CTF3

Fernando Toral - Gandía, 3/12/ STATUS OF THE FABRICATION PROCESS 1.- POLE STACKING 3.- WINDING 2.- POLE INSULATION 4.- COIL ELEC. TESTS 5.- FINAL ASSEMBLY (PRE-SERIES) CLIC CONTRIBUTION: 1. Orbit Corrector Magnets (II)

Fernando Toral - Gandía, 3/12/ MAIN ACTIVITIES DURING THE PAST YEAR: Start of the Conceptual design ( March 05) Placement of the Order for the Conceptual Design ( June 05) Technical Design Review of the Conceptual Design at CERN ( July 05). Final Report on the Conceptual Design ( July 05) Placement of the Order for the Fabrication ( October 05) SHORT TERM ACTIVITIES: Fabrication Drawings (December 05) Tooling and Components Fabrication (excl. Coils) (January 06). Coil Fabrication (February 06) Magnet Assembly: Septa Finished (15-March-2006). CONCLUSION: An overall delay of 2 1/2 months, but still on time for CTF3 ( IN THE LIMIT) CLIC CONTRIBUTION: 2. Septa Magnets (I)

Fernando Toral - Gandía, 3/12/ CONCEPTUAL DESIGN CONCEPTUAL DESIGN Thin Septum Thick Septum MAGNETIC CALCULATIONS MAGNETIC MODELLING CLIC CONTRIBUTION: 2. Septa Magnets (II)

Fernando Toral - Gandía, 3/12/ MAIN ACTIVITIES DURING THE PAST YEAR: Visit to Frascati to start contacts with INFN about the kicker design. (February 05) Placement of the order to purchase HFSS (April 2005) A new engineer joints the team, devoted specifically for this development (August 05) Arrival of the HFSS license to CIEMAT & Installation on a specific PC (3GHz,2Gb RAM) (August 05) First simulation of a Stripline Kicker based on INFN previous designs (September 05) New visit to Frascati. Discussion about specifications, model geometries and kicker optimization parameters. (October 05). Starting of calculations & simulations of a real magnet (November 05) SHORT TERM ACTIVITIES: Conceptual Design of the Kicker Magnet ( March 05) Drawings for Fabrication ( April 05) CONCLUSION: An overall delay of about 4 months, but correction actions can be taken to have the magnet finished by the end of 2006 CLIC CONTRIBUTION: 3. Kicker magnet (I)

Fernando Toral - Gandía, 3/12/ STUDY OF DIFFERENT CROSS-SECTIONS: IMPEDANCE CALCULATION MAGNETIC & ELECTRIC FIELD CALCULATIONS FROM THE COMPLETE GEOMETRY CLIC CONTRIBUTION: 3. Kicker Magnet (II)

Fernando Toral - Gandía, 3/12/ MAIN ACTIVITIES DURING THE PAST YEAR: First meeting with SLAC to discuss a possible collaboration with LLNL for the development of the kicker pulser. (Very Unlikely). (May 05) Contact with Spanish Industry to develop this pulser which has other potential applications (Feb-Nov 2005) SHORT TERM ACTIVITIES: To be defined CONCLUSION: A decision must be taken on how to continue with this development. Spanish participation on her own seems very difficult CLIC CONTRIBUTION: 3bis. Kicker Power Supply

Fernando Toral - Gandía, 3/12/ MAIN ACTIVITIES DURING THE PAST YEAR: of s for the Analysis of solutions for the Moving Table ( March 05) Moving Table Conceptual Design (October 05) Moving Table Component Selection (October 05) Moving Table Technical Design presentation at CERN (November 05) SHORT TERM ACTIVITIES: Validation of Design and Components ( December 05) Drawings of the MT Prototype ( February 05) Fabrication of the MT Prototype (June 05) CONCLUSION: Initial planning has been changed significantly to stress the work on the Moving Table as Magnet Design and Fabrication seems a more conventional activity. CLIC CONTRIBUTION: 4. TBL QUADS (I)

Fernando Toral - Gandía, 3/12/ Section at the Horizontal Actuator Section at the Vertical Actuator TBL QUADS MOVING TABLE CLIC CONTRIBUTION: 4. TBL QUADS (II)

Fernando Toral - Gandía, 3/12/ MAIN ACTIVITIES DURING THE PAST YEAR: Market survey for PETS fabrication in Spain (Jan-Sep 05) Purchasing of the HFSS software (August 05) A new engineer joints the team, devoted specifically for this development (Nov 05) First trials to machine one small PET octant at CIEMAT (Sep-Dec 05) Placement of the order to manufacture a 400 mm PET Octant at the Industry (Oct 05) SHORT TERM ACTIVITIES: Reception of the first industrial prototype of PETS octant (January 06) Verification of CIEMAT PETS Octant ( February 06) Stay at CERN of the CIEMAT engineer for the full PETS design (Nov-?? 06) CONCLUSION: Relevant modifications have been made in the planning due to the delay in the starting of the new engineer (design has been substituted by fabrication) CLIC CONTRIBUTION: 5. PETS

Fernando Toral - Gandía, 3/12/ Conclusions The Superconductivity Laboratory CIEMAT- CEDEX has been collaborating with different linear accelerators since 2000: TESLA500, XFEL, ILC, CLIC. Former contributions were superconducting magnets, now we are also including HF electromagnetic devices.