11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # 116337 SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,

Slides:



Advertisements
Similar presentations
Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks.
Advertisements

PRESENTATION FOR CWEA TRAINING Keys to Successful Pipeline/Infrastructure Projects Pipeline Flow Diversion Presented by: Tom Epperson, PE, Tetra Tech.
Town of Mount Airy Main Street Construction Update Community Forum #5 and #6.
Highway 61/147th Street Intersection Business Meeting April 20, 2010.
Hot Springs Public Meeting Reconstruction of US 18 & US 385
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
1 Replacement Reserve Escrow Disbursement Process Training April 2012 CHFA – The Connecticut Housing Finance Authority 999 West Street, Rocky Hill, CT.
City of Berea North End Area Sewer Investigation Project- Phase I Commencing Fall 2011.
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.
Hopkins – St. Louis Park – Minneapolis Regional Sanitary Sewer Improvements Draft Facility Plan January 20, 2010 Metropolitan Council Public Information.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
6 th Street Water Main And Street Reconstruction 2013.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
The City of North Bend Sanitary Sewer System
ESTIMATING By Laith Jacob.
2015 MASS Re-Issue Changes-Division 50. MASS’s many hats Capital Projects Private Development Private Systems Outside communities Agency Use - ADEC PM&E.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Mike Baumann Statewide Utility Engineer January 22, 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
1 ROADS Services Training Group LOCAL AUTHORITY ROADS CONFERENCE 2015 Reforms, Challenges and Safety Treacys West County Hotel, Ennis, May 2015.
E NGINEERING D IVISION 13 th Street Storm Drain Replacement Project Prebid Meeting for Phases 2 & 3.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
Building Permits for Solar Domestic Hot Water Systems Ted Van Vliet Toronto Building October 1 st, 2008 Presented at Solar Neighbourhoods Contractor Workshop.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
Omaha CSO Gilmore Avenue Sewer Separation South Omaha Neighborhood Alliance May 17, 2012.
Public Meeting August 19, 2015 Williams Cr (Shoup Bridge) Replacement Project.
P ART A - S TANDARDS A NNUAL ‘A’ B OOK R EVIEW  Conducted by City of Toledo -Division of Engineering Services  Review Typically performed in Q4.
Hurricane Ike Recovery Projects CDBG Funding Galveston City Council Workshop  Sept. 17, 2015.
Stacey Drake Edwards Program Coordinator. Stacey Drake Edwards, PCDP Coordinator – Procurement Mary Kapelczak – PCDP Support Ron Umali – Facilities John.
BS0502 Flood Protection Erie Street Valve Chamber Platform TS-2575 Prebid Meeting – Technical Presentation May 8 th, 2013.
Aaron Cosentino City of Elgin Rob Linke, P.E., CFM Trotter & Associates, Inc. Lord Street Basin CSO Green Infrastructure Retrofit Project November 14,
Hurricane Ike Recovery CITY OF GALVESTON March 26, 2015.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
Brownfields 101 Environmental Engineering Considerations Presented By: Ileen Gladstone, P.E., LSP, LEED.
CONSTRUCTION OF SOUNDVIEW AVENUE SEWER LINING PROJECT INFORMATIONAL MEETING JULY 14, 2014; 7 PM STAMFORD GOVERNMENT CENTER 6 TH FLOOR TRAINING ROOM.
South Central Economic Development District. Community Development Block Grants For Housing Housing grants support rehabilitation of owner- and renter-occupied.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
Gate Rehabilitation – Phase 1 NS09, NS10 and NS12 Contract C98045C03 Prebid Meeting – Technical Presentation May 9 th, 2013.
The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
Heritage Park Area Construction Update July 28, 2015
Middlebelt Transport and Storage Tunnel (MTST) Project
5th Street Bridge Replacement Project Contract No
Manchester’s CSO Program: A Look Behind and a Look Ahead
107th & 110th Avenue North Public Utilities Renewal Projects
CONTRACT DOCUMENTS & CONSTRUCTION
IA 122 RECONSTRUCTION PRE-BID MEETING
Water Department has Six Divisions
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
25th Avenue Grade Separation
25th Avenue Grade Separation
City of Greater Sudbury Lining Program Overview. Brittany Hallam, P
Harbour Island Force Main Replacement
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
2019 Capital Program Title of Presentation
Bunker Project Schedule/Budget
Design and Engineering Services
Presentation transcript:

11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers, MH, & C/O Project Limits: East to West: NE 33 rd NE 24 th Ave. North to South: NE Stanton ST to NE Broadway Engineer’s Estimate: $3.27M BES Phase II Sewer Rehab Program

22 Agenda 1)Introductions and Program Overview 2)General Bidding & Contract Requirements (Purchasing) 3)Construction Highlights 4)Specifications 5)Measurement and Payment 6)Testing 7)Schedule Highlights 8)Q/A BES Phase II Sewer Rehab Program

33 I Program Overview:  Phase II Structural Rehab Program  Five-year $123 Million dollar program. BES Phase II Sewer Rehab Program

II General Bidding & Contract Requirements

55 III Construction Highlights:  This is a neighborhood construction project 38 different City blocks Plan Set 38 sheets BES Phase II Sewer Rehab Program

6 III Construction Contract Document Highlights  Geotechnical Report  Environmental Report  Noise Variance  Utility work and project coordination with other projects in the area

77 III Construction  Sewer Mainline Work includes: Video all Mainline Open Cut Excavation for New Sewer Mainline - replacement - relocation (realignment) CIPP Lining  MH to MH  Sectional Lining Manned Entry Surface Repair of Sewer Mainline Installation of New Manholes Rehab MH & Bases Street Restoration BES Phase II Sewer Rehab Program

88 III Construction  4 Scenarios for Lat. 1.Install new laterals where identified on plans 2.Video and replace laterals where open cut sewer mainline is installed (as directed by the owner) 3.Video and replace laterals at spot repairs (as identified by the owner) 4.Video and install lateral CIPP liner and cleanout Note: contractor to video all laterals where open cut occurs. Laterals not associated with spot repairs on CIPP mainline or spot repairs on mainlines will not be inspected. BES Phase II Sewer Rehab Program

9 III Construction Highlights  Spot repair data table, labels and symbols M# - Manned Entry surface repair S# - Sanded collar lateral repair R# - Mainline spot repair C# - CIPP sectional liner LC# - CIPP liner, lateral Each repair ID is one spot repair BES Phase II Sewer Rehab Program

10 III Construction Highlights  Lateral Replacement: Scenario 1 BES Phase II Sewer Rehab Program

11 III Construction Highlights  Lateral Replacement: Scenario 2 BES Phase II Sewer Rehab Program

12 III Construction Highlights  Lateral Replacement: Scenario 3 BES Phase II Sewer Rehab Program

13 Construction Highlights  Lateral Replacement: Scenario 4 BES Phase II Sewer Rehab Program

14 III Construction Highlights  Determining Replacement of Laterals BES Phase II Sewer Rehab Program

15 III. Construction Highlights  Street Restoration Have S.O.P. standard drawing for P-505 in Spec. Book  Planning work 00120(c)(7) – Need to visit site Construction Equipment restrictions Responsibility for damages Preservation of Existing Improvements Trench Protection/ Dewatering Measurement & Payment for Street Restoration BES Phase II Sewer Rehab Program

16 IV. Specifications  The Non-Standard Specs include: 408 – Lateral Lining 410 – Pipe Lining 413 – Sectional Pipe Lining 490 – Manhole rehabilitation BES Phase II Sewer Rehab Program

17 IV. Specifications  Some Modified Specs include: 401 – Video and Electronic Inspection of Sewers 405 – Allowing the Use of Native (Class A) Backfill 445 – Laterals, Cleanouts over Existing Laterals, Lateral Connections 490 – Work on Existing Sewers and Structures, Spot Repairs BES Phase II Sewer Rehab Program

18 V. Measurement & Payment  Mainline lateral connections: Open cut paid via bid item Spot repair bid item includes incidental items including connections and the first 4’ of lateral pipe. See BES Phase II Sewer Rehab Program

19 V. Measurement & Payment  Flagging is paid as Lump Sum Temporary Protection and Direction of Traffic – BI #2 Flaggers, as Directed by Owner – BI #4 BES Phase II Sewer Rehab Program

20 V. Measurement & Payment  Pipe Connections Temporary Lateral Connections:  No Separate or additional payment will be made for Temporary Lateral Connections  Spec 490 has been modified. See Spec for detail Connections to Structures:  No separate or additional payment will be made for connecting existing pipes to new manholes and connecting new pipes to existing manholes and inlets. BES Phase II Sewer Rehab Program

21 V. Measurement & Payment  CIPP liner, lateral  CIPP sectional liner  Stainless steel shear band vs. concrete closure collars  Sanded collar lateral repairs  Cleanouts  Diversion of flow  Spot repairs  Reconstruct vs. rehabilitation of MH base BES Phase II Sewer Rehab Program

22 VI. Testing  Sampling and Testing Requirements include: CIPP Testing Open Cut Spot repairs Manned Entry Repair Lateral Cleanouts Manhole rehabilitation Owners representative must be present for testing as required BES Phase II Sewer Rehab Program

23 VII. Schedule Highlights BES Phase II Sewer Rehab Program  Rose Festival Moratorium: Friday May 30 th - Tuesday June 10 th Contact: PBOT, Jeri Jenkins  Sheets affected by the Portland Rose Festival Moratorium: C10, C43, C44, C45, C46, C47, C48  Parades  Sheets C43-C48 are all CIPP lined pipe with spot repair work. Spot repairs need to be complete prior to the CIPP lining.

24 VII. Schedule Highlights  Contract and Liquidated Damages The Contract Duration is One Calendar Year The Liquidated Damages are $1,490 per Calendar Day BES Phase II Sewer Rehab Program

25 Questions? BES Phase II Sewer Rehab Program