Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.

Slides:



Advertisements
Similar presentations
Cofferdam.
Advertisements

CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.
Advanced Construction Technology
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
TILT-UP CONSTRUCTION GUEST SPEAKER: KAREN S. HAND, P.E.
Big Pond Tank Mobile, Reusable Construction/Frac-Water Storage.
Construction Sequencing I-15, Ontario, CA HFL Show Case, June 22, 2010 Peter J. Smith, P.E. The Fort Miller Co., Inc.
SPEED and STRENGTH SPEED and STRENGTH  When speed of construction and strength of slab are your concerns, the KWIK SLAB system is your fast and strong.
Click to continue…. Railroad Track wetland Image Date: December 2003.
Tunnelling Across a River Using Immersed Tube Tunnelling Click through the slide show to see key stages in creating a tunnel across a river using Immersed.
Earthwork Operations & Equipments
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
A-ABLE SEPTIC-SEWER SERVICE, INC. MOUND SYSTEM MOUND SYSTEM.
Diaphragm Wall Construction
LNG in-ground tank March 6 th, 2006 Kajima Corporation.
GROUNDWATER CONTROL.
Concrete Pre Cast Panel By Peter Spence ID:
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Retaining Wall Design Slope Stability on US-189 MAQuiGr Engineering
Foundation Systems.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Introduction to a pit-less electronic scale “concrete deck” The scale to be shown is a B-Tek Side/Rail full electronic Platform is 70’x11’ on a slab design.
Foundation Fundamentals GSD 6204 Building Technology Harvard Graduate School of Design.
FOOTINGS.
Fundamentals of Building Construction, Materials & Methods, 6 th Edition Copyright © 2013 J. Iano. All rights reserved. 2 FOUNDATIONS F OUNDATION R EQUIREMENTS.
Chapter 18 Foundations.
COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM
Chapter 2b Foundations Shallow & Deep Foundations.
Introduction to a pit installation
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
Topic B2 Sub-structure groundworks
RLP Installation. RLP Approvals Most Servicing Railroads and ALL Class 1’s (excluding CSX) Require that the scale design, location and functionality be.
Lakes Creek Road Waste Transfer Station Construction highlights.
Foundations. Definition of Foundation The supporting portion of a structure located below the structure and supported only by soil or rock. The purpose.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
Introduction to a Flattop scale The scale to be shown is an Emery/Winslow Flattop Scale Platform is 40’x11’ with site rails. The foundation is a raft.
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
Joints for Diaphragm Walls
M&M Precast, Inc. Project: I-66 Highways for Life Location: Rt. 50 Ramp (East) off I-66 – Fairfax, Virginia VDOT Project No.: (FO) , M501 FHWA.
Bulb Piles –Franki Piles or pressure injected footings –Special form of cast in place pile with an enlarged base for increased load bearing F 10-4 Minipiles,
Presented by Mike Johnson
BUILDING CONSTRUCTION
How To Install a Centrifugal Water Pump. Installation Process First of all, consult the manual book to determine the right process of installation.
Town of East Greenbush Waste Water Treatment Plant Project Monthly Update – September 2014.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
DORS CS#15-24 Home Modification for Removal and carting away of Existing Aluminum Ramp and treated wood platform Demolition, removal and carting away of.
Foundation types and uses
FOUNDATIONS.
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
Section Engineers Meeting March 6, 2014 Lexington, KY.
Floor Systems and Foundation Support
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
Leads Institute of Technology & Engineering
Foundation – jay Desai.
Concrete Repair.
Sardar Patel Institute Of Technology
Big French Creek Slide Timeline of Events
Part 92_4 ”PUR in civil engineering – sealing of retaining walls”
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Arch205 Materials and building construction 1 foundation
Private Septic Systems
Foundations in Low-Rise Construction (up to 3 floors)
Arch205 building construction foundation
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
Private Septic Systems
Pier Foundations Piers Suspended floor Ground beam Next slide.
Steps To Prepare Site For Site Work Construction Calhoun GA.
Presentation transcript:

Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.

Tank 85 Foundation  Tying the cages for the poured piling.  Auger pile boring in progress.  New cage ready to place when gout is poured.

Tank 85 Foundation  The grout in some piling settled and was repaired. Grout was chipped to a clean surface and re-poured.  Pouring the repair.

Tank 85 Foundation  Excavating to sub- grade for the mud slab.  Excavating continues while the mud slab is being poured.

Tank 85 Foundation  Mud slab complete and form setting in progress. Laying out support bars for re-bar work to begin.  Form setting for the slab well under way.

Tank 85 Foundation  First mat of re-bar placed Oct. 24/25,06  Placing top mat Oct. 26/27,06

Tank 85 Foundation  Re-bar is complete and ready for concrete pour Oct. 28, 06.

Tank 85 Foundation  Tying wall dowels and support dowels Oct 27, 06.  Water-stop placed so it can be repositioned while the concrete is being poured

Tank 85 Foundation  5AM Oct 28,06. First two loads of concrete.  Pouring with two pump trucks

Tank 85 Foundation  5:45 AM, pour well under way.

Tank 85 Foundation  Grading in progress prior to setting panels Nov. 2,06.  Preparing to set inner ring wall.

Tank 85 Foundation  7AM Sat. anchor bolts set and checked, re-bar complete, ready to pour.  Pour approximately 40 % at 9:30 AM

Tank 85 Foundation  Ring wall completely poured.  Ring wall stripped and grading for tank contractor started

Tank 85 Foundation  Liner installation well under way.  Liner nearly completed.

Tank 85 Foundation  Ramp in place for placing of sand and entrance of crane and materials  First of many loads of sand,

Tank 85 Foundation  Sand fill covered for the night  Compacting first lift of sand. Tested at