QUALITY ASSURANCE & MATERIALS TESTING DIVISION (QA&MTD)

Slides:



Advertisements
Similar presentations
Course Material Overview of Process Safety Compliance with Standards
Advertisements

September 9, Electrical Safety Division Testing and Evaluation of Electrical Equipment Independent Laboratory Part 6 Workshop.
Radiopharmaceutical Production
MSHA APPROVAL PROCESS Steven Luzik Chief, Approval and Certification Center Chief, Approval and Certification Center.
MSHA - Revised Policies and Procedures for the Prevention of Coal Dust Explosions April 1, 2013.
PPAP Requirements Training
HAZARD COMMUNICATIONS / E N V I R O N H & S T R A I N I N G P R O G R A M HAZARD COMMUNICATION PROGRAM OSHA Standard 29 CFR The OSHA hazard communication.
New 2014 CCC Regulation China Compulsory Certification G&M Compliance, Inc. November 25, 2014.
[Federal Register: June 17, 2003 (Volume 68, Number 116)] [Rules and Regulations] [Page ]
ASME Nuclear Conformity Assessment
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
1. Introduction 1.1. Fire program management involves the identification, evaluation, and control of hazards which may result in a fire OSHA & Emergency.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
FAA FAA Advisory Circular Presented at 9/16/03 Workshop (Chicago, IL) Background – Purpose of the advisory circular – Related regulations & guidance materials.
OPTIMISING CHEMICAL ANALYSIS FOR THE WFD BY QUALITY ASSURANCE PROCEDURES & ACCREDITATION An Overview OPTIMISING CHEMICAL ANALYSIS FOR THE WFD BY QUALITY.
 QUALITY ASSURANCE:  QA is defined as a procedure or set of procedures intended to ensure that a product or service under development (before work is.
Quality Assurance/Quality Control Policy
Independent Laboratory Testing PART 6 Regulations Mechanical & Engineering Safety Division Robert Setren Mechanical Engineer.
12 th U.S./North American Mine Ventilation Symposium John Ascuaga’s Nugget Casino Resort Reno, NV, USA June 11, 2008.
SAFETY AUDIT. 2.1 Definition of audit. Critical systematic inspection of an organization‘s activities in order to minimize losses due to accidents.
5.2 Personnel Use competent staff Supervise as necessary
Hallmark Certification. Agenda Ten Year Certification  Term of Certification Background 1.4 year term of certification 2. 8 year term of certification.
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
SELECT Scheme Provider Certification of Construction (Electrical Installations to BS 7671)
Fire Fighter Fatality/Injury SCBA Evaluation Overview Thomas Pouchot General Engineer National Institute for Occupational Safety and Health National Personal.
Huzairy Hassan School of Bioprocess Engineering UniMAP.
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
World Health Organization
UN ECE Sectoral Initiative on Equipment for Explosive Atmospheres 7 September 2011 United States Department of Labor Mine Safety and Health Administration.
External Operations Experience Update: NRC Information Notices: Qualification of Safety-Related Components and Antifreeze Agents in Fire Water Sprinklers.
Product Ratings and Performance Certifications Presented by: Tom Gustafson, Hartzell Fan, Inc. AMCA International Technical Seminar 2009.
DOCUMENTATION.
NE 110 – Introduction to NDT & QA/QC Definitions Prepared by: Chattanooga State Community College.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
NMA/MSHA Approval Workshop MSHA Approvals Approval and Certification Center May 21 and 22, 2008.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
Change to Project Title
From Research Prototype to Production
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
Presented by Steven P. Feltman Food Safety and Quality Specialist.
INTRODUCTION TO AUDITING
NMA/MSHA Approval Workshop Electrical Safety Division Approvals May 21 and May 22, 2008.
© MSA Understanding the New ASTM F Standard for Personal Climbing Equipment MSA WebCast February 21, 2006 Presented by: Joseph Feldstein Manager.
Important informations
1 Regulatory Aspects of Pharmaceutical Excipients PQRI Workshop Nick Buhay Acting Director Division of Manufacturing and Product Quality Office of Compliance.
What Documentation Needs to be Submitted With an Approval Application?
Hunt’s Taylor Creek Contractors Training on new Hazard Communication Standard 29 CFR
30/02/2008 Dept. of Pharmaceutics 1 Salient Features of Quality Assurance Dr. Basavaraj K. Nanjwade M.Pharm., Ph.D Associate Professor Department of Pharmaceutics.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
Standards, Training, and Certification in the Wastewater Industry Presented by: Bob Murphy, Sherwin Williams.
Project specifications Division 1- general conditions Division 2- sitework Division 3- concrete Division 4- masonry Division 5- metals Division 6- carpentry.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
14 March 2002Update on SDoC - USA1 Update on Supplier’s Declaration of Conformity – USA William Hurst Federal Communications Commission Office of Engineering.
Most Common Deficiencies Cheryl O. Morton Managing Director, AIHA Laboratory Accreditation Programs, LLC.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Responsibilities of Test Facility Management, Study Director, Principal Investigator and Study Personnel G. Jacobs Belgian GLP Monitorate Zagreb, 17 December.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
GOOD MANUFACTURING PRACTICE FOR BIOPROCESS ENGINEERING (ERT 425)
ISO/IEC
Presentation Title Goes Here
CDRL E003 CFAT REPORT TEMPLATE
Fabric Air Dispersion Systems
Good Laboratory Practices
HART Technologies Process Overview
DOE Review of the LCLS Project October 2006
Radiopharmaceutical Production
Presentation transcript:

QUALITY ASSURANCE & MATERIALS TESTING DIVISION (QA&MTD)

QA&MTD CHEMISTPHYSICAL SCIENTISTS INTERDISCIPLINARY ENGINEERS MINING EQUIPMENT COMPLIANCE SPECIALISTS John Faini – Division Chief TECHNICIAN TEAM LEADER

QA&MTD MISSION Maintain Integrity of MSHA Approval QA - ensures mine equipment manufacturers continue to make the equipment as it was approved Approval/Acceptance/Suitability of Mining Materials MTD- evaluates mining materials to the applicable requirements of 30 CFR and voluntary standards

QA&MTD PROGRAMS Product Audits Technical AssistanceApprovals* Field Complaints Permissibility TrainingAccident Investigations

QA&MTD Approval/Acceptance/Suitability of Mining Materials QA&MTD evaluates mining materials to the applicable requirements of 30 CFR and voluntary standards, typically for flame resistance

QA&MTD APPLICANT An individual or organization that manufactures or controls the assembly of a product and that applies to MSHA for approval of that product. Controls the assembly – design specifications must be specific to the applicant applicant must provide oversight of the manufacturing process

QA&MTD FLAME RESISTANT- MATERIAL APPROVAL PROGRAMS The A&CC Conducts Product Audit Flame Tests Flame Tests are Conducted at Applicants’ or 3rd Party Lab Cables: Power, Signal, Fiber Optic, Co-Axial & Splice Kits Brattice Cloth & Vent Tubing PART 7 APPROVALS

Submit: Application Form Certified Statements Testing Schedule Cross Sectional Drawing

PAR No. ______________, Company Code No._____________ PAR No. ______________, Company Code No._____________ We [insert name] certify that the cable meets the design portion of the technical requirements as specified in 30CFR, Subpart 7K, Section We [insert name] certify that the cable meets the design portion of the technical requirements as specified in 30CFR, Subpart 7K, Section We [insert name] certify that we will perform the Quality Assurance requirements of 30CFR, Subpart A, Section 7.7. We [insert name] certify that we will perform the Quality Assurance requirements of 30CFR, Subpart A, Section 7.7. ______________________________________ ______________________________________ Signature of Authorized Company Representative Signature of Authorized Company Representative Further; Further; After completion of the required cable testing, the applicant must certify that the cable meets the performance portion of the Technical Requirements as specified in 30CFR, Subpart 7K, Section However, if an MSHA representative witnesses the testing, this statement is not necessary. After completion of the required cable testing, the applicant must certify that the cable meets the performance portion of the Technical Requirements as specified in 30CFR, Subpart 7K, Section However, if an MSHA representative witnesses the testing, this statement is not necessary. We __________[insert name]________ certify that the cable meets the performance requirements of Subpart K, [choose one]: Section (power cable) or Section (signal/fiber optic/co-axial) as specified in 30CFR, Subpart 7K, Section We __________[insert name]________ certify that the cable meets the performance requirements of Subpart K, [choose one]: Section (power cable) or Section (signal/fiber optic/co-axial) as specified in 30CFR, Subpart 7K, Section ___________________________________________ ___________________________________________ Signature of Authorized Company Representative Signature of Authorized Company Representative

QA&MTD FLAME RESISTANT - MATERIAL APPROVAL PROGRAMS 30CFR Part 18 Acceptances Conveyor Belt Conduit Hose Fire Suppression Hose Jacket Fire Hose Liner Battery Box Insulation Cable Reel Insulation Non-Asbestos Packing MaterialLife Lines

QA&MTD VOLUNTARY - FLAME RESISTANT ACCEPTANCES Flame Resistant Solid Products Taken Into Mines Hydraulic/Air/Water Hose Jacket Belt Wipers/Skirt/Impact Bars Roof/Rib Grid Material Hydraulic Hose Protective Sleeve

Submit: Application Form Toxicity Statement Test Samples QA Plan

a. Procurement procedures for the components or ingredients of the product, b. Manufacturing practices to maintain the formulation, c. Procedures for record keeping, such as test results, etc. d. Critical Characteristics that will be flame tested or inspected to ensure that the finished product meets the flame resistance test requirements.

Acceptance Formats Typically 30CFR Part 18 Acceptance will have this format: 18-CBXXYYYYY/0 - for conveyor belt (2G) 18-FHXXYYYYY/0 - for fire hose liner (2G) 18-FSXXYYYYY/0 - for fire suppression hose cover (2G) 18-HCXXYYYYY/0 – for hose conduit (2G) Voluntary Acceptances will have this format: IC-xxx/00 However, when there is a dual use product such as fire suppression hose cover & hydraulic hose cover, the acceptance number may look like this: “2G-IC-xxxC/0”

QA&MTD VOLUNTARY EVALUATIONS “SUITABILITY” Ventilation Products – 30CFR Part Sealants – Strength Enhancing & Non-Strength Enhancing Non-strength Enhancing ASTM E-162 – (Flame spread index of less than 25) Strength Enhancing ASTM E-162 & ASTM E-72 ( 39 PSF min. average.)

Submit: Application Form Toxicity Statement Sample QA Plan Testing Schedules

VOLUNTARY EVALUATIONS “SUITABILITY” Non - Traditional Stoppings 30CFR Part defines traditional as steel, concrete etc. Non-combustibility Test ASTM E-119 – (no flames or holes larger than 2 sq. in.) Strength Test ASTM E-72 – (39 PSF min. average.) Ventilation Products – 30CFR Part QA&MTD

Submit: Application Form Toxicity Statement QA Plan Testing Schedules

QA&MTD VOLUNTARY SUBMITTALS Issuance of an “ID” Number for Formulations Applicants are required to list the ingredients of their products by chemical terms in their application Provide MSDS Sheets Chemical suppliers do not want to divulge their proprietary formulations to the applicant.

QA&MTD FIRE RESISTANT HYDRAULIC FLUIDS 30 CFR Part 35 Synthetics Invert EmulsionsWater Glycols High Waters - concentrates Spray FlammabilityAuto Ignition Spray Basic Tests Wick Evaporation

QA&MTD CONTACT INFORMATION John Faini – Jim Erlinger – Bill Kelly – Dave Creamer –