1 Terramin TSF Base Lining Examining the design criteria :– a risk based design process Agenda for Strathalbyn CCC Meeting Review of the relevant components.

Slides:



Advertisements
Similar presentations
TERRAMIN AUSTRALIA Limited Angas Zinc Project. Water Topics –Water sources –Outcomes –Risk identification, management, control –Mine water demand –Modelling.
Advertisements

Lorong Halus Interchange Introduction: Project to build a new $26 million interchange for the Tampines Expressway starting The site was situated.
By Chris Ford and James Hughes ( ) ( )
Leachate Collection Systems. Class Objectives  To discuss landfill water balance  To present liner and leachate collection system (LCS) design information.
Chapter F.A.C. Updates F. Thomas Lubozynski, P.E. Waste Program Administrator.
1 Results Based Regulation Implications for Municipal Solid Waste Management Presented By: Blake E. Nesbitt Saskatchewan Ministry of Environment SUMA Convention.
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
Curt Madsen, P.E. TRC Environmental Corporation Landfill Leachate Collection System Design CEE 427.
Environment Engineering I
Presented by: Jonathan Silvester Oliver Kiernan. Maxey Flat Site Located in Fleming County, Kentucky Low level Nuclear Disposal Facility o Isolate waste.
SAFETY EVALUATION OF AURUL TAILINGS POND June 2003 MONTREAL The case study dedicated to Aurul tailings pond illustrates the use of risk analysis for developing.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
LEQ: How does water move through underground layers of soil and rock?
Nunavut Water Board Public Meeting Water Licence Amendment Rankin Inlet 3AM-GRA-1015 January
This training was prepared by the U.S. Department of Agriculture (USDA) team of Sarah Librea-USDA Foreign Agricultural Service (Team Leader), Jon Fripp.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
Analyses of Rainfall Hydrology and Water Resources RG744
1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
4.5 Pounds of Trash are produced Per Person Per Day Where Does our Trash Go? 27% Recycled 16% Burned 57% Landfilled Nationally: 31% Recycled 69% Landfilled.
Events Systems Paradigms Iceberg Model for Systems Thinking Patterns.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Water Management Planning An essential component of the MMP
Issues Raised in the 11/09/01 Notice of Data Availability (NODA)  Definitions and implications of “catastrophic” and “chronic” design standard for holding.
EnE 301: ENVIRONMENTAL ENGINEERING
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
Subsurface drainage – Investigations
Construction And Analysis Of Hydrographs Hours from start of rain storm Discharge (m 3 /s) Base flow Through flow Overland.
Integrated Constructed Wetlands Regulatory Aspects - the EPA’s role Aoife Loughnane Inspector, Environmental Licensing Programme Environmental Protection.
Presented by: Tony Serdenes, Greenman-Pedersen
Italy: developments in the new legislation and progress in the remediation of contaminated sites F. Quercia, APAT Tour de Table NATO CCMS Pilot Study Meeting.
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
TERRAMIN AUSTRALIA Limited
Diversion of Flood Water from Ganga at Kanpur.  Introduction  Study Area  Flow Pattern of Ganga at Kanpur  Quantification of Divertible Flood  Downstream.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
Regulatory Framework for Uranium Production Facilities in the U.S.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Clarification of the Proposed ELG Request for comments (Item A.2, p 182) Alternative Groundwater Assessments.
Montana Resources Conceptual Plans for Permitting Continued Mining September 15, 2015.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Journal #12 What is an aquifer?
URANIUM: The Mines & Radioactive Waste Left Behind.
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
Topic #3 Fresh Water Systems Topic #3 – Fresh Water Systems Less than 1% of the world’s water supply is available for drinking, cooking and other purposes.
Milking Center Wastewater Treatment Created by Josh Appleby, MAEAP Verifier, MDA.
GO C3Analyze and Evaluate Mechanisms Affecting the Distribution of Potentially Harmful Substances within an Environment. Transport of Materials Through.
David K. Paylor Virginia State Board of Health March 17, 2016.
Track Drainage CE2303 Railway Engineering. Drainage-General Drainage is the natural or artificial removal of surface and sub-surface water from an area.
MIAMI-DADE COUNTY REGULATORY AND ECONOMIC RESOURCE DEPT. DIVISION OF ENVIRONMENTAL RESOURCE MANAGEMENT (DERM) “THE PERMITTING PROCESS TO DISPOSE OF STORMWATER.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
Mandatory Requirements of Ecological Solid Waste Management Act (RA 9003) on CLOSURE AND REHABILITATION OF DUMPSITES.
Draft Year: 1974 Amended: 1984& 1996 National legislation.
Sanitary Engineering Lecture 4
CVE 515 EMBANKMENT DAM ENGINEERING ENGR S.O ODUNFA DEPT. OF CIVIL ENGINEERING UNIVERSITY OF AGRICULTURE, ABEOKUTA.
Chapter 16 Landfill Liners and Geosynthetics
Tailings Dam Stability
AIRPORT SURVEYS.
a) Water stored in the rocks below ground
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
Upland Landfill Waste Discharge Application 7295 Gold River Highway
HYDROSPHERE 2.
Storm Water Storage and Treatment
17.7 Single Clay Liner and Single Geomembrane Liner Systems
HYDROLOGIC CYCLE & GROUNDWATER
Scientific or Engineered Landfilling of Waste
What to Expect When You’re Inspected
Preciptation.
Chapter Four RUNOFF When a storm occurs, a portion of rainfall infiltrates into the ground and some portion may evaporate. The rest flows as a thin sheet.
Coal Waste Storage Area Pond Design/Build Project Stanton Energy Center Chip Merriam Chief Legislative & Regulatory Compliance Officer.
the path less traveled Termination of Post Closure Care
Presentation transcript:

1 Terramin TSF Base Lining Examining the design criteria :– a risk based design process Agenda for Strathalbyn CCC Meeting Review of the relevant components of the TSF Guidelines developed specifically for the project Interaction between PIRSA and the EPA Specific design criteria How will the TSF perform? –Importance of underdrains (flow net analyses) –Filling schematics How will the TSF be monitored? How will the pond size fluctuate? What happens if decant pond exceeds design area? How will the TSF be closed (decommissioned)? Some relevant images

2 What are we looking at?

3 Design guidelines were developed by PIRSA and the EPA specifically for this project Guidelines for the Management of Tailings at the Proposed Angas Zinc Project, Strathalbyn, South Australia

4 These design guidelines were based around the following In view of the high potential for contamination from any discharge from this site, and the outcomes – be they real or perceived, in this environmentally important location, the environmental outcome set for the proponents to meet is: No contamination of natural water drainage systems, ground water, land and soils either on or off site during operation and indefinitely post closure caused by mine ore or waste material. –This is intended to primarily cover surface or underground seepage containing AMD or heavy metal ions or the transport of solid waste products as a result of embankment failure, weathering or dusting.

5 The Evolution of the TSF Liner System The original ATC concept design involved the conventional “best practice” earthen base. This avoids the “bath tub effect”, expedites consolidation of the tailings - and any seepage into the ground is intercepted at the site boundary and pumped back into the TSF. The EPA advised that the regulations required that the underlying soil had to be totally protected from seepage – hence a HDPE liner was stipulated for the whole TSF and the tailings were to be thickened before discharge into the TSF. Rather than using seepage through the subsoil to monitor for leaks, the EPA stipulated the need for a “leak detection layer” comprising a double liner where required (a fail-safe design). It was agreed that if there was no “pressure head” on the HDPE there was no risk of a leak even with a hole in the liner and hence the issue was to establish how much of the TSF needed to be double lined

6 Design criteria established for ATC The double liner to the TSF was to extend beyond the edge of the “design” decant pond to a distance of twice the width of the “design” decant pond. (With underdrains this was expected to limit the phreatic surface to within the area of the double liner – and this was to be justified by modeling) As the decant pond will be doubling as the mine storm water pond, the “design” area was to be justified in terms of a pond size that is not likely to be exceeded more than say once a year (as determined by rainfall records).

7 EPA response The EPA then applied the requirement that in the event of a storm (or whatever) that resulted in the pond exceeding the “design” boundaries, the excess water was to be removed such that the pond is reduced to the design area within seven days (this period is still under review). The operators will be required to show how they intend to dispose of the excess water. The approval to operate will most likely require that the infrastructure needed to expedite the removal of excess water is permanently commissioned.

8 Elements of the design How was the area of the “design” decant pond determined? How is the phreatic surface to be restricted to the area covered by the double liner? How will the tailings be discharged into the TSF and how will it fill? What is the decant and how will it operate? How will the maximum area of the decant be monitored? How will the tailings be prevented from polluting into the future?

9 Determination of “design” pond area

10 Should be considering volume rather than area, but with consistent beach slopes there is a relatively consistent relationship between the two as shown below. 100 yr (ARI) event “design” pond “Mean” pond

11 Final filled condition with “design” pond area

12 How will it perform? – (under drain details)

13 Flow net shown in Appendix U – has no legend

14 What are we looking at?

15 These contours show pressure head. ( 10 kPa approximately equivalent to 1 m water)

16 Similar picture as for total head analysis

17 Simpler to see the actual water head on the base liner and the effect and indeed vital importance of the tailings underdrains

18 Relevant design details The TSF has been designed to perform as simulated in the flow net analyses. A few design details are now covered

19 The details of the collection and monitoring system for the leak detection layer

20 The leak detection layers will drain in zones

21 The details of the embankment liner

22 The details of the decant tower and embankment

23 Proposed filling sequence A series of 5 drawings have been prepared by ATC to show the extent of deposited tailings and the “design” decant pond at various stages during the life of mine. These assume that the throughput of the plant is uniform and continuous and that 100% of the tailings are directed to the TSF.

24 At 2.46 months (tailings do not extend beyond double liner)

25 At 3.15 months

26 At 17.4 months

27 At 45.6 months

28 At 61.8 months (FULL)

29 Monitoring extent of “design” pond The operating conditions set by PIRSA and the EPA will require that: The edge of the “design” decant pond does not extend beyond a distance of half the extent of the double liner. How this is to be monitored has yet to be finalised, but one concept would be to install sight boards. For example:

30 Sighting boards sight lines during initial operations

31 Sighting boards sight lines at final fill

32 What happens if the decant pond exceeds the “design” area of 15,000 m 2 (volume 8,000 m 3 )? The 100 year ARI flood collecting on the TSF from its catchment has been estimated to add a area of water of around 38,000 m 2. A volume of the order of 28,000 m 3 according to ATC Fig 7. The excess water can be removed at a rate of around 390 m 3 a day using the available capacity of the decant pump. This means that if the decant pond contains say 1,000 m 3 (mean area of 4,000 m 2 ) before the flood occurs it will take about 64 days to get the decant pond back to the allowable size. The questions are whether the phreatic surface will extend to the edge of the double liner within that time and if so – what special approved measures will have to be on hand to expedite the removal of the excess water.

33 The question will be how quickly the phreatic surface advances through the tailings and this is a function of the permeability of the tailings. Modelling currently under way by ATC suggests that even with the 100 yr ARI flood, that the phreatic surface will not reach the boundary of the double liner in 6 months. This however has yet to be confirmed.

34 Progression of phreatic surface

35 The TSF will have sufficient water storage capacity at all times during its life to contain the 100 year ARI flood. 100 yr flood 30,000 m 3

36 How will the TSF be decommissioned on closure to prevent long term contamination?

37 A flow net analysis has shown that leaks through the embankment liner will flow to the collection drain