INSTALLING CONSTRUCTED WETLANDS. CIDWT disclaimer These materials are the collective effort of individuals from academic, regulatory, and private sectors.

Slides:



Advertisements
Similar presentations
U.S. Environmental Protection Agency Office of Research and Development Rain Garden Research at EPA’s Urban Watershed Research Facility Emilie K. Stander,
Advertisements

Land Use Program Septic System Overview Scott Weldon
Constructed Wetlands pp CIDWT Disclaimer These materials are the collective effort of individuals from academic, regulatory, and private sectors.
Onsite Wastewater Treatment Systems Module 4:1. What is a Septic System? Module 4:2 Photo credit: MOEE.
Tech 110: Pretreatment Technologies Between the tank and the soil.
EARTHEN PONDS LAKES & RESERVOIRS
Inspection of Disinfection Components NC Certified Subsurface Systems Inspector Training School.
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
Foundation Systems.
Manure Storage During A Dairy Modernization Robert Wilson WI Department of Agriculture Trade and Consumer Protection Brian J. Holmes University of Wisconsin-Madison.
MAINTENANCE PART 2. Inlet free of obstructions Inlet free of obstructions Adequate scour protection provided.
Land Application Wastewater Systems Provides 2 o Treatment (Biological) Used in combination with pretreatment and primary treatment Often called Natural.
Successful OWTS Treatment Siting –Site Evaluation –System Location Design –System Sizing –System Selection and Design Installation Operation/Maintenance.
Chapter 18 Foundations.
Sanitary Engineering Lecture 16
CONSTRUCTING A FIVE CABIN LATRINE
Office of Sustainability Presented by Sofia Habity EROSION AND SEDIMENTATION CONTROL.
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
Chapter 2b Foundations Shallow & Deep Foundations.
The sand filter has to be moved from this location. The embankment cross section used in the slope stability analysis did not include the sand filter.
Inspecting Construction of Bioretention Facilities Carlton Thompson and Jeff Cowling.
Seasonal High Tunnel Systems for Crops Interim Standard 798 Technical and Program Guidance National bulletin: National Bulletin: Idaho.
Problem: surface ponding. Solution: surface or subsurface drainage.
Bottom Liner System The bottom liner prevents the trash from coming in contact with the outside soil, particularly the groundwater. In MSW landfills,
Conservation Strategies for Growing Communities. The Growth of Urban Conservation.
Produced by the Northwestern Indiana Regional Planning Commission Community Partnership Produced by the Northwestern Indiana Regional Planning Commission.
Preparing Foundations for Cylinders & ASME Tanks
Hydro Reservoir measures 18” x 18” x 6” Two Piece Hydro Reservoir Lid and Base Holds up to 6 Gallons of Water 3 Easy Access Openings for Watering and Feeding.
SANITARY ENGINEERING Planning, designing and installation of system for the collection, conveyance, treatment and disposal of the waste.
Seasonal High Tunnel Systems for Crops Update on interim standard 798 Technical and Program guidance National bulletin: National Bulletin:
Introduction to Environmental Engineering Dr. Kagan ERYURUK
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
It All Starts Here... A day in the life of your waste water...
 Holds water in the landscape so it infiltrates (drain) into the ground.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Let’s Begin! Writing Manure Management Plans!. Manure Management Manual DEP Manure Management Manual can be divided into 3 Parts: Part I Requirements/Guidelines.
C.I.Agent ® Polyvinyl Blanket A Spill Containment and Hydrocarbon Filtration Solution.
Sanitary Engineering Lecture 13
Construction Inspection for FO Activities - Geosynthetics
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
RESEARCH AND DEMONSTRATION CENTER ON-LOT SYSTEMS AND SMALL FLOW TECHNOLOGIES DELAWARE VALLEY COLLEGE DOYLESTOWN, PA Project Funding Provided by: Pennsylvania.
Floor Systems and Foundation Support
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Animal, Plant & Soil Science Animal, Plant & Soil Science E4-9 Drainage.
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Leads Institute of Technology & Engineering
WASTEWATER.
Foundation – jay Desai.
CONSTRUCTION OF A DTF DO’s and DON’Ts.
Design and Construction of Composite Lined Landfills
TECHNICAL SPECIFICATION AND REQUIREMENTS
LIMITING IMPERVIOUS SURFACE COVERAGE USING POROUS TECHNOLOGIES
Sewage Treatment.
Octopot with Octo-Grid Set Octopot.com
Homeowner Responsibility
What is an on-lot sewage system?
Maintenance of the On-Lot Sewage System
Private Septic Systems
Septic System Failure GET PUMPED!.
4th Annual Construction Law Summit
This system consists of a septic tank, constructed wetland, and land application system. The wetland consists of a bed of graded stone with water flowing.
Septic System Construction and Location
Private Septic Systems
On-site Wastewater Treatment Systems
What to Expect When You’re Inspected
6.1 Configuration of sedimentation tank
Homeowner Responsibility
Coal Waste Storage Area Pond Design/Build Project Stanton Energy Center Chip Merriam Chief Legislative & Regulatory Compliance Officer.
Presentation transcript:

INSTALLING CONSTRUCTED WETLANDS

CIDWT disclaimer These materials are the collective effort of individuals from academic, regulatory, and private sectors of the onsite/decentralized wastewater industry. These materials have been peer-reviewed and represent the current state of knowledge/science in this field. They were developed through a series of writing and review meetings with the goal of formulating a consensus on the materials presented. These materials do not necessarily reflect the views and policies of the Consortium of Institutes for Decentralized Wastewater Treatment (CIDWT). The mention of trade names or commercial products does not constitute an endorsement or recommendation for use from these individuals or entities, nor does it constitute criticism for similar ones not mentioned.

NDWRCDP disclaimer This work was supported by the National Decentralized Water Resources Capacity Development Project (NDWRCDP) with funding provided by the U.S. Environmental Protection Agency through a Cooperative Agreement (WPA No. X ) with Water Environment Research Foundation (WERF) in Alexandria, Virginia. These materials have not been reviewed by the U.S. Environmental Protection Agency, NDWRCDP, or WERF. The contents of these materials do not necessarily reflect the views and policies of the NDWRCDP, WERF, or the U.S. Environmental Protection Agency, nor does the mention of trade names or commercial products constitute their endorsement or recommendation for use.

Overview for Constructed Wetlands  Introduction  Types  Site preparation  Excavation  Liners  Borders  Media  Inlet & outlet devices  Vegetation  Startup

Constructed wetlands  Recreate treatment processes that occur in natural wetlands

Constructed wetland  Basin/cell containing microorganisms, media, and plants that treat effluent  Effluent flows horizontally through bed

Treatment in CW  Requires pretreatment Typically a septic tank Typically a septic tank  Pathogens and nutrients removed by microbes on surfaces of media & plant roots  Processes involved Sedimentation Sedimentation Nitrification Nitrification Denitrification Denitrification Adsorption Adsorption

Treatment

Hydraulic detention time  Amount of time effluent is in contact with and in the treatment media  The longer the wastewater is in the wetland… the better the quality of the exiting effluent! Typical warm weather design 3 days Typical warm weather design 3 days Typical cold weather design 10 days Typical cold weather design 10 days

Installation Form 10.5 installation checklist: constructed wetlands

1. Types  Identify flow regime Free water surface Free water surface Subsurface flow Subsurface flow Combination Combination

1. Type  Number of cells Single cell Single cell Multiple cell Multiple cell First cell linedFirst cell lined Second cellSecond cell May be unlined May be unlined May be lined with natural clay soil May be lined with natural clay soil compactedcompacted

1. Type  Dimensions Length, width, depth Length, width, depth Follow design Follow design Length to width (aspect) ratio, and depth are significant Length to width (aspect) ratio, and depth are significant

2. Site preparation  Stake out cell location Include area for berm or border Include area for berm or border  Check elevations Very important if gravity fed Very important if gravity fed  Remove excessive vegetation from footprint  Test soil moisture

3. Excavation  Record excavation equipment used  Walls typically vertical Consider using a trencher to cut walls before excavating Consider using a trencher to cut walls before excavating  Design may call for a more artistic form Gentle curves Gentle curves

3. Excavation  Bottom should be free of water, rocks, debris, roots, etc.  Grade according to design Slope is in correct direction Slope is in correct direction Level across width Level across width  Bedding material as cushion for liner Soil, geotextile fabric, bentonite clay Soil, geotextile fabric, bentonite clay

4. Liner  Liner keeps wastewater in cell Polyethylene Polyethylene Neoprene Neoprene Butyl rubber Butyl rubber Compacted native clay Compacted native clay Bentonite clay Bentonite clay PVC PVC Hypalon (HDPE) Hypalon (HDPE) Ethylene Propylene Diene Terpolymer (EPDM) rubber Ethylene Propylene Diene Terpolymer (EPDM) rubber

4. Rubber/poly liners  Smooth bottom & sides to remove creases  Tuck in corners and fold the liner  Liner can be purchased custom cut to fit

4. Bentonite liners  Spread bentonite clay on bottom of wetland Often about 1-2 pounds per sq foot Often about 1-2 pounds per sq foot  Plastic liner 4-6 mil over the bentonite to prevent expansion into media

4. Liner  Liner should extend higher than water and media level  Protect from sun  Orient correctly when unfolding  Watertight Single piece preferable Single piece preferable Seams must be sealed Seams must be sealed Test by ponding water over the liner Test by ponding water over the liner Check for holes or defects Check for holes or defects

5. Influent distribution  Types Perforated pipe Perforated pipe Leaching chamber Leaching chamber  Record length of device Should extend most of the width Should extend most of the width  If gravity fed, device must be level and stable  Elevation must match design  Accessible for O&M Cleanouts/inspection ports Cleanouts/inspection ports  Protected from clogging

5. Influent distribution  Penetrations must be watertight Boot Boot Concrete around pipe Concrete around pipe Mastic and pipe clamp Mastic and pipe clamp Bentonite clay Bentonite clay

6. Effluent collection  Often slotted pipe across wetland  Larger gravel placed around pipe  Liner penetration must be watertight  Cleanout/inspection port

6. Water level control  Controls water level  Rotational control Elbow can be rotated Elbow can be rotated  Vertical control Additional pipe length Additional pipe length Sleeved pipe Sleeved pipe

7. Media  Most commonly washed rock  Use what is designated in the design  Media must be Clean- if it is not, don’t use it Clean- if it is not, don’t use it Properly graded Properly graded Rounded so it won’t puncture the liner Rounded so it won’t puncture the liner  Do not contaminate the media with dirty equipment or by placing it on soil

7. Media  Document media depth  Do not damage liner as you add media Geotextile fabric over the liner Geotextile fabric over the liner May add water to the cell as a cushion May add water to the cell as a cushion  The top of the media should be level Add water to cell and temporarily adjust water level to be at the desired media level Add water to cell and temporarily adjust water level to be at the desired media level

8. Vegetation  Provide oxygen to bed  Removes a small percentage of nutrients  Must be able to survive in a saturated medium  Must survive in climate Design should call for plants that can overwinter in that area Design should call for plants that can overwinter in that area

8. Plants  Not all CW will have plants All free surface wetlands must have plants Design should specify plants  Clean roots to remove soil  Plant on a grid pattern Follow design Generally 2′ x 2′

9. Borders  Prevent surface water and soil from entering media  May provide wall support  Types: Stone Stone Concrete Concrete Treated wood Treated wood Earthen berm Earthen berm

9. Wood border  Frames wetland Landscape timber Landscape timber Railroad ties Railroad ties  Place liner over wood frame  Cut liner to fit  Place second wood layer over liner  Rebar for staking wood to ground  May deteriorate over time

9. Concrete borders  Trench border  Construct framing Inlet and outlet Inlet and outlet  Pour concrete border

9. Concrete borders  Excavate soil from within concrete border  Make sure to protect inlet and outlet structures  Generally bentonite liner with plastic cover

9. Rock borders  Rock slate around border to protect liner  Grass cover or protective berm around the wetland  Edging material can assist with maintenance

Startup Form 10.6 startup checklist: constructed wetlands

Startup  Verify all steps in the installation process were completed  Verify water level is at desired depth  If wetland is recirculating, note the recirculation ratio.

Summary  Types  Site preparation  Excavation  Liners  Borders  Inlet and outlet devices  Media  Vegetation  Startup